COMMUTATION FAILURES IN HVDC SCHEMES

  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0245
  • Access Fee: ₦5,000 ($14)
  • Pages: 25 Pages
  • Format: Microsoft Word
  • Views: 1.7K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Commutation failures are very frequent dynamic events in high voltage dc (HVDC) transmission systems. Commutation failure is mostly observed at the inverter side of HVDC links, where large firing angles are used. The minimum value of the extinction angle required for the proper operation of a valve is specified by the valve manufacturer; however, at the inverter side of HVDC systems the extinction angle is regulated to a value higher than the valve specifications to allow control adjustments and also leave an adequate safety margin for unforeseen events in the power system, such as faults. Severe faults such as the voltage drops, phase shifts, or sudden increase in dc current may cause the commutation process to fail. A failure of one inverter station may affect the operation of other adjacent inverter stations, even the power transmission of HVDC links might be consequently blocked, and thus the stable operation of whole AC/DC transmission system might be affected.  Failure to complete commutation before the commutating voltage reverses is referred as commutation failures. Commutation failures occur in HVDC systems due to ac voltage dips (possibly caused by an ac systems short-circuit), increased direct current, late ignition or a combination of these. During the period of commutation failures, usually the fault duration, the associated valve groups cannot deliver any power into the AC network. The energy loss to the AC system during the fault is unavoidable. After fault clearing, the DC would normally be required to recover as quickly as possible to minimize the energy loss and prevent transient instability of the AC system

 Table of contents

 

1.              INTRODUCTION.. 3

2.               BACKGROUND……………………………………………………………………………………………………………….  4.

2.1            Working Principles of an HVDC converter……………………………………………………………………..…4.

3.              COMMUTATION FAILURES. 7

3.1             Causes of commutation failures 9

3.1.1         Voltage magnitude reduction on the A.C side. 9

3.1.2          Increase in D.C current. 10

3.1.3          Phase angle shift. 10

3.1.4          The effect of earth faults in A.C systems on voltage across valves. 11

3.1.5          Commutation failures mitigation. 13

3.1.6          Commutation failure recovery. 14

4.                TYPES OF FAULTS ON A.C NETWORK. 15

4.1              Single phase-to-ground fault. 15

5.              Conclusions. 20

                       Reference………………………………………………………………………………………………………………………20

                      Appendix A........................................................................................................................21

                    

                      List of Figures

                      Figure 1 Equivalent circuit for a three phase full wave bridge converter………………………..4

                      Figure 2: Basic equivalent circuit during commutation…………………….. .............................4

                      Figure 3: Commutation process between valve 1 & valve 3 …………………………...................5

                      Figure 4: Voltage and current during commutation……….................................................. 6

                      Figure 5: Variation of the overlap angle µ as a function of delay angle α………………........ ..7

                      Figure 6: Commutation failure in a six pulse bridge……………………………………………………......8

                      Figure 7: Waveforms for V1 with the converter in the inverter operation…………………......8

                      Figure 8: Voltage magnitude reduction……………………………………………………………................9

                      Figure 9: Increase in d.c current…………………………………………………………………………………..….10

                      Figure10:Waveforms during a single commutation failure…………………………………………..….11

                      Figure11: Line to ground voltages in the a.c system at a single line to ground fault in R….12

                      Figure12:Phase to phase voltage on valve side of a YY converter transformer……………….12

                      Figure13: Phase to phase voltage on valve side of a Y∆ converter transformer………………13

                      Figure14: VDCOL characteristics……………………………………………………………………………………...16

                      Figure15: Single phase to ground phase to ground fault at inverter………………………....…...18

                      Figure16: Inverter valves value current during the fault………………………………………………....18

                      Figure17: Voltage waveform at R phase during line-line fault…………………………………….……19

                      Figure18: Voltage waveform at Y phase during lin-line fault…………………………………….………19

COMMUTATION FAILURES IN HVDC SCHEMES
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0245
  • Access Fee: ₦5,000 ($14)
  • Pages: 25 Pages
  • Format: Microsoft Word
  • Views: 1.7K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Electrical Engineering
    Project ID ELE0245
    Fee ₦5,000 ($14)
    No of Pages 25 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT  The technical industrial training report is well written for the study of automobile and their engines for the students of tertiary institutions.  The sequence in which the topics were presented in this article is quite commendable. The materials are well presented in a way that is easily comprehendible by the reader.  The operative... Continue Reading
    ABSTRACT           No man is an island; collectively we have been able to make a thorough research on how effective pension scheme in both the civil and public sectors of the Nigerian economy has been beneficial or just a mirage to the Nigerian workers; thus a case study of Enugu state.           In the first case, the purpose... Continue Reading
    ABSTRACT The technical industrial training report is well written for the study of automobile and their engines for the students of tertiary institutions. The sequence in which the topics were presented in this article is quite commendable. The materials are well presented in a way that is easily comprehendible by the reader. The operative words... Continue Reading
    ABSTRACT The technical industrial training report is well written for the study of automobile and their engines for the students of tertiary institutions. The sequence in which the topics were presented in this article is quite commendable. The materials are well presented in a way that is easily comprehendible by the reader. The operative words... Continue Reading
    (A CASE STUDY OF ENUGU STATE) ABSTRACT No man is an island; collectively we have been able to make a thorough research on how effective pension scheme in both the civil and public sectors of the Nigerian economy has been beneficial or just a mirage to the Nigerian workers; thus a case study of... Continue Reading
    1.1 BACKGROUND OF THE STUDY Banking enterprises is established with the assumption that the objectives of every management is to maximize profit. The importance of these organization cannot be over emphasized as they are the bed rock of other sector of the economy. A very good example of the sector is the financial institution known as the banking... Continue Reading
    1.1BACKGROUND OF THE STUDY Banking enterprises is established with the assumption that the objectives of every management is to maximize profit. The importance of these organization cannot be over emphasized as they are the bed rock of other sector of the economy. A very good example of the sector is the financial institution known as the banking... Continue Reading
    ABSTRACT Small scale enterprises are expected to play a vital role towards the development of the economy due to closeness to the grassroots. But unfortunately they are unable to do this due to lack of fund. As a result of this, government came up with incentive schemes to assist them develop their business and the economy in general. Therefore... Continue Reading
    ABSTRACT  Small scale enterprises are expected to play a vital role towards the development of the economy due to closeness to the grassroots.  But unfortunately they are unable to do this due to lack of fund.  As a result of this, government came up with incentive schemes to assist them develop their business and the economy in general.... Continue Reading
    INTRODUCTION BACKGROUND OF THE STUDY      The administration of staff incentive scheme has now become a popular phenomenon of the total personnel policy of nay organization. The scheme involves those extra benefits which may not necessarily be money, which emanate from the kind relationship of the employer to the employees, to supplement their... Continue Reading
    Call Us
    whatsappWhatsApp Us