MANAGEMENT OF MATERIALS ON BUILDING CONSTRUCTION SITE

  • Type: Project
  • Department: Building
  • Project ID: BLD0009
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 4.1K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Abstract

The control of materials on construction sites is handled carelessly by planning and purchasing departments, site supervisors and engineers as well as contractor’s organization and this have been posing various problems to contractors in realizing reasonable profit margin. The research centered on the assessment of materials management on building projects in Ondo-State Nigeria. This study assessed the current practices of managing materials on building projects, the problems associated with materials management and measures for managing materials in building projects in Ondo state. The study was carried out through the administration of questionnaire to professionals in both consulting and contracting firms and data collected were analyzed using percentile and mean item score. The study reveals that purchasing of materials, material planning method and transportation of materials are the most common practices of materials Management. The most severe problem militating against materials management was lack of proper work planning and scheduling while other problems include inadequate cash flow to contractors due to delayed payments, burglary, theft and vandalism. The study recommends that management should improve their supervision on site, materials should be adequately handled when delivered, care should be given to materials handling process and more awareness should be given to the knowledge of materials management on building projects most especially on construction sites

Keywords

References

·         [1] Adedayo, A.O., Ojo, O. & Obamiro, J. K. (2006). Operations Research in Decision Analysis and Production Management. Pumark: Lagos.

·         [2] Akintoye, A. (1995). Just in time Application and implication for building material management. Journal of construction management and economics.

·         [3] Alwi, S., Hampson, K., Mohamed, S. (1999). Investigation on the relationship between rework and Site Supervision in High Building construction in Indonesia. The second international conference on construction process reengineering.

·         [4] Ahuja, Hira, N. and S, P, Dozzi (1994). Project management techniques in planning and controlling construction projects, Second Edition, John Wiley& Sons Inc., New York.

·         [5] Anwar, Z. Sohail, M. Shazia N. Hashim. H & Muhammad, S. A (2015). Factors Affecting Material Procurement, Supply and Management in Building Projects of Pakistan: A Contractor’s Perspective.

·         [6] Bailey P. and Farmer, D.(2002). Materials management Handbook, Gower Publishing Company Limited, Aldershot, Hants, England.

·         [7] Bell, L. and Stukhart, G. (2007). Attributes of Materials Management Systems. Journal of Construction Engineering and Management.

·         [8] Bell, L.C and G. Stukhart, G (1986) “Attributes of material management systems”, ASCE.

·         [9] Bernold, L.E, and Tresler, J.F., (1999). Vendor analysis for Best Buy in construction, journal of construction Engineering and management,

·         [10] Bowersox, D.J. & Closs, D.J. (1996). Logistical Management: The Integrated Supply Chain Process. New York: The McGraw-Hill Companies, Inc.

·         [11] Burt, N. D., Dobler, W. D. & Starling, L. S. (2003). World Class Supply Management: A Key to Supply Chain Management. McGraw Hill.

·         [12] Cavinato, J.L (1999). Purchasing and Materials management, west publishing Minnesota.

·         [13] Chandani, K. (2007). Identification of material wastage in residential buildings, NICMAR Journal of construction Management, pp. 13.

·         [14] Chandler, I.E. (2001).Materials management on building sites. The Construction Press Ltd Lancaster, England.

·         [15] Chan, F T S (2002). Design of material handling equipment selection system: an integration of expert system with analytic hierarchy process approach. Integrated Manufacturing Systems.

·         [16] Chimay J.A.(2006). Potential for improving site management practices through knowledge management, Construction innovation: Information, process, management, 6(4).

·         [17] Collis, J and Hussey, R. (2003). Business research: A practical guide for undergraduate and postgraduate students. 2ndedition. New York: Palgrave Macmillan.

·         [18] Damodara, K. (1999). Materials management: The key to successful project management, Journal of management in engineering pp. 33.

·         [19] Donyavi, S. and Flanagan, R. (2009). The impact of effective material management on construction site performance for small and medium sized construction enterprises. In: Dainty, A.R.J. (Ed) Procs 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK, Association of Researchers in Construction Management, 11-20.

·         [20] Eckles, R.W.Carmichael, R. L. & Sarchet, B. R (2005). Supervisory management: a short course in supervision. Wiley, New York.

·         [21] Formoso, C. T., Soibelman, L., De Cesare, C. & Isatto, E. L, Material Waste in Building Industry: Main Causes and Prevention, Journal of Construction Engineering and Management.

·         [22] Gossom, W. J (2003). Control of projects, purchasing and materials,penn well publishing company, Tulsa, Oklahoma win: Boston, Seventh Edition.

·         [23] Gulghane A. and Khandve, P.V (2015). Management for Construction Materials and Control of Construction Waste in Construction Industry: A Review. Int. Journal of Engineering Research and Applications pp. 59-64.

·         [24] Griffith, A. and Watson, P. (2004). Construction management: principles and practices. Palgrave MacMillan, New York

·         [25] Goodrum, M. & Haas, T. (2009). Long-term impacts of equipment technology on labour productivity in the U.S construction industry at the activity level. Journal of construction engineering and management, 1(1): 124-133.

·         [26] Hendrickson, C and Tung A (1998). Project management for construction. 1st ed. Prentice Hall.

·         [27] Hafez, N (2011): Residential projects obstacles and problems in Kuwait.Unpublished “MSc project” Department of Civil Engineering, Kuwait University.

·         [28] Ocheoha, I.A and Moselhi, O. (2013). Impact of building information modeling on just-in-time materialDelivery. Department of Building, Civil and Environmental Engineering, ConcordiaUniversity 1455 De Maisonneuve Blvd. West Montreal, Canada.

·         [29] Kanimozhi, G and Latha, P (2014). Material Management in Construction Industry. Indian Journal of Applied research, Vol. 4, Issue 4, 6-9.

·         [30] Kasim, N.B, Anumba, C.J & Dainty, A.R (2005). Improving materials management practices on fast-track construction projects. In: Khosrowshahi, F (Ed.), SOAS, University of London. Association of Researchers in Construction Management

·         [31] Kazaz, A., Manisali, E. & Ulubeyli, S. (2008). Effects of basic motivation factors on construction workforce productivity in Turkey. Journal of civil engineering and management, 14(2): 95-106.

·         [32] Kevin A.O. (2012). Evaluation of materials management strategies in the Nigerianconstruction industry, International journal of management sciences and Business Research

·         [33] Kareem, K.R and Pandey, R.K. (2013). Study of Management and Control of Waste Construction Materials in Civil Construction Project, International Journal of Engineering and Advance Technology.

·         [34] Leenders, R. M. Fearon, E. H. Flynn, E. A. & Johnson, F. P. (2002). Purchasing and Supply Management. Boston: Mcgraw-Hill Irwin, Twelfth Edition.

·         [35] Miles, M.E., G Berens and M.A Weisis (2000). Real estate development, principles and process; third edition Washington D.C; Urban Land Institute.

·         [36] Nathan G, Chin L, &Ataur, R.(2010). Recycling of construction and demolition materials as part of the waste Minimization strategy.

·         [37] Neo R. B and Koh T.J (1995). In Yeo KT, (ed), Accounting for waste in construction proceedings of the first international conference on construction project management, Singapore, 399-406.

·         [38] Nunnally, J.C. (1978). Psychometric theory, 2ndedition, New York: McGraw- Hil, 345-362.

·         [39] Narimah, B.K. (2008). Improving Materials Management on construction projects. A Doctoral Thesis Submitted in partial fulfillment of the requirements for the award of Doctor of Philosophy of Loughborough University.

·         [40] Obiegbu, M.E. (2009). Unique Roles of Professional Builders in the Society. Being a paper presented at the One day Seminar organized by the Rivers and Bayelsa States Chapter of the Nigerian Institute of Building held at Port-Harcourt, Nigeria on the 18th November.

·         [41] Ojo, G.K. (2005). An Assessment of Factors Influencing Contract Period of Construction Projects In South Western Nigeria; Towards a Sustainable Built and National Environment; Proceedings of Faculty of EDM AnnualConference; Obafemi Awolowo University, Ile-Ife; 119-125.

·         [42] Omotosho, K.P. (2006). An Investigation into Material Control System on Construction Sites in Nigeria; Unpublished PGD Dissertation; Department of Quantity Surveying; The Federal University of Technology, Akure.

·         [43] Poon, C.S. (2007). Management and recycling of demolition waste in Hong Kong. Waste management and Reasearch 15(1), 561-572.

·         [44] Patil A.R, Smita V. Pataskar, S.V. (2013). Analyzing material management techniques on construction project. International Journal of Engineering and Innovative Technology (IJEIT) 3(4), 96-100.

·         [45] Park, H.K, S.H and Russell J.S. (2005). Cash flow forecasting model for general contractors using moving weights of cost categories, Journal of management in Engineering.

·         [46] Phu, N. L and Cho, A. M (2014). Factors Affecting Material Management in Building Construction Projects. International journal of Scientific Engineering and Technological Research 03(10), 2133-2137.

·         [47] Prabu, V. and Baker, M.(1986). Materials Management. McGraw-Hill, UK.

·         [48] Navon, R and Berkovich O. (2005). An automated model for materials management and Control. Construction Automation Laboratory – Faculty of Civil Engineering, Technion City.

·         [49] Rivas, A. Borcherding, D. Gonzalez, V. & Alarcon, F. (2011). Analysis of factors influencing productivity using craftsmen questionnaires:Case study in a Chilean construction company. Journal of construction engineering and management, 312-320.

·         [50] Skoyles, E.F and Skoyles, J.R (1987). Waste prevention on site. London: Mitchell.

·         [51] Stock, J.R. & Lambert, D. M. (2001). Strategic Logistics Management. Boston; McGraw-Hill, International Edition.

·         [52] Thomas, H. Sanvido, V. & Sanders, S. (1989). Impact of material management on productivity – A case study. Journal of Construction Engineering and Management.

·         [53] Madhavi, T.P, Mathew, S.T & Sasidharan, R (2013). Material Management in construction, International journal of research in engineering and technology. IC-RICE Conference Issue | Nov-2013. Pp. 400-403.

·         [54] Tersine, R. J. and Campell, J.H.(1977). Modern Materials Management, North Holland Publishing Company, Amsterdam, the Netherlands.

·         [55] Tompkins, J. A and White, J A (1984). Facilities Planning. New York: John Wiley and Sons.

·         [56] Muralitharan, T. and Elangovan, T. (2015). Safety and Analysis in Material Handling of Construction Industry, Middle-East Journal of Scientific Research .

·         [57] Teo, M. and Loosemore (2001.) M. “A theory of waste behaviour in the construction industry.” Journal of Construction Management and Economics.

·         [58] Theodore, J.T (2002). Managing the construction project, A practical Guide to Project Manager. New York: John Wiley and Sons.

·         [59] Vieira, G.B, Pasa, G.S, Borsa, M.O, Milan, G.S & Pandolfo, A. (2011) Material Management: A case study. Journal of Operations and Supply Chain Management, 4(2), pp. 19-30.

·         [60] Vrijhoef, R. & Koskela, L. (2000). The four roles of supply chain management in construction. European Journal of Purchasing & Supply Management.

·         [61] Zeb, A., Malik, S., Nauman, S. Hanif, H. & Amin, M.O. (2015). Factors Affecting Material Procurement, Supply and Management in Building Projects of Pakistan: A Contractor’s Perspective. Proceedings of 2015 International Conference on Innovations in Civil and Structural Engineering (ICICSE’15). Istanbul (Turkey), pp. 170-175.

MANAGEMENT OF MATERIALS ON BUILDING CONSTRUCTION SITE
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Building
  • Project ID: BLD0009
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 4.1K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Building
    Project ID BLD0009
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 50 Pages
    Format Microsoft Word

    Related Works

    CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control... Continue Reading
    CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal... Continue Reading
    ABSTRACT The major purpose of this study was to determine the needs for environmental friendly materials for building construction. The population of the study consisted mostly of big constriction firms in Anambra State that have had more than five years of active construction experience the sample for the study was 10 reputable construction firms... Continue Reading
    Table of Contents CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY The combined building materials are: 1.1.1  HISTORY OF KANO CITY 1.2  PROBLEM STATEMENT 1.3  RESEARCH QUESTIONS 1.4  AIM AND OBJECTIVES 1.5  SCOPE OF THE STUDY 1.6  SIGNIFICANCE OF THE STUDY 1.7  METHODS OF STUDY CHAPTER TWO LITERATURE REVIEW 2.1  DEVELOPMENT AND... Continue Reading
    TABLE OF CONTENT Title page i Declaration ii Certification iii Dedication iv Acknowledgement v Table of contents vi Abstract vii CHAPTER ONE 1.0 Introduction 1 1.1 Statement of the problem 1 1.2 Aim and objectives 2 1.2.1 Objectives of the study 2 1.3 Justification of the study 2 1.4 Scope of study 3 1.5 Methodology 3 CHAPTER TWO 2.0 Literature... Continue Reading
      ABSTRACT The aim of this research is to analyzed and compare the life cycle cost of alternative root covering materials, Zink coat roofing sheet materials, corrugated Asbestos cement roofing materials, concrete decked roof materials, and long span aluminum roofing materials were considered in this research work with the objectives to determine... Continue Reading
    ABSTRACT The building construction industry is very important to the socio-economic development of a nation. It portrays its religions and cultural values as well as the wealth of the nation. In spite of its importance, the construction industry has been regarded as being risky with frequent and high accident rate and Ill-health problems to... Continue Reading
    CHAPTER ONE 1.0     INTRODUCTION 1.1     BACKGROUND OF THE STUDY  The development of soil erosion began when man settled down and started turning pasture land into farmland. The intensive exploitation of the land disturbed the natural soil vegetative cover and exposed its, surface to the effect of erosive agents and to introduce such... Continue Reading
    ABSTRACT The construction is one of the oldest industries in almost every nation. Its importance made it possible for undeveloped countries to rise up to becoming developed Countries. Lately, there have been an undesirable adherence to performance specification in most construction sites in most developing countries. This study seeks to reveal how... Continue Reading
    ABSTRACT The study was carried to critically investigate the analysis of factors influencing material wastage on building sites in Kaduna State. To achieve this objective, three research questions were stated to guide this study. The data collected were analyzed using descriptive statistics, tables and graph to analyze research questions. A... Continue Reading
    Call Us
    whatsappWhatsApp Us