ABSTRACT

This is a technical report presented on the design and construction of an Automatic Three Phase Selector.

        In the construction work, an ordinary level knowledge of electronics principles are observed. We aimed at presenting a practical aspect of the subject and then providing the argument necessary for a thorough understanding. The reliability of the specimen was estimated after construction and testing to ensure steady state stability. The work is organized into five chapters.

        Chapter one introduced the subject matter. Chapter two explores the literature review of the related works. Chapter three contains a detailed account of the design work while chapter four closely attempted an analysis of the design work. Chapter five draws the curtain by concluding the work.

TABLE OF CONTENT

CHAPTER ONE

1.0        Introduction

1.1        Aims/Objectives of the project

1.2         Significance of the study

1.3        Methodology

CHAPTER TWO

2.1 A review of Automatic Phase Selector

2.2 Power Supply Unit

2.3 The Transformer

2.4 The Rectifier

2.5 The Filter

2.6 The Voltage Regulator

2.7 Power Circuit

2.8 The Relays

CHAPTER THREE

3.0 The Design Proper

3.1 The Power Supply

3.2 The Step down Block

3.3 The Rectifier Block

3.4 The smoothening Block

3.5 The Regulator

3.6 The Current Sink

CHAPTER FOUR

4.0 Design Analysis

4.1        The Rectifier Circuit

4.2        The Filter Circuit

4.3        Design Calculation

4.4        The DC Voltage Regulator

4.5        The Voltage Programmable Voltage Sink

CHAPTER FIVE

5.0 Discussion of Result

5.1    Conclusion

5.2    Recommendation

References

CHAPTER ONE

INTRODUCTION

As the growing population of human race widens the gulf between energy supply and energy demand, the imbalance in energy availability sent researchers into excavating for a way of settling this age long squabble. A lasting solution is vested on alternative use of the renewable energy source, a project that is yet to be widely applied. Hence, the continuation of the unsettled yearn for sufficient power. Consequently, the power lines are frequently over loaded resulting to a trip of power by the action of switch gears or by the load shading process undertaken by the distribution authorities.

        Since it is crystal clear that some institutions such as health related institutions and some other delicate systems should not be allowed to suffer equally with their counterparts, Automatic Phase Selector is used to sustain energy consumption in the time of phase trip. The design of this circuit involves the use of automatic switches but the details of design varies from place to place, time to time and also depends on the type of load involved.

        This project involves the use of transistor driven relays to affect the change of phase whenever the voltage condition becomes intolerable in the previous phase connected.  

1.1          AIMS/OBJECTIVES OF THE PROJECT

The analysis of this project cannot go without enumerating the goals meant to be achieved in the pursuit of the work. These objectives include:-

i.        To develop a simple low cost device aimed at easing the prevalent burden faced by delicate offices, parastatals and institutions who need very low but constant power supply. Since supply is always on along the distribution lines that supply such sites, what pesters on the progress of work thereof is always the unwarranted trip of phases due to power usage from neighbouring consumers. The automatic phase selector therefore, erase this setback form the face of progress of work in such offices.

ii.      To stimulate the interest of upcoming students to take up research not only in their field of study “Electrical/Electronics Engineering” but also to extend their arms to other disciplines, thus enhancing the versatility of Electrical/Electronics Engineering.

iii.    To create awareness that will stimulate the interest of fellow students who intend to take up research topic on automatic switch of any type.

    Emphatically, the purpose of this project is to build an automatic switch system which is capable of selecting a phase with best operating voltage for delicate offices.

1.2         SIGNIFICANCE OF STUDY

The significance of this project work cannot be overemphasized. This is because the number of lives that has being lost to the hand of interruption of power in health institutions and the like is not negligible. Delicate appliances have become the main victim of this artificial circumstance. The applicability of the outcome of this research work in several facets of human endeavour makes this work of real importance to humanity.

        The use of the device produced from this research work would help to reduce human labour and hazard, going by the fact that many have been handicapped by electric shock because of the attempt they made to select another phase, and that the handicapped are helpless and cannot change phases.

1.3          METHODOLOGY

The designing of this circuit was accomplished by a constant and detailed study of the c constituent components. This involved the study of their  characteristics in isolation, and when connected together with some other components. A rough design was always made with some theoretical backup. Those designs were implemented and tested using project boards.

        The internet was visited for circuit ideas where problems were encountered and the necessary adjustments made on paper and then effected on the projects board.

        Each block that works was transferred to the Vero board where it was finally soldered in position. Library materials were consulted as well.

DESIGN AND CONSTRUCTION OF AN AUTOMATIC THREE PHASE SELECTOR
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0129
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 65 Pages
  • Format: Microsoft Word
  • Views: 1.5K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Electrical Engineering
    Project ID ELE0129
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 65 Pages
    Format Microsoft Word

    Related Works

    The scope of the project covers aspects like the features of automatic three phase selector, its applications, and its operations. Its advantages and its components. Finally, it covers the importance on the need of automatic three phase selector and contributions toward a greater sharing load balance and a better three phase power distribution and... Continue Reading
    ABSTRACT This is a technical report presented on the design and construction of an Automatic Three Phase Selector. In the construction work, an ordinary level knowledge of electronics principles are observed. We aimed at presenting a practical aspect of the subject and then providing... Continue Reading
    ABSTRACT This is a technical report presented on the design and construction of an Automatic Phase Selector.           In the construction work, an ordinary level knowledge of electronics principles are observed. We aimed at presenting a practical aspect of the subject and then providing the argument necessary for a thorough... Continue Reading
    ABSTRACT This is a technical report presented on the design and construction of an Automatic Three Phase Selector. In the construction work, an ordinary level knowledge of electronics principles are observed. We aimed at presenting a practical aspect of the subject and then providing... Continue Reading
    CHAPTER ONE INTRODUCTION As the growing population of human race widens the gulf between energy supply and energy demand, the imbalance in energy availability sent researchers into excavating for a way of settling this age long squabble. A lasting solution is vested on alternative use of the renewable energy source, a project that is yet to be... Continue Reading
    Abstract As the growing population of human race widens the gulf between energy supply and energy demand, the imbalance in energy availability sent researchers into excavating for a way of settling this age long squabble. A lasting solution is vested on alternative use of the renewable energy source, a project that is yet to be widely applied.... Continue Reading
    Abstract As the growing population of human race widens the gulf between energy supply and energy demand, the imbalance in energy availability sent researchers into excavating for a way of settling this age long squabble. A lasting solution is vested on alternative use of the renewable energy source, a project that is yet to be widely applied.... Continue Reading
    ABSTRACT The project is designed to automatically supply continuous power to a load through one of the three sources of supply that are: solar, mains and generator or to combine the sources to supply the load all together at the same time. The three socket outlets represent the three sources. The sockets outlets are connected to three step down... Continue Reading
    ABSTRACT The design and construction of a 60A, 3-Ф automatic power changeover from public utility supply to generator and vice versa was aimed at providing a useful system for use in our homes or offices. The system was achieved with a 66A 3-Ф contactor, 100mA transformers and relays. The system turns on a generator when the public utility... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    Call Us
    whatsappWhatsApp Us