DESIGN AND IMPLEMENTATION OF A WEATHER FORECASTING PACKAGE FOR AVIATION INDUSTRY

  • Type: Project
  • Department: Computer Science
  • Project ID: CPU0126
  • Access Fee: ₦5,000 ($14)
  • Chapters: 7 Chapters
  • Pages: 51 Pages
  • Methodology: NIL
  • Reference: YES
  • Format: Microsoft Word
  • Views: 3K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
DESIGN AND IMPLEMENTATION OF A WEATHER FORECASTING PACKAGE FOR AVIATION INDUSTRY
 (AUTOMATED FLIGHT CONTROL SYSTEM)
 ABSTRACT

            The  flagrant rate of plane crash in the country toady has given much concern and desire to carry out this “Design and Implementation of a whether fore-casting package for aviation industries”.
            The researcher having been a student for some years now was disturbed by the rate of plane crash and the rate at which lives and properties worth billions of naira were lost in the process.
            Considering the economic hardship is the society today, changes must be made to the patterns of operation of the Aviation industries is our country so that timely and efficient decision-making is taken for efficient utilization of available resources.
            Meteorologists should be provided with sophisticates instruments and equipment for whether observation and recording is order to reduce the rate of unpredictability in plane-crash in our country. The Nigerian Airport Authority Metrological Department and station was chosen as a case study.
            The expected officers were interviewed in this department. The date used for the design were collected through this method and also through observation methods, which were carried out on several occasions of visit to this organisation. It was observed that, without a whether forecasting package, timely and efficient aviation operation would not be achieved.
 ORGANISATION OF WORK
             This project is divided into seven chapters as follows:
            Chapter One is the introduction. It contains some sub-heading like the statement of the problem, purpose of the study, the aim and objectives of the study, the scope and delimitations, limitations and constraint and the limitations and constraint and the definitions of term.
            Chapter Two deals on the literature review.
            Chapter Three talks about the description and analysis of the existing system which includes the facts findings method used, organisational structure, objective of the existing system, the input, process, and the output analysis, the information flow diagram, the problem of the existing system and the justification of the new system.
             Chapter four is about the design if the new system and it involves output specification and design, input specification and design, file design, procedure chart, system flow chart and the system’s requirement.
            Chapter five is the implementation it include program deign, program flow charts. Pseudocodes, the source program and the test program (run).
            Chapter six deals on documentation
            Chapter seven is made up of the recommendation and conclusion
            Finally, references follow after chapter seven.    
 TABLE OF CONTENTS
CHAPTER ONE
1.0       Introduction
1.1       Statement of the problem
1.2       Purpose of the Study
1.3       Aims and Objectives of the study
1.4              Scope/ Delimitation of study
1.5       Limitations/ Constraints
1.6       Definition of Terms
CHAPTER TWO
Literature Review
CHAPTER THREE
3.0       Description and Analysis of the existing system
3.1              Fact- findings methods used
3.2              Organisational structure
3.3              Objectives of the existing system
3.4       Input, process, output analyses
3.5       Information flow diagram
3.6       Problems of the existing system
3.7       Justification of the new system
 CHAPTER FOUR
4.0       Design of the new system
4.1       Output specification and Design
4.2       Input specification and design
4.2              File Design
4.3              Procedure chart
4.5       System flowchart
4.4              System requirements
CHAPTER FIVE
5.0       Implementation
5.1       Program design
5.2       Program flowchart
5.3              Pseudocodes
5.4              Source Program
5.5              Test Data
CHAPTER SIX
Documentation
CHAPTER SEVEN
7.0              Recommendation and Conclusion
REFERENCES
 TABLE OF FIGURE
 Organisational structure
Information flow diagram
Procedure chart
System flowchart
Program flowcharts.
 CHAPTER ONE
INTRODUCTION
We are all aware of the diverse and important role Aviation can play in the social and economic way of any nation. Aviation provides effective and timely, national and international transport for people and freight. Transport can be defined as factor of the created importance in all economic activities. It appears true to say that the structure of the transportation network tells the story of the economic development within the areas. Each of the main type of transportation so far developed, namely; road, rail and air transportation operates in different manner and places particular areas and sites and has an advantage at least over one another.
Here, we consider only the air transportation, which involves whether predictions before its operations. Whether is the condition of the atmosphere at a certain place at a specific time. It is therefore a day to day or even an hourly affair. Weather is a local. This means time and place of recording is very essential. On the other hand, climate is the description of the average condition of the atmosphere over a considerable area for along time (at least thirty five years). The study of the climate of an area includes, temperature, rainfall, wind and pressure, amount of sunshine, humidity and visibility.
 1.1       STATEMENT OF THE PROBLEM
            Meteorologists usually do the observation and recording of weather inputs. Due to the complex nature of these recording, they encounter some problems during their work. The problem are:-
1.         Lack of adequate instruments and equipment for taking accurate readings and recordings.
2.         Incorrect description of weather inputs by these meteorologists which leads to wrong forecasting.    
3.         Wrong use of database and organisation.
 1.2       PURPOSE OF STUDY
            The need for weather information for the safe generation of aircraft was first recognized on the very day the Wright Brothers (Willbur and Orill) made a historic flight demonstration on 17 December, 1903. during the demonstration sudden strong guest of wind damaged their aircraft. Other flight made during the early year up Aviation indicated that weather information and forecasting played a major role in Aviation operation. It was also discovered that flights were impossible under poor visibility and lows clouds. This situation is still witnessed till date. So, the purpose of this study is to receive meteorologists from the cumbersome nature of their, job, which is hourly observation and recording. It will also reduce the mistake they make in their description of weather condition, which will lead to timely and efficient weather forecasting.
 1.3       AIMS AND OBJECTIVES
            Owing to the problem of inadequate instruments and equipment for taking accurate weather inputs that lead to wrong forecasting and wrong use of database.
            The aim and objectives of this project is to design a weather forecasting package that will help the Aviation industries to weather forecast effectively.
 1.4       SCOPE/DELIMITATION  
            This defines what the precise limits of the possible area are: in this study the scope or delimitation will be meteorological department and weather station of the Enugu State Airport Authority Emene. The methods of weather observation, recording and instruments used will be considered. The reasons for lack of weather forecasters in the organisation will also be taken in account.
 

DESIGN AND IMPLEMENTATION OF A WEATHER FORECASTING PACKAGE FOR AVIATION INDUSTRY
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Computer Science
  • Project ID: CPU0126
  • Access Fee: ₦5,000 ($14)
  • Chapters: 7 Chapters
  • Pages: 51 Pages
  • Methodology: NIL
  • Reference: YES
  • Format: Microsoft Word
  • Views: 3K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Computer Science
    Project ID CPU0126
    Fee ₦5,000 ($14)
    Chapters 7 Chapters
    No of Pages 51 Pages
    Methodology NIL
    Reference YES
    Format Microsoft Word

    Related Works

    ABSTRACT The flagrant rate of plane crash in the country toady has given much concern and desire to carry out this “Design and Implementation of a whether fore-casting package for aviation industries”. The researcher having been a student for some years now was disturbed by the rate of plane crash and the rate at which lives and properties... Continue Reading
    ABSTRACT The  flagrant rate of plane crash in the country toady has given much concern and desire to carry out this “Design and Implementation of a whether fore-casting package for aviation industries”. The researcher having been a student for some years now was disturbed by the rate of plane crash and the rate at which lives and properties... Continue Reading
    DESIGN AND IMPLEMENTATION OF A WEATHER FORECASTING PACKAGE FOR AVIATION INDUSTRY  (A CASE STUDY OF PORT – HARCOURT INTERNATIONAL AIRPORT OMAGWA ) ABSTRACT             This Project work is based on weather forecast package for aviation industry using Port-Harcourt International Airport (Omagwa) as a case study. The Occurrence of plane... Continue Reading
    ABSTRACT Design and implementation of weather forecasting package for aviation industry is discussed in this research work using Sam Mbakwe Airport, Owerri – Imo State as a case study. With its objectives research work as follows: To help aviation Meteorologists issue accurate weather forecasts. To enable aviation industry to make decisions on... Continue Reading
    Design and implementation of weather foresting package for aviation industry is discussed in this research work using Sam Mbakwe Airport, Owerri – Imo State as a case study. With its objectives research work as follows: To help aviation meteorologists issue accurate weather forecast. To enable aviation industry to make decision on control based... Continue Reading
    Design and implementation of weather foresting package for aviation industry is discussed in this research work using Sam Mbakwe Airport, Owerri – Imo State as a case study. With its objectives research work as follows: To help aviation meteorologists issue accurate weather forecast. To enable aviation industry to make decision on control based... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1            Background 1.2            Aims/objective of the project 1.2.1     Statement /purpose 1.3            Justification of the project 1.4            Scope of the project CHAPTER TWO 2.0     Literature Review CHAPTER THREE 3.0     overview of the existsting system 3.1          ... Continue Reading
    CHAPTER ONE GENERAL INTRODUCTION 1.1                      INTRODUCTION Weather forecasting is the application of science and technology to predict the state of the atmosphere for a given location. Human beings have attempted to predict the weather informally for millennia, and formally since... Continue Reading
    Internet of Things has been described as a system of related computing devices, machines, animals or people that are provided with unique identifiers to capture and transfer data over a network without requiring human intervention or human-to-computer interaction. It has been used in several fields such as surveillance, tracking and weather... Continue Reading
    ABSTRACT  The research work “Sales -Forecasting System”  is a sales system using ‘point of sales ( POS ) technology to achieve its sales, accounting and linear regression model for sales forecast included in the system is the supplier registration and management, product registration and management, user management, customer management... Continue Reading
    Call Us
    whatsappWhatsApp Us