ROUTE SURVEY AND PAVEMENT DESIGN OF THE ROAD LINKING FEDERAL SECRETARIAT AND IMT CIVIL SOIL LABOURATORY AND INDUSTRIAL CENTER.

  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0270
  • Access Fee: ₦5,000 ($14)
  • Pages: 102 Pages
  • Format: Microsoft Word
  • Views: 825
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT
 The study cover a view ad detailed explanation of the modification required to be carried out on the main access road lining federal secretariat and IMT civil soil laboratory and industrial centre order to update it’s services functions. The need for easing the flow of traffic on this access road has risen, since it’s a busy area in the institution. It’s required that the road be modernized and generally upgraded. The existing road is no longer in peak condition and is not capable of performing it’s functions as a result of traffic growth. The study modification therefore involved the assessment of the roads present condition involving carrying out soil test and survey as to what could be done and how best to enhance traffic.
 
TABLE OF CONTENTS
Title page - - - - - - - - i
Certification page  - - - - - ii
Dedication - - - - - - - iii
Acknowledgement - - - - - - iv
Abstract - - - - - - - - v
Table of Content - - --- - - - vi
CHAPTER ONE
General Introduction - - - - - 1
Design Application - - - - - - 3
1.2 Scope of The Project - - - - - 5
1.3 Aim and Objective - - - - - 6 
1.4 Reconnaissance Survey - - - - 8
Chain Survey (Linear Measurement) - -- 8
Station Marking - - - - - - 9
Factors Influencing Station Marking- - - 9
Route Survey - - - - - - - 11
CHAPTER TWO
Project Field leveling works - - - - 13
Instruments used in leveling - - - - 13
Profile leveling - - - - - - - 15
Cross sectional leveling - - - - - 15
Objectives of leveling - - - - - 16
Property lines - - - - - - - 17
Intersecting Roads - - - - - - 18
Definition of some leveling terminologies -- - 18
Setting up and leveling the instrument - - 20
Procedure for leveling operation - - - 23
Adjustment and precaution - - - - 24
Survey Data -- - - - - - - 
Computation of Area - - - - - 27
Cross sectional Area - - - - - - 33
Calculation of Earthwork - - - - - 33

CHAPTER THREE
Soil Analysis --  - - - - - 38
Collection and preliminary preparation of soil sample 38
Mechanical analysis - - - - - - 40
Apparatus Used - - - - - - 41
Sources of Errors - - - - - - 42
Atterberg/Consistency limit test - - - 
Liquid Limit Test - - - - - - 45
Procedure - - - - - - - - 45
Apparatus Used - - - - - - 47
Plasticity Index -- - - - - - - 47
Apparatus Required - - - - - - 47
Precautions - - - - - - - 49
Compaction Test - - - - - - 50
Apparatus Used - - - - - - 52
Procedure - - - - - - - - 53
Precaution - - - - - - -
Test Result on Compactions - - - - 54
The California bearing Ratio test (CBR) Aim - 55
Apparatus Used - - - - - - 53
Procedure - - - - - - - - 53
Calculations for CBR Values - - - - 53
Soaked Sample - - -- - - - 54
CHAPTER FOUR
Geometric Element Design - - - - 56
Basic design Parameters - - - - - 57
Gradient - - - - - - - -  
Horizontal Alignment - - - - - 66
Horizontal Alignment Design Factor - - - 66
Factors to be Considered in the Design - - 67
Controls for Horizontal Alignment - - - 67
Design of Horizontal Curve - - - - 67
Design of Super-elevation for the curve - - 69
Cross sectional elements of the Road - - 73
CHAPTER FIVE
Drainage Design - - - - - - 77
Basic policy on drainage design - - - 77
Economics for drainage design - - - - 79
Roadside drainage channels - - - - 79
Erosion protection - - - - - - 80
State of work in the actual road Construction - 81
Equipment used in Road Construction - - 83
Nomenclatures -- - - - - - - 84
Recommendation - - - - - - 90
Conclusion - - - - - - - 92
References - - - - - 

 


 

ROUTE SURVEY AND PAVEMENT DESIGN OF THE ROAD LINKING FEDERAL SECRETARIAT AND IMT CIVIL SOIL LABOURATORY AND INDUSTRIAL CENTER.
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0270
  • Access Fee: ₦5,000 ($14)
  • Pages: 102 Pages
  • Format: Microsoft Word
  • Views: 825
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Civil Engineering
    Project ID CVE0270
    Fee ₦5,000 ($14)
    No of Pages 102 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT The study cover a view ad detailed explanation of the modification required to be carried out on the main access road lining federal secretariat and IMT civil soil laboratory and industrial centre order to update it’s services functions. The need for easing the flow of traffic on this access road has risen, since it’s a busy area in... Continue Reading
    ABSTRACT  The study cover a view ad detailed explanation of the modification required to be carried out on the main access road lining federal secretariat and IMT civil soil laboratory and industrial centre order to update it’s services functions. The need for easing the flow of traffic on this access road has risen, since it’s a busy area in... Continue Reading
    ROUTE SURVEY OF ROAD AND PAVEMENT DESIGN (REHABILITATION/MODERNIZATION) CASE STUDY: ROAD LINKING FEDERAL SECRETARIAT INDUSTRIAL CENTRE AND MASS COMMUNICATION DEPARTMENT (IMT CAMPUS III), ENUGU ABSTRACT The study cover a view and a detailed explanation of the modification required to be carried out on the main access road linkage of the Campus III... Continue Reading
    ABSTRACT  The project covers a view and detailed explanation of the route survey which in chider reconnaissance surrey, theologize traversing and levelling operation as well as soil tests which includes compaction test, mechanical analysis, plastic and liquid limits and CBR test. The project also covers the design of pavement   and the geometric... Continue Reading
    ABSTRACT This thesis on a project undertaken by the author is aimed at providing explanation of the basic theory  of the  work of road design and its associated activities also, to cover practical methods of working. In pursuit of the meaningful completion this project a lot of investigation was embarked with principles and practice of road... Continue Reading
      ABSTRACT This thesis on a project undertaken by the author is aimed at providing explanation of the basic theory of the work of road design and its associated activities also, to cover practical methods of working. In pursuit of the meaningful completion this project a lot of investigation was embarked with principles and practice of road... Continue Reading
    ABSTRACT This thesis on a project undertaken by the author is aimed at providing explanation of the basic theory of the  work of road design and its associated activities also, to cover practical methods of working. In pursuit of the meaningful completion this project a lot of investigation was embarked with principles and practice of road... Continue Reading
    ABSTRACT This thesis on a project undertaken by the author is aimed at providing explanation of the basic theory of the work of road design and its associated activities also, to cover practical methods of working. In pursuit of the meaningful completion this project a lot of investigation was embarked with principles and practice of road... Continue Reading
    ABSTRACT The study cover a view and a detailed explanation of the modification required to be carried out on the main access road linkage of the Campus III Industrial center from federal Secretariat to Mass Communication Department of the Institution in order to update its services and functions. The need for easing the flow of traffic on this... Continue Reading
    BASIC SOIL TEST ON SUB-GRADE SOIL MATERIAL & FLEXIBLE PAVEMENT DESIGN ON ROAD LINKING – UGWUAJI AND CAMPUS M, IMT; ENUGU, ENUGU STATE PREFACE This case study is an existing pathway or fort path linking Ugwuji and Campus 111 (IMT) for a proposed road construction by the government of Enugu State. This project encloses the following - The... Continue Reading
    Call Us
    whatsappWhatsApp Us