WIND POWER AND SOLAR PV RENEWABLE ENERGY GENERATION ON AN ISLAND OF GREAT CUMBRAE

  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0209
  • Access Fee: ₦5,000 ($14)
  • Chapters: 14 Chapters
  • Pages: 45 Pages
  • Methodology: Scientific
  • Reference: YES
  • Format: Microsoft Word
  • Views: 1.4K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

WIND POWER AND SOLAR PV RENEWABLE ENERGY GENERATION ON AN ISLAND OF GREAT CUMBRAE

Table of Contents

1. Introduction 

2. Electricity Demand 

3. Wind Power System 

4. Floating Solar Photovoltaic (PV) System 

5. Electricity Storage Systems ____

6. Site Choice 

7. Planning Permission Statement 

8. Environmental Impact Assessment _

9. Project Plan 

10. Construction Plan 

11. Health and Safety Plan 

12. Quality Plan 

13. Financial Assessment 

14. Conclusion 

16. Appendices 


1. Introduction

The Scottish Government has outlined in the Scottish Energy strategy plan that Scotland has a target to generate 100% of its electricity from renewable energy by 2020 [1]. Therefore, in order to pursue this target, renewable energy projects are continuously implemented across different regions in Scotland, resulting in a project proposal for a renewable energy (RE) system on the Island of Great Cumbrae. The following report will present a project plan for the proposed RE system and assessments of the project will be followed.

1.1 Project Aim and Objectives

The project aim is to design a RE system that can fully meet the current and projected electricity demands for the Island of Great Cumbrae, and the project has three goals:

Ensure the RE system can provide a stable electricity output and meet the calculated total annual demand of 11.29 GWh.

Minimise the environmental and social impact that are related to the RE system.

Ensure the RE system is technically and financially viable.

1.2 Project Area

The Island of Great Cumbrae is located off the North Ayrshire coast and accessible by ferry from the mainland city of Largs [2, 3]. The island is around 6.4km long and 3.2km wide, with a boundary of 16.6km by circumference [2, 4]. Great Cumbrae has a population of around 1,800, with the majority of commercial activities being concentrated in Millport in the southern part of the island where most of the habitants live [2, 4]. The main transport link is the circular road around the circumference of the coast that connects the whole island [4].


WIND POWER AND SOLAR PV RENEWABLE ENERGY GENERATION ON AN ISLAND OF GREAT CUMBRAE
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0209
  • Access Fee: ₦5,000 ($14)
  • Chapters: 14 Chapters
  • Pages: 45 Pages
  • Methodology: Scientific
  • Reference: YES
  • Format: Microsoft Word
  • Views: 1.4K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Electrical Engineering
    Project ID ELE0209
    Fee ₦5,000 ($14)
    Chapters 14 Chapters
    No of Pages 45 Pages
    Methodology Scientific
    Reference YES
    Format Microsoft Word

    Related Works

    The energy generation and power consuming loads at Brass LNG facility located in Brass Island, Bayelsa State Nigeria were analyzed and compared with expected demand changes and means of minimizing cost and greenhouse gas emission were also proffered with wind and solar energy penetration into the overall power mix . The wind and solar hybrid power... Continue Reading
    The energy generation and power consuming loads at Brass LNG facility located in Brass Island, Bayelsa State Nigeria were analyzed and compared with expected demand changes and means of minimizing cost and greenhouse gas emission were also proffered with wind and solar energy penetration into the overall power mix . The wind and solar hybrid power... Continue Reading
    An energy audit on the Brass Liquified Natural Gas plant at Brass Island former Agip facility was carried. The average offshore windspeed and wave return periods for 12months  were measured for their wind and wave energy potentials. Also,  the solar insolation for the location was collected for a 12month period. A pilot design based on... Continue Reading
    An energy audit on the Brass Liquified Natural Gas plant at Brass Island former Agip facility was carried. The average offshore windspeed and wave return periods for 12months  were measured for their wind and wave energy potentials. Also,  the solar insolation for the location was collected for a 12month period. A pilot design based on... Continue Reading
    L (A CASE STUDY OF COMPUTER SCIENCE ND SOFTWARE LAB) CHAPTER ONE INTRODUCTION 1.1   BACKGROUND TO THE STUDY The use of renewable energy increased greatly just after the first big oil crisis in the late seventies. At that time, economic issues were the most important... Continue Reading
    In this study of designing a wind turbine using wind energy potential, a case of FUTA. Weibull distribution function method was adopt with the help of probability density function and cumulative density function analysis, the wind speed characteristics and energy potential of the study area was investigated using hourly wind speed data that span... Continue Reading
    In this study of designing a wind turbine using wind energy potential, a case of FUTA. Weibull distribution function method was adopt with the help of probability density function and cumulative density function analysis, the wind speed characteristics and energy potential of the study area was investigated using hourly wind speed data that span... Continue Reading
    ABSTRACT This work is concerned with the features, analysis and design of a stand-alone solar energy based power supply with maximum power point tracking (MPPT) scheme. The features and operations of various types of solar cells and panels and the performance characteristics under varying temperature and irradiance conditions are studied.... Continue Reading
    Abstract This project work centered on construction of 12V/10A solar charge controller that is needed in photovoltaic system to safely charge regulate and discharge of sealed lead acid battery through DC load. Solar charge controller is devices that regulate solar photovoltaic power and prevent overcharging, over discharging or overflow of current... Continue Reading
    Abstract This project work centered on construction of 12V/10A solar charge controller that is needed in photovoltaic system to safely charge regulate and discharge of sealed lead acid battery through DC load. Solar charge controller is devices that regulate solar photovoltaic power and prevent overcharging, over discharging or overflow of current... Continue Reading
    Call Us
    whatsappWhatsApp Us