ABSTRACT

The word land means different things to different people and in different context. These different meanings notwithstanding, land, since prehistoric time, has been of elemental significance to the affairs of man.

In this thesis the various interests compulsory acquired were looked into. The compensation paid for these interests were adequately examined to determine the adequacy of the compensation. In the payment of compensation, time factor was also considered  

This study examined the evolution and formation of acquisition laws in Nigeria with a detailed examination of the Land Use Act of 1978 as its objective. Another objection of this study is to see whether the acquisition and compensation of Akure Airport actually conformed with the provision of the law. The necessary data required for this study were collected through interview and administration of questionnaires.

Finally, it was discovered that serving acquisition notice through a specified and generalized means is adequately efficient and cost effective as against the provision of the Land Use Act. There was delay in payment of compensation. Also, no interest was paid for the delay in payment of compensation as provided for by the law.

TABLE OF CONTENTS
Title Page…………………………………………………………………………….i
Certification……………………………………………………………………….....ii
Dedication …………………………………………………….…………………….iii
Acknowledgement…………………………………………...………..………..........iv
Abstract………………………….……………………………………….….....….. ..v
Table of Contents……………...……………………………………………………..vi
List of Tables…………………..……………………………………………….........x
List of Figures……………………………………………………………………..…xi
CHAPTER ONE: INTRODUCTION
1.1 Background to the Study ..........................................................................................1
1.2 Statement of the Problem .........................................................................................3
1.3 Aim and Objectives ..................................................................................................5
1.4 Significance of the Study…………………………………………………………..5
1.5 Scope of the Study………………………………………………………...………..5
1.6 Limitations of the Study……………………………………………………………6
CHAPTER TWO: LITERATURE REVIEW AND THEORETICAL FRAMEWORK
2.1 Concept of Compulsory Acquisition………………….…....................................7
2.2 History of Compulsory Acquisition in Nigeria……………….............................10
2.3 Compulsory Acquisition Process and Procedure………………...........................16
2.4 Concept of compensation………………………………….................................17
2.5 Examples of Interest to Compensate…………………………………...………..20
2.6 The Land Use Act………………….…...............................................................21
2.7 Compensation under the Land Use Act……………………………….................25
2.8 Consequences of Compulsory Acquisition………..............................................26
2.9 Reasons for Low Compensation.........................................................................27
CHAPTER THREE: RESEARCH METHODOLOGY AND STUDY AREA
3.1 Introduction .......................................................................................................30
3.2Research Methodology........................................................................………….30
3.3 Data Collection Instrument ................................................................................30
3.5 Sample Frame and Size .....................................................................................30
3.6 History and description of the Study Area.........................................................31
3.7 Ownership and pattern of Land Use in the area…………………………………33
3.8 The Airport site………………………………………………………………….34
3.9 Method of Data Analysis………………………………………………………..34

CHAPTER FOUR: DATA PRESENTATION AND ANALYSIS
4.1 Introduction ............................................................................................................35
4.2 Distribution of Questionnaires ..............................................................................35
4.3.1 Respondents Gender ..............................................................................................35
4.3.2 Respondents’ Maturity Level….. .........................................................................36
4.3.3 Respondents’ Level of Education…....................................................................37
4.3.4 Respondents Job Type.…………………………..……….................................37
4.4.1 Response of Respondents on serving of acquisition notice….…...….………...38
4.4.2 Response of Respondents on method of serving of acquisition notice...………39
4.4.3 Response of Respondents on acquisition for public purpose …………….……39
4.4.4 Response of Respondents on items assessed during compensation……………40
4.4.5 Response of Respondents time taken to be compensated……………….…..…40
4.4.6 Response of Respondents on availability of development on land before acquisition……………………………………………………………………………..41
4.4.7 Response of Respondents on Opinion of the law of compulsory acquisition and compensation…………………………………………………………………………42
4.4.8 Response of Respondents on financial state after compensation ……….….…42
4.4.3 Response of Respondents on level of satisfaction on compensation paid …….43
4.4.4 Response of Respondents on interest payment for delayed compensation…….44
CHAPTER FIVE: SUMMARY, CONCLUSION AND RECOMMENDATION
5.1 Summary …………............................................................................................45
5.2 Conclusion ..........................................................................................................45
5.3 Recommendation ................................................................................................45
REFERENCES………………………………………………………………………..47
APPENDIX 1………………………………………………………………………….48
APPENDIX II…………………………………………………………………………52







LIST OF TABLES
Table 4.1: Distribution of questionnaires…………………………..............................35
Table 4.2: Percentage of Respondents by sex.................................................................36
Table 4.3: Level of Maturity of Respondents..............................................................36
Table 4.4: Serving of Acquisition notice before acquisition.........................................38
Table 4.5 Acquisition for public purpose……………………………………………...39
Table 4.6: Items assessed during compensation…………...........................................40
Table 4.7: Presence of existing development on Land during acquisition…………….41
Table 4.8: Respondents’ Opinion on the Compulsory Acquisition and compensation law………………………………………………………………………………………..42
Table 4.9: Level of satisfaction on compensation paid………………………………..43
Table 4.10: Payment of interest on Delayed Compensation………………………….44





LIST OF FIGURES
Fig. 4.1Level of Education of Respondents.... ………………………………...29
Fig. 4.2 Type of Job of Respondents..................................................................38
Fig.4.3: Method of serving of acquisition notice................................................39
Fig. 4.4: Length of time taken for compensation payment..................................41
Fig. 4.5 Respondents Opinion on adequate compensation………………………..43

PROBLEMS OF COMPULSORY ACQUISITION AND COMPENSATION IN THE LAND USE ACT 1978
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Estate Management
  • Project ID: ETM0258
  • Access Fee: ₦5,000 ($14)
  • Pages: 53 Pages
  • Format: Microsoft Word
  • Views: 526
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Estate Management
    Project ID ETM0258
    Fee ₦5,000 ($14)
    No of Pages 53 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT The word land means different things to different people and in different context. These different meanings notwithstanding, land, since prehistoric time, has been of elemental significance to the affairs of man. In this thesis the various interests compulsory acquired were looked into. The compensation paid for these interests were... Continue Reading
    PROBLEM OF COMPULSORY ACQUISITION AND COMPENSATION UNDER THE LAND USE ACT OF 1978 (A CASE STUDY OF AKURE AIRPORT) ABSTRACT The word land means different things to different people and in different context. These different meanings notwithstanding, land, since prehistoric time, has been of elemental significance to the affairs of man. In this... Continue Reading
    ABSTRACT The word land means different things to different people and in different context. These different meanings notwithstanding, land, since prehistoric time, has been of elemental significance to the affairs of man. In this thesis the various interests compulsory acquired were looked into. The compensation paid for these interests were... Continue Reading
    ABSTRACT The word land means different things to different people and in different context. These different meanings notwithstanding, land, since prehistoric time, has been of elemental significance to the affairs of man. In this thesis the various interests compulsory acquired were looked into. The compensation paid for these interests were... Continue Reading
    ABSTRACT The word land means different things to different people and in different context. These different meanings notwithstanding, land, since prehistoric time, has been of elemental significance to the affairs of man. In this thesis the various interests compulsory acquired were looked into. The compensation paid for these interests were... Continue Reading
    ABSTRACT mso-fareast-font-family:Calibri;mso-fareast-theme-font:minor-latin;mso-ansi-language: EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA'>Compulsory acquisition of private property is inevitable in any society and government usually exercise its power of eminent domain in this regard, this project assessed whether payment of... Continue Reading
    ABSTRACT TABLE OF CONTENTS Title page ii Certification iii Dedication iv Acknowledgement v Abstract vi Table of content vii List of table xi List of figures xii List of appendixes xiii CHAPTER ONE 1.0 Introduction 1 1.1 Background of the study 2 1.2 statement of the problem 3 1.3 Aim and objectives 3 1.4 Limitation of study 4 1.5 Scope of study 4... Continue Reading
    INTRODUCTION 1.1 BACKGROUND AND NEED FOR THE STUDY Although the various governments in the federation could acquire land at any time by working their power of eminent domain they still (most in the south) face the problem of rigidity associated with native laws and customs. In an attempt to breakdown these rigidity the various land laws were... Continue Reading
    INTRODUCTION 1.1BACKGROUND AND NEED FOR THE STUDY Although the various governments in the federation could acquire land at any time by working their power of eminent domain they still (most in the south) face the problem of rigidity associated with native laws and customs. In an attempt to breakdown these rigidity the various land laws were... Continue Reading
    ABSTRACT The current method of compensation adopted by government has been criticized by many scholars and claimants. Scholars held a view that the compensation paid to the claimants is much inadequate. The claimants on the other hand do sometimes claim that the compensation paid to them does not restore them back to the state they were before the... Continue Reading