THE PROJECT AIMS AT CREATING A NAIL FACTORY IN EIYENKORIN ILORIN ALONG – IBADAN EXPRESS WAY


For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

TABLE OF CONTENT

Title page                                                                                                                                i

Table of contents                                                                                                                    ii

CHAPTER ONE:

1.0       Project Description                                                                                                     1

1.1       Facilities and beginning inventure                                                                             1

1.2       Staffing Structure                                                                                                       1

CHAPTER TWO:

2.0       Production Process                                                                                                     2

CHAPTER THREE:

3.0       Marketing Plan                                                                                                           3

CHAPTER FOUR:

4.0       Financial Plan                                                                                                             4

4.1       Equipment of Nail factory                                                                                          4         

4.2       Major Assumptions                                                                                                    5

4.3       Projected Income Statement                                                                                       9

4.4       Projected Balanced Sheet                                                                                           10

4.5       Ratio Analysis                                                                                                            11

4.6       Break-Even Analysis                                                                                                  12

4.7       Sensitively Analysis                                                                                                   1 2

CHAPTER FIVE:

5.0       Recommendations and key success factors                                                               13

CHAPTER SIX:

6.0       Economic Impact Evaluation                                                                       14

CHAPTER ONE

1.0     INTRODUCTION

          Over the past years, many new moulding and core-making processes have been introduced in the foundry industries, and in particular ones based on the use of chemical binders. Greensand moulding, however, remains the single most important method for producing casting. Especially when they are required in large numbers involves the use of mechanized moulding plant.

In order to obtain the optimum economic production with green sand plant, it is imperative that foundry managerial and supervisory staffs are familiar with the best method for control and operation.

According to Bcira, (1985), for a quality production of foundry product to be ascertained, all expects of green sand moulding technology from basic raw material, their properties and control, to the many principles involved in the production of green sand moulds must be adequately understood.

          The success of any green sand system depends to a large extent on the continual re-use of the mould sand and the essential factor to maintain its properties, and a section on this important aspect is included, together with information on the normal and special tests which may be necessary. The need for sand cooling and the means for carrying it out should be adequately reviewed, as the methods for mould handling on mechanized plants, the requirements for sand storage and for the handling and removal of sand cast mould prior to re-circulation.

THE PROJECT AIMS AT CREATING A NAIL FACTORY IN EIYENKORIN ILORIN ALONG – IBADAN EXPRESS WAY
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Materials And Metallurgical Engineering
    Project ID MME0005
    Fee ₦5,000 ($14)
    No of Pages 13 Pages
    Format Microsoft Word

    Related Works

    TABLE OF CONTENT Title page                                                                                                                                i Table of contents... Continue Reading
    ABSTRACT    The need for the Nigerian construction industry to move away from the traditional forms of project procurement and embrace project management services cannot be over emphasized.  This is as a result of the importance of capital projects to the development of a young nation.  This study investigated the impact of project management... Continue Reading
    ABSTRACT The design and fabrication of a reciprocating nail gasket is a new innovation in technology. The one in existence is manually operated. In which a punch that is adjacent to a die is mounted to the handle which is attached to the shaft. A helical spring that is incorporated to the... Continue Reading
    ABSTRACT The design and fabrication of a reciprocating nail gasket is a new innovation in technology. The one in existence is manually operated. In which a punch that is adjacent to a die is mounted to the handle  which  is attached to the shaft. A helical spring that is incorporated to the shaft of the punch, helps the handle return to its... Continue Reading
    A STATISTICAL APPRAISAL ACCIDENT RATE IN ENUGU – ONITSHA EXPRESS ROAD FROM 1995 – 2002 ABSTRACT The aim of this project is to analyze the appraisal of road traffic accident rate on Enugu – Onitsha Express Road.           The data on the number of recorded road traffic accident rate on Enugu – Onitsha Express road from 1995 –... Continue Reading
    A STATISTICAL APPRIASAL ACCIDENT RATE IN ENUGU – ONITSHA EXPRESS ROAD FROM 1995 – 2002 ABSTRACT The aim of this project is to analyze the appraisal of road traffic accident rate on Enugu – Onitsha Express Road. The data on the number of recorded road traffic accident rate on Enugu – Onitsha Express road from 1995 – 2002 was collected and... Continue Reading
    A STATISTICAL APPRIASAL ACCIDENT RATE IN ENUGU – ONITSHA EXPRESS ROAD FROM 1995 – 2002 ABSTRACT The aim of this project is to analyze the appraisal of road traffic accident rate on Enugu – Onitsha Express Road. The data on the number of recorded road traffic accident rate on Enugu – Onitsha Express road from 1995 – 2002 was collected and... Continue Reading
    TABLE OF CONTENTS DECLARATION .......................................................................................................................... i APPROVAL ................................................................................................................................ ii DEDICATION... Continue Reading
    CHAPTER ONE  INTRODUCTION 1.1 BACKGROUND TO THE STUDY Paint Factory or plant is an industrial site, usually consisting of buildings and machinery, or more commonly a complex having several buildings, where workers process raw materials into paint. Factories arose with the introduction of machinery during the industrial revolution when the... Continue Reading
    STAFF INDUCTION AND TRAINING PROGRAMME FOR IMPROVING WORKERS’ EFFICIENCY (A CASE STUDY OF MILO EXPRESS COMPANY, LAGOS) ABSTRACT Staff induction and training programmes have become indispensable tools in sharpening the skills, knowledge and attitude of employees to make them contribute effectively towards the attainment of organizational goals.... Continue Reading
    Call Us
    whatsappWhatsApp Us