ROYALTON HOTELS FRONT OFFICE INFORMATION

  • Type: Project
  • Department: Mathematics
  • Project ID: MTH0148
  • Access Fee: ₦5,000 ($14)
  • Pages: 115 Pages
  • Format: Microsoft Word
  • Views: 464
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

A sa:cly of Royr.!1on l1Dh::s f;-0;1. o,Tice was ca:-ried out; to uriderstand the system and determinethe information rcqui:·emcnL Duri;1g the course or this study, problcn�s ai1cct ing the systems were identified. We then designed a new system which is computer based rulting into consideration the problems identified. This new sysl.crn will replace the olcl one. Conversion plan has been mapped out and users manual included.

ROYALTON HOTELS FRONT OFFICE INFORMATION
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Mathematics
  • Project ID: MTH0148
  • Access Fee: ₦5,000 ($14)
  • Pages: 115 Pages
  • Format: Microsoft Word
  • Views: 464
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Mathematics
    Project ID MTH0148
    Fee ₦5,000 ($14)
    No of Pages 115 Pages
    Format Microsoft Word

    Related Works

    Abstract A study of Royr.!1on l1Dh::s f;-0;1. o,Tice was ca:-ried out; to uriderstand the system and determine the information rcqui:·emcnL Duri;1g the course or this study, problcn􀁃s ai1cct ing the systems were identified. We then designed a new system which is computer based rulting into consideration the problems identified. This new... Continue Reading
    ABSTRACT  This study set out to establish the effect the recruitment and selection practices in Sheraton Hotel and how they affect performance of Pont Desk Officers. The study was carried out along a number of objectives, which included; to identify the methods used in the recruitment and selection processes, to evaluate the role of effective... Continue Reading
    ABSTRACT t his project “Hotel front Office Management System” tends to deal with the system of all the information needs of the different sections of a hotel. The hotel presidential ltd (which is a large and fast growing hotel) has because of its size and location, made its mark in the tourism industry in the city. Most times, the hotel runs... Continue Reading
    ABSTRACT This project “Hotel front Office Management System” tends to deal with the system of all the information needs of the different sections of a hotel. The hotel presidential ltd (which is a large and fast growing... Continue Reading
    ABSTRACT t his project “Hotel front Office Management System” tends to deal with the system of all the information needs of the different sections of a hotel. The hotel presidential ltd (which is a large and fast growing hotel) has because of its size and location, made its mark in the tourism industry in the city. Most times, the hotel runs... Continue Reading
    (HOTEL) ABSTRACT This project deals with “Hotel front office management information system” it deal with the system of all the management and information needs of the different section of a hotel. Most time, the hotel I runs into problem of getting necessary... Continue Reading
    ABSTRACT This project deals with “Hotel front office management information system” it deal with the system of all the management and information needs of the different sections of a hotel. Most time, the hotel runs into problem of getting necessary information in the sections of registration of guest, guest booking and reservation, check in... Continue Reading
    ABSTRACT This project deals with “Hotel front office management information system” it deal with the system of all the management and information needs of the different sections of a hotel.  Most time, the hotel  runs into problem of getting necessary information in the sections of registration of guest, guest booking and reservation, check... Continue Reading
    DESIGN AND IMPLEMENTATION OF A WINDOW BASED FRONT DESK INFORMATION SYSTEM (A CASE STUDY OF MAY FRESH SAVINGS AND LOAN LIMITED ONITSHA ABSTRACT In account form analysis, a lot of discrepancies causes by manual aspect of the form such as: lost of form, inability to correct intakes, poor storage facilities have been a problem in the May fresh savings... Continue Reading
    ABSTRACT In account form analysis, a lot of discrepancies causes by manual aspect of the form such as: lost of form, inability to correct intakes, poor storage facilities have been a problem in the May fresh savings and loan limited account form. But in recent times, the computer has come to the aid of our banks, May fresh in particular. The... Continue Reading
    Call Us
    whatsappWhatsApp Us