DESIGN AND CONSTRUCTION OF A FOUR WAY TRAFFIC LIGHT CONTROL

  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0234
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 46 Pages
  • Methodology: nil
  • Reference: YES
  • Format: Microsoft Word
  • Views: 1.7K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

A traffic light also known as a traffic signal,  stop light and go light, robot or semaphore is a signally device positioned at four (cross) junction, pedestrian crossing or other locations in other to indicate when it is safe to drive or walk using a universal color code ( and in precise sequence for those that are color blind).

Traffic light system operate on a turning mechanism that changes the light after a given interval of 7-120 seconds depending on the traffic congestion on the cross junction roads.

The traffic light system is fabricated to curb traffic jams, avoid hold ups and reduce wait time for both vehicles. Although the traffic light system can be modified to suit different roads, it is intended for a four junction with dual carriage way having relatively unequal traffic dersities in all four directions and can easily be implemented in real life situation.


TABLE OF CONTENT

Title page ………………………………………………………………………………… i

Certification ……………………………………………………………………………… ii

Dedication ………………………………………………………………………………… iii

Acknowledgement ……………………………………………………………………… iv

Abstract ……………………………………………………………………………………

Table of content ……………………………………………………………………..… vi

CHAPTER ONE

1.0 Introduction …………………………………………………………………… 1

1.1     Background of study ……………………………………………………… 1

1.2     Aims of the project ………………………………………………………… 3

1.3     Objectives ……………………………………………………………………… 4

1.4   Significance of Study ……………………………………………………… 4

1.5   Limitation of scope of study …………………………………………… 5

1.6     Project Description ………………………………………………………… 6

CHAPTER TWO

2.1 Literature Review …………………………………………………………… 8

2.2     History of Traffic Light Control Systems …………………………… 9

2.3     Types of Traffic Light ……………………………………………………… 11

2.3.1  Three set Lights ……………………………………………………………… 11

2.3.2  Pedestrian Crossing Light ………………………………………………… 12

2.3.3  Lights for Public Transport ………………………………………………… 12

2.3.4  Lights for cyclist ……………………………………………………………… 13

2.4     Colors ……………………………………………………………………………… 13

2.5   Turning signals and rules …………………………………………………… 14

2.6   Lane Control …………………………………………………………………    14

2.7   Brief literature review of components ………………………………… 15

2.7.1  Line Circuit Breaker ………………………………………………………… 15

2.7.2  Push Button Switch ………………………………………………………… 15

2.7.3  Main Contactor ……………………………………………………………… 16

2.7.4  Auxiliary Contactor ………………………………………………………… 16

2.7.5  Timer Delay Relay ………………………………………………………… 17

2.7.6  Voltmeter ……………………………………………………………………… 18

2.7.7  Ammeter ………………………………………………………………………… 18

2.7.8  Indicator Lamp ………………………………………………………………… 18

2.7.9  Green Traffic Light …………………………………………………………… 19

2.7.10 Amber Traffic Light …………………………………………………………… 19

2.7.11 Red Traffic Light …………………………………………………………… 19

2.7.12 Cables …………………………………………………………………………… 19

2.7.13 Connectors …………………………………………………………………… 20

2.8    Advantages of a traffic light control …………………………………… 20

2.9   Disadvantages of a traffic light control ………………………………… 21

CHAPTER THREE

3.0 Methodology ……………………………………………………..………………. 23

3.1    System Designation …………………………………………………………… 23

3.2    Block diagram of the Traffic Light Circuit ……………………………… 24

3.3    Power supply for the circuit ………………………………………………… 25

3.4    The circuit diagram …………………………………………………………… 27

CHAPTER FOUR

4.0     Problem Encountered ………………………………………………………… 28

4.1     Construction and Testing …………………………………………………… 28

4.2     Circuit components and description ………………………………… 29

CHAPTER FIVE

5.1    Summary/Conclusion ………………………………………………………… 30

5.2    Recommendation ……………………………………………………………… 31

References ………………………………………………………………………………… 32

DESIGN AND CONSTRUCTION OF A FOUR WAY TRAFFIC LIGHT CONTROL
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0234
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 46 Pages
  • Methodology: nil
  • Reference: YES
  • Format: Microsoft Word
  • Views: 1.7K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Electrical Engineering
    Project ID ELE0234
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 46 Pages
    Methodology nil
    Reference YES
    Format Microsoft Word

    Related Works

    ABSTRACT The project “microcontroller based intelligent traffic light system with automatic street light and warning light” was designed to tackle the traffic issues in the country so as to establish automatic traffic control and monitoring system with near perfection.  The project intelligent traffic light with automatic street light and... Continue Reading
    ABSTRACT The project “microcontroller based intelligent traffic light system with automatic street light and warning light” was designed to tackle the traffic issues in the country so as to establish automatic traffic control and monitoring system with near perfection. The project intelligent traffic light with automatic street light and... Continue Reading
    DEDICATION We dedicate this project work to Almighty God, the source of all knowledge, wisdom and understanding, for being there for us throughout the period of our study and to our lovely parents, Mr. and Mrs. Abido, and Sir & Lady Christopher Korugbo for their parental care, who has always been our inspiration. ACKNOWLEDGEMENTS Thanks to God... Continue Reading
    ABSTRACT The project “microcontroller based intelligent traffic light system with automatic street light and warning light” was designed to tackle the traffic issues in the country so as to establish automatic traffic control and monitoring system with near perfection. The project intelligent traffic light with automatic street light and... Continue Reading
    ABSTRACT The project “microcontroller based intelligent traffic light system with automatic street light and warning light” was designed to tackle the traffic issues in the country so as to establish automatic traffic control and monitoring system with near perfection.  The project intelligent traffic light with automatic street light and... Continue Reading
    ABSTRACT The project work is on the design and construction of automatic two lane traffic light control. This system is based on digital electronics.  It employs an astable multivibrator which is the clock generator that sends the clock into a time sequencing generator using a decade counter with ten (10) decodes output that has it’s... Continue Reading
    ABSTRACT The project work is on the design and construction of automatic two lane traffic light control. This system is based on digital electronics. It employs an astable multivibrator which is the clock generator that sends the clock into a time sequencing generator using a decade counter with ten (10) decodes output that has it’s binary... Continue Reading
    ABSTRACT:  A traffic light system is an electronic circuitry designed and configured to control the flow of the traffic (vehicular and human) at roads intersection without the physical presence of a traffic warden. This is made possible through the help of a signaling device which is mounted at roads intersection. It is achieved using... Continue Reading
    ABSTRACT This work has been aimed at efficient means of controlling the traffic effectively for twenty-four hours. As the world is growing technologically more and more vehicles jump into the public road adding to the already existing number. Consequently, more efficient way of controlling the traffics becomes more desirable as compared to the... Continue Reading
    ABSTRACT This work has been aimed at efficient means of controlling the traffic effectively for twenty-four hours. As the world is growing technologically more and more vehicles jump into the public road adding to the already existing number. Consequently, more efficient way of controlling the traffics becomes more desirable as compared to the... Continue Reading
    Call Us
    whatsappWhatsApp Us