AN EXAMINATION OF EFFECT OF OFF SHORE UNIT ON PROJECT FINANCING IN NIGERIAN ECONOMY

  • Type: Project
  • Department: Accounting
  • Project ID: ACC2758
  • Access Fee: ₦5,000 ($14)
  • Pages: 28 Pages
  • Format: Microsoft Word
  • Views: 1.1K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT.
This project is a very crucial study for the off – shore banks to establish a way of financing in Nigeria. In carrying out this research work I intended to determine the possibility of off – shore banking operation in Nigeria.
    Secondly, whether there is enough multinational firms and corporation to carry out the function of off – shore banking unit in Nigeria. Finally, it is possible for the off – shore banking unit in Nigeria and operation to assist the government financially.
    It was on this base that I the researcher made the recommendation and conclusion to improve the operational system of off – shore banking unit in Nigeria.

TABLE OF CONTENT.

CHAPTER ONE
1.1. Background of the study
1.2. Statement of problem.
1.3. Objectives of the study.
1.4. Significance of the study.
1.5. Limitation of the study.

CHAPTER TWO
2.1 Review of related literature.

CHAPTER THREE.
RESEARCH DESIGN AND METHODOLOGY.
3.1. Sources of data
3.2 locations of data
3.3. Method of data collection.

CHAPTER FOUR
4.1 Findings.

CHAPTER FIVE
5.1 Conclusion
5.2 RECOMMENDATIONS AND BIBLIOGRAPHY.

AN EXAMINATION OF EFFECT OF OFF SHORE UNIT ON PROJECT FINANCING IN NIGERIAN ECONOMY
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Accounting
  • Project ID: ACC2758
  • Access Fee: ₦5,000 ($14)
  • Pages: 28 Pages
  • Format: Microsoft Word
  • Views: 1.1K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Accounting
    Project ID ACC2758
    Fee ₦5,000 ($14)
    No of Pages 28 Pages
    Format Microsoft Word

    Related Works

    (NBCI) ABSTRACT It is generally accepted that development banks like most other types of financial institutions are facing a number of problems that most pressing and immediate of these, the problems of project financing and implementation are most exacting... Continue Reading
      ABSTRACT It is generally accepted that development banks like most other types of financial institutions are facing a number of problems that most pressing and immediate of these, the problems of project financing and implementation are most exacting and formidable. This study is therefore carried out as a first step towards identifying these... Continue Reading
    ABSTRACT It is generally accepted that development banks like most other types of financial institutions are facing a number of problems that most pressing and immediate of these, the problems of project financing and implementation are most exacting and formidable. This study is therefore carried out as a first step towards identifying these... Continue Reading
    PROPOSAL In an ordinary parlance, deficit financing can be seen as a budgetary situation whereby the expenditure of the government exceeds its revenue, accumulated through tax. This budgetary system is undertaken by many developing countries of the world as a means of achieving some macro-economics objectives. In conventional settings, deficit... Continue Reading
    PROPOSAL In an ordinary parlance, deficit financing can be seen as a budgetary situation whereby the expenditure of the government exceeds its revenue, accumulated through tax.  This budgetary system is undertaken by many developing countries of the world as a means of achieving some macro-economics objectives.   In conventional settings,... Continue Reading
    ABSTRACT The refurbishment of the fluid flow demonstration unit was carried out in the Chemical Engineering pilot plant laboratory of the Institute of Management and Technology Enugu. The refurbishment process was carried out to ensure adequate functioning of the unit, to allow the continuous use of equipment in the pilot plant, so that student... Continue Reading
    ABSTRACT The refurbishment of the fluid flow demonstration unit was carried out in the Chemical Engineering pilot plant laboratory of the Institute of Management and Technology Enugu. The refurbishment process was carried out to ensure adequate functioning of the unit, to allow the continuous use of equipment in the pilot plant, so that student... Continue Reading
    BANKS’ FINANCING SMALL SCALE BUSINESS UNIT (A CASE STUDY OF UNION BANK OF NIGERIA PLC ENUGU BRANCH) ABSTRACT The purpose of the project is to know to the extent small businesses in Nigeria has been able to obtain loans and advances from Nigeria commercial bank as a major sources finances to the economy. The term “small scale business” are... Continue Reading
    ABSTRACT The purpose of the project is to know to the extent small businesses in Nigeria has been able to obtain loans and advances from Nigeria commercial bank as a major sources finances to the economy. The term “small scale business” are those small businesses that fall within the category of business with not more than five hundred... Continue Reading
    ABSTRACT The purpose of the project is to know to the extent small businesses in Nigeria has been able to obtain loans and advances from Nigeria commercial bank as a major sources finances  to the economy. The term “small scale business” are those small businesses that fall within the category of business with not more than five hundred... Continue Reading
    Call Us
    whatsappWhatsApp Us