DESIGN AND CONSTRUCTION OF SLAB FOR WATER RESERVOIR

  • Type: Project
  • Department: Mechanical Engineering
  • Project ID: MCE0351
  • Access Fee: ₦5,000 ($14)
  • Pages: 61 Pages
  • Format: Microsoft Word
  • Views: 409
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
CHAPTER ONE
1.0 INTRODUCTION
1.1 Statement of the Problems
1.2 Objectives of the Study
1.3 Scope & Limitations of the study
1.4 Specifications the following abbreviations are used

CHAPTER TWO
LITERATURE REVIEW

CHAPTER THREE
MATERIALS AND METHOD

CHAPTER FOUR
DESIGN AND IMPLEMENTATION

CHAPTER FIVE
SUMMARY, CONCLUSION AND RECOMMENDATION



DESIGN AND CONSTRUCTION OF SLAB FOR WATER RESERVOIR
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Mechanical Engineering
  • Project ID: MCE0351
  • Access Fee: ₦5,000 ($14)
  • Pages: 61 Pages
  • Format: Microsoft Word
  • Views: 409
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Mechanical Engineering
    Project ID MCE0351
    Fee ₦5,000 ($14)
    No of Pages 61 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT The construction of the 500 gallous (2,250 litre) of water is a project which has definite mathematical patterns. The choice of a cylindrical pattern of design involved the application of mathematical deductions to analyse the size of materials required. The introductory and scope... Continue Reading
    ABSTRACT The design of natural flow and artificial lift tubing strings for the whole life of a water drive reservoir was carried out using data based on synthetic reservoir performance based on a material balance. The effects of reservoir properties on the life of the well was also investigated. Constraints such as maximum production, maximum... Continue Reading
    ABSTRACT   Demulsification (emulsion breaking) is necessary in many practical applications such as the petroleum industry, painting and waste-water treatment in environmental technology. Chemical demulsification is the most widely applied method of treating water-in-crude oil emulsions and involves the use of chemical additives to accelerate the... Continue Reading
    ABSTRACT Both water pollution and water scarcity are increasing global problems and particularly serious challenges for Africa. According to the World Health Organization, more people lack access to safe water in Africa than anywhere else in the world. To meet the growing demand for water worldwide, dams and irrigation systems are often built,... Continue Reading
    CHAPTER ONE INTRODUCTION Water is an indispensable and inevitable substance to all living things due to its usability and high priority among other substance and materials. Provision of large volume of waters essential due to its significant purpose, which therefore called for a means by which sufficient, and good quality water can be obtained.... Continue Reading
    ABSTRACT Solar energy being transmitted from the sun through space to earth by electromagnetic radiation must be converted to heat before it can be used in a practical heating or cooling system. Solar energy collectors, the devices used to convert the suns radiation to heat, usually consist of a surface that efficiently absorbs radiation and... Continue Reading
    ABSTRACT Solar energy being transmitted from the sun through space to earth by electromagnetic radiation must be converted to heat before it can be used in a practical heating or cooling system. Solar energy collectors, the devices used to convert the suns radiation to... Continue Reading
    ABSTRACT Concrete is used widely in all types of construction. In particular, it is the first choice material for the construction of various industries, due to its affordability, durability, heat resistance, strength, etc. Based on this, understanding the response of concrete structural components for all types of loading is crucial to the... Continue Reading
    ABSTRACT Billing is a critical function of most Water Boards especially towards sending the bill to their consumers. Most problems, currently seen, result from the manual processes followed. Calculation errors, delays in system updating and bill sending, also report tracking issues are the major problems that water boards find difficult to find... Continue Reading
    ABSTRACT In the construct of 2,000 litres capacity water reservoir galvanized steel sheet forms the tank and an angle iron rod forms the stand. Two full length galvanized sheet were marked out and cut out to the required sizes. The work stated by cutting the it gauges galvanized steel sheets... Continue Reading
    Call Us
    whatsappWhatsApp Us