IMPROVEMENT OF BEARING CAPACITY OF SANDY SOIL BY GROUTING

  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0034
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 67 Pages
  • Methodology: Scientific Method
  • Reference: YES
  • Format: Microsoft Word
  • Views: 2.2K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

CHAPTER ONE   
1.0  INTRODUCTION 
The construction of structure on weak ground often requires the soil to be improved in order to ensure the safety and the stability of surrounding buildings. The ground improvement in granular soils can be achieved by different methods such as vibro-floatation, compaction piles, and compaction with explosives, excavation and replacement, grouting e.t.c. The selective of the most suitable method depend on a variety of factors, such as: soil conditions, required degree of compaction, types of structure to be supported, as well as site specific considerations available time for completion of the project, availability of equipment and materials e.t.c. Soil compaction can offer effective solutions for many foundation problems and his especially useful for reducing total settlement in sand. Sandy soil means most of the soil particles are bigger than 2mm in diameter. It gives good water drainage and has a low capacity to hold nutrients. Sandy soil does not hold moisture very well. It is granular and consists of rock and mineral particle that are very small. Therefore, the texture is gritty and is formed by the disintegration and weathering of rocks such as limestone, granite, quartz and shale. Is also easier to cultivate it if it is rich in organic materials but then it allows drainage more than needed. This results in over drainage and dehydration of the plant in summer. It warms very fast in the spring season. Grouting on the other hand is a process whereby stabilizes either in the form of suspension or solution is injected into sub surface soil. Sandy soil is the largest particle in the soil when you rub it, if feels rough. This is because it has sharp edges and it does not hold many nutrients.   
1.1    HISTORICAL BACKGROUND OF GROUTING 
The development and history of compaction grouting over the last 30-40 years as been established by many distinguished researcher, design engineer and design contractor. Many technical papers are been published dealing physically with the issues surround compaction grouting design such as: “compaction grouting, 1973”, “planning and performing compaction grouting” 1974. These and other important reference are the main stream basis of knowledge for the highly specialize engineering and construction technique know as compaction grouting. The compaction grout method as some unique features which allow distinct advantages over other remedial method of geo-technical construction. In many distances growth is the only viable solution. Some of the advantages include: Economic: Many time compaction grouting is the only feasible solution to foundation settlement problems, other than demolishing the structure and re-building with expensive deep foundation technique. Minimal disturbance: During the grouting operation, destructure may remain occupied and in service. Minimal risk: Compaction grouting offers minimal risk of catastrophic structural failure while re-leveling structure. Other are: Minimal geotechnical exploration, provide greater support for structures, cost factor e.t.c.   
1.2   AIM AND OBJECTIVE 
1.     To determine the nature of the sandy soil particles. 
2.     To determine the degree of the sandy soil compatibility. 
3.     To carry out the improvement of sandy soil through grouting. 
4.     To carryout some laboratory test on sandy soil such as compaction test California bearing ration (CBR) test, atterberg LIMIT test, liquid limit test, Plastic limit test, sieve analysis test in comparing the effectiveness of grouting system.   
1.3            SCOPE OF THE STUDY This research is focused on the quality and improvement of bearing capacity of sandy soil by grouting.   
1.4            LIMITATIONS OF THE STUDY The limitations of this study are: 
TIME FACTOR: Limited time that does not permit to carryout many practical. 
AREA OF STUDY: This project is limited the technical study of sandy soil properties.

IMPROVEMENT OF BEARING CAPACITY OF SANDY SOIL BY GROUTING
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0034
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 67 Pages
  • Methodology: Scientific Method
  • Reference: YES
  • Format: Microsoft Word
  • Views: 2.2K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Civil Engineering
    Project ID CVE0034
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 67 Pages
    Methodology Scientific Method
    Reference YES
    Format Microsoft Word

    Related Works

    The sole purpose of this project work is to determine the settlement characteristics of soil for the construction of building, a case study at FUTO Senate Building  area  and FUTO NDDC hostel area, other objectives are the classification of the  soil, determination of the strength properties of these soils and also making of  sundry... Continue Reading
    The sole purpose of this project work is to determine the settlement characteristics of soil for the construction of building, a case study at FUTO Senate Building  area  and FUTO NDDC hostel area, other objectives are the classification of the  soil, determination of the strength properties of these soils and also making of  sundry... Continue Reading
    TABLE OF CONTENT certification _ I Declaration _ Ii Dedication _ Iii Acknowledgement Iv Table Of Content V List Of Figures Vii List Of Tables Viii Abstract Viii CHAPTER ONE : INTRODUCTION _ 1 1.1  Background of Study _ 1 1.2  Objective of Study _ 4 1.3  Significance of Study _ 5 1.4  Scope of Study _ 5 CHAPTER TWO : LITERAURE REVIEW _ 6 2.1... Continue Reading
    PREFACE This case study is an existing pathway or fort path linking Ugwuji and Campus 111 (IMT) for a proposed road construction by the government of Enugu State. This project encloses the following  -    The condition of the existing sub-grade and its suitability for use as a good sub-grade soil material by processes of different lab test.... Continue Reading
    PREFACE This case study is an existing pathway or fort path linking Ugwuji and Campus 111 (IMT) for a proposed road construction by the government of Enugu State. This project encloses the following  -The condition of the existing sub-grade and its suitability for use as a good sub-grade soil material by processes of different lab test. -Using... Continue Reading
    Abstract The Information on the effect of different land use systems on the aggregate stability and carbon sequestration is crucial for the recommendation of efficient land management practices. This study was conducted to evaluate the variation in aggregate stability and carbon sequestration under different land use systems in two agro ecological... Continue Reading
     Abstract The Information on the effect of different land use systems on the aggregate stability and carbon sequestration is crucial for the recommendation of efficient land management practices. This  study was conducted to evaluate the variation in aggregate stability and carbon sequestration under different land use systems in two agro... Continue Reading
    PREFACE This case study is an existing pathway or fort path linking Ugwuji and Campus 111 (IMT) for a proposed road construction by the government of Enugu State. This project encloses the following  -The condition of the existing sub-grade and its suitability for use as a good sub-grade soil material by processes of different lab test. -Using... Continue Reading
    BASIC SOIL TEST ON SUB-GRADE SOIL MATERIAL & FLEXIBLE PAVEMENT DESIGN ON ROAD LINKING – UGWUAJI AND CAMPUS M, IMT; ENUGU, ENUGU STATE PREFACE This case study is an existing pathway or fort path linking Ugwuji and Campus 111 (IMT) for a proposed road construction by the government of Enugu State. This project encloses the following - The... Continue Reading
    Soils for engineering use are often classified based on properties relative to foundation support or as they might perform under pavements and in earthworks. Geotechnical classification systems today are designed to make it easy to equate field observations to estimates of engineering properties. As moisture content of a clay-like soil increases,... Continue Reading
    Call Us
    whatsappWhatsApp Us