A FAULT DETECTION AND PROTECTION SCHEME FOR A 200 MVA TRANSFORMER USING FUZZY LOGIC

  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0531
  • Access Fee: ₦5,000 ($14)
  • Pages: 82 Pages
  • Format: Microsoft Word
  • Views: 389
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

Condition monitoring of Electrical power equipment has attracted considerable attention for years. The aim of this work is to use Fuzzy logic (FL) Tool Box in building a simulation system that will diagnose all kinds of incipient faults, phase to phase fault and overloading in a transformer and monitor its conditions. Current and rate of change of current with time have been identified as the input variables, duly represented in the programme as “Error” and “Error-Dot”. These variables have their universe of discourse from -1.5 to 1.5 and from -10 to 10 respectively. Fuzzy logic sensor is designed to monitor the current(i) conditions of the transformer at both ambient and full load. The results from the research show that whenever the output response is zero the current in transformer is normal. This is obtained when input values of [0] and [0] are injected into the system to produce a response of “6e-017” which is approximately zero. Whereas if the output response is greater than zero it implies that the transformer current is rising beyond normal and protection scheme should be alerted. This condition is achieved when input values of [-1.5] and [5] are used on the system to give a response of “+5”. However, if the response is less than zero then the transformer current is below normal, hence the protection scheme should be alerted. To investigate this, input values of [1.5] and [-5] give a response of “-5”. Fuzzy logic is used as an expert system that assesses all information keyed in at the front panel to analyze and predict the condition of the transformer at any time.

TABLE OF CONTENTS

Approval Page ----------------------------------------------------------------------------------------------- i

Dedication----------------------------------------------------------------------------------------------------- ii

Acknowledgement ------------------------------------------------------------------------------------------- iii

Abstract ------------------------------------------------------------------------------------------------------- iv

Table of Contents -------------------------------------------------------------------------------------------- v

List of Tables ------------------------------------------------------------------------------------------------ vii

List of Figures ----------------------------------------------------------------------------------------------- viii

List of Symbols ---------------------------------------------------------------------------------------------- ix

CHAPTER ONE: INTRODUCTION

1.1 Background of the Study------------------------------------------------------------------------------- 3

1.2 Statement of the Problem ------------------------------------------------------------------------------ 4

1.3 Objective of the Study --------------------------------------------------------------------------------- 4

1.4 Significance of the Study ------------------------------------------------------------------------------ 4

1.5 Scope of the Study ------------------------------------------------------------------------------------- 5

CHAPTER TWO: LITERATURE REVIEW

2.1.0 The Transformer -------------------------------------------------------------------------------------- 6

2.1.1 Information on name plate of the three phase Double wound transformer ------------------------------- 8

2.1.2 Transformer losses ------------------------------------------------------------------------------------ 9

2.1.3 Test on Transformer----------------------------------------------------------------------------------- 12

2.1.4 Faults in Transformer -------------------------------------------------------------------------------- 14

2.1.5 Constructional features to reduce faults and increase Efficiency --------------------------------- 16

2.1.6 Conventional fault detection and protection scheme ---------------------------------------------- 18

2.2.0 Fuzzy Logic -------------------------------------------------------------------------------------------- 24

2.2.1 Fuzzy sets----------------------------------------------------------------------------------------------- 29

2.2.2 Membership function --------------------------------------------------------------------------------- 30

2.2.3 Rule base ----------------------------------------------------------------------------------------------- 31

2.2.4 Inference------------------------------------------------------------------------------------------------ 32

2.2.5 De-fuzzification --------------------------------------------------------------------------------------- 32

CHAPTER THREE: METHODOLOGY

3.1 Identification of input and output variables----------------------------------------------------------- 38

3.2 Construction of control rules --------------------------------------------------------------------------- 39

3.3 Rules ------------------------------------------------------------------------------------------------------ 39

3.4 Membership functions ---------------------------------------------------------------------------------- 41

3.5 Fuzzification --------------------------------------------------------------------------------------------- 44

3.6 Selection of compositional Rule of Inference -------------------------------------------------------- 46

CHAPTER FOUR: SIMULATION AND RESULTS

4.1 Simulation software used ------------------------------------------------------------------------------ 49

4.2 Fuzzification---------------------------------------------------------------------------------------------- 50

4.3 Rule number determination----------------------------------------------------------------------------- 51

4.4 Rules ------------------------------------------------------------------------------------------------------ 54

4.5 Inference Engine ----------------------------------------------------------------------------------------- 54

4.6 Rule firing ------------------------------------------------------------------------------------------------ 54

4.7 Defuzzification------------------------------------------------------------------------------------------- 55

4.8 Result analysis ------------------------------------------------------------------------------------------- 61

CHAPTER FIVE: CONCLUSION

5.1 Summary-------------------------------------------------------------------------------------------------- 63

5.2 Conclusion------------------------------------------------------------------------------------------------ 64

5.3 Contribution to knowledge ----------------------------------------------------------------------------- 65

REFERENCES --------------------------------------------------------------------------------------------- 66

Appendix A: Input I (Error)--------------------------------------------------------------------------------- 68

Appendix B: Input II (Del-error) --------------------------------------------------------------------------- 69

Appendix C: Output I---------------------------------------------------------------------------------------- 70

Appendix D: Rules Structure ------------------------------------------------------------------------------- 71

A FAULT DETECTION AND PROTECTION SCHEME FOR A 200 MVA TRANSFORMER USING FUZZY LOGIC
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0531
  • Access Fee: ₦5,000 ($14)
  • Pages: 82 Pages
  • Format: Microsoft Word
  • Views: 389
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Electrical Engineering
    Project ID ELE0531
    Fee ₦5,000 ($14)
    No of Pages 82 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT The problem of Electricity are enormous and can never be treated completely until the fault department (maintenance) are improved upon for urgent and rapid response to line faults. The present protection scheme only isolates the lines in the event of faults, define the fault, but leaves no proper information about the location of the... Continue Reading
      CHAPTER ONE INTRODUCTION 1.0       BACKGROUND TO THE STUDY The increasing demand for education in Nigeria especially tertiary education has been an issue in recent times. Government–owned tertiary institutions as well as those privately owned do not possess the capacity and manpower... Continue Reading
    ABSTRACT In our present society, wireless communication has become most prevalent and mobile units (hand held devices /GSM/ Computers) are one of the most common equipments for conveying messages wirelessly. Owing to the fact that most youths in our society today on the average make use of at least one wireless device that communicate with other... Continue Reading
    ABSTRACT In our present society, wireless communication has become most prevalent and mobile units (hand held devices /GSM/ Computers) are one of the most common equipments for conveying messages wirelessly. Owing to the fact that most youths in our society today on the average make use of at least one wireless device that communicate with other... Continue Reading
    ABSTRACT` To improve the overall efficiency of the power system, the performance of transmission system must be improved. Some of the vital ways of achieving this objective is by reducing power losses in the system and also improving voltage profile. An important method of controlling bus voltage is by shunt capacitor banks in the transmission... Continue Reading
    ABSTRACT A power  transformer is a very  simple device. It  is a vital  link in the  electronic  distribution  system. A power transformer is associated with faults.  The design and construction of the phase fault detector is to provide simple, reliable and comprehensive electrical phase fault detections and response system. The system ... Continue Reading
    ABSTRACT This work presents an intelligent system for fault diagnosis for automobiles. The main goal of this work is to use the vast knowledge previously acquired from human experts by system experts, to visualize, localize and fix a fault in a car. The project is motivated by the need to guide car owners and motor mechanics in the maintenance and... Continue Reading
    ABSTRACT This project deals with the design and implementation of an expert system for car faults diagnosis. The project is motivated by the need to guide car owners and learners motor mechanics in the maintenance and trouble shooting of motor problems without having to resort to presumptions and conjectures. Particularly, it is expected that the... Continue Reading
    Call Us
    whatsappWhatsApp Us