AN ASSESSMENT OF GRAVEL PACKING METHODS USED IN THE PETROLEUM INDUSTRY

  • Type: Project
  • Department: Petroleum Engineering
  • Project ID: PEE0008
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 1.6K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

CHAPTER ONE

INTRODUCTION

Many reservoirs are comprised of relatively young sediments, which are so poorly consolidated that sand will be produced along with the reservoir fluids unless the production rate is reduced significantly. Sand production leads to many numerous production problems including erosion of down hole tubular, valves, fitting and surface flow lines, collapsed casing because of lack of formation support. Thus a means to eliminate sand production without greatly limiting production rates is desirable.

Sand production can be controlled using different methods but the method of utmost importance to this project is the mechanical method which basically involves the use of gravel pack (GRAVEL PACKING).

This method is considered the oldest and most effective sand   control mechanism. It is simply a down hole filter designed to prevent the production of unwanted sands which involves the placement of gravel across a perforated interval in the sand screen annulus and also in the perforation tunnel to prevent the influx of sand.

Inaccurate determination of gravel pack size, could lead to sand influx which could be detrimental to both the technical and economic aspect of production which is the overall objective of this project aimed at identifying means to selectively select appropriate gravel pack sizes from formation sands produced through sieve analysis to meet optimum sand control for maximum production without any detrimental effect to production hard wares.

In a gravel pack completion, sand that is larger than the average formation sand grain is placed between the formation and a screen or slotted liner with the aim of retaining most of the formation sand, but letting  very fine particles through it and be produced.

The two most common types of gravel pack completion are the inside casing gravel packing or internal gravel packing (IGP) and underreamed gravel pack or external gravel pack (EGP). The underreamed casing gravel pack provides better conductivity through the gravel but is limited to single zone completion.

1.1 AIMS AND OBJECTIVES

This project is aimed at

  1. To study   the various types of gravel packing methods  used in  the petroleum industry.
  2. To analyze sieve analysis data of formation sands gotten from OBEN13L in other to determine the appropriate gravel pack size used.
  3. To make conclusions on the state of OBEN WELL 13L on the basis of sieve data analysis and give possible recommendations.

1.2 SCOPE AND LIMITATION

The scope of this project is limited to the mechanical method  of sand control with more emphasis on the sieve analysis of formation sands gotten from OBEN13L.

1.3 METHODOLOGY

The method to be adopted for this project is the use of sieve analysis and sucier correlation to determine the gravel pack size to be used  for OBEN WELL 13 with formation sands gotten  from  the case study as mentioned above and useful information gotten from the internet, textbooks, petroleum journals. This method simply involves collecting core samples  and running them through different sieves with different opening sizes, usually sieves with larger openings at the top and sieves of smaller opening at the bottom and plotting each weight retained on each sieve against the sieve opening size to determine the average formation sand size which is used to find accurate gravel size using  sucier correlation.

AN ASSESSMENT OF GRAVEL PACKING METHODS USED IN THE PETROLEUM INDUSTRY
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Petroleum Engineering
  • Project ID: PEE0008
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 1.6K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Petroleum Engineering
    Project ID PEE0008
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 50 Pages
    Format Microsoft Word

    Related Works

    The role of TPDC remains that of exploration for hydrocarbons, production of hydrocarbons, promotion of the industrial base for the petroleum sub-sector, marketing of natural gas, marketing of petroleum products and management of fuel strategic reserves. In order to implement TPDC roles fully, TPDC must have the ability to attract investment in... Continue Reading
    ABSTRACT For thousands of years, sand and gravel have been used in the construction of roads and buildings. Today, demand for sand and gravel continues to increase. Mining operators, in conjunction with cognizant resource agencies, must work to ensure that sand mining is conducted in a responsible manner. Excessive in-stream sand-and-gravel mining... Continue Reading
    TABLE OF CONTENT Title page i Declaration ii Certification iii Dedication iv Acknowledgement v Table of contents vi Abstract vii CHAPTER ONE 1.0 Introduction 1 1.1 Statement of the problem 1 1.2 Aim and objectives 2 1.2.1 Objectives of the study 2 1.3 Justification of the study 2 1.4 Scope of study 3 1.5 Methodology 3 CHAPTER TWO 2.0 Literature... Continue Reading
    (A CASE STUDY OF LEAD WAY ASSURANCE AND I.G.I) ABSTRACT The impact of insurance in the growth of petroleum industry in Nigeria, insurance plays a vital role in the petroleum sector from the mining of petroleum products to its final use. Petroleum industry is the major... Continue Reading
    CHAPTER ONE 1.0 INTRODUCTION Yoghurt is a fermented milk product, produced with a yoghurt starter culture which is a mixed culture of streptococcus thermophilus and lactobacillus bulgaricus in a 1:1 ratio. S thermophilusenjoys a faster growth than L hulgricus.  It adds flavours and aroma to the yoghurt, though both organisms in... Continue Reading
    Abstract In the near future, Uganda is expected to join the league of oil producing countries. This is after the long period of exploration that has at last brought the good news of the existence of the oil and gas deposits in the Albertine Graben (Refer to the map of the Alberine Graben showing exploration blocks). The rest of the world observes... Continue Reading
    (A Case Study Of Eleme Petrochemical Company LtdA Case Study Of Eleme Petrochemical Company Ltd)   ABSTRACT Accounting has been described as the language of business. This is true; in fact it could be seen as the language of life because everybody is involved in... Continue Reading
    ABSTRACT Petroleum – polluted sites are disturbed ecosystem with scanty plants. Study was carried out in such sites to assess the area of its rhizobacterial status, particularly comparing that of the rhizospheres and non-rhizospheres in the site. The samples were suspended and serially diluted in physiological saline and inoculated on nutrient... Continue Reading
    This study, Assessment of different methods of sterilization of HSG equipment in Radiology Department in Enugu Urban, was done using questionnaire and interviews methods of data collection. The main purpose of the study was to determine different methods of sterilizing equipment used during HSG procedures in our locality, to assess if attention is... Continue Reading
        TABLE OF CONTENTS Title page        -           -           -           -           -           -           -           -           -          ... Continue Reading
    Call Us
    whatsappWhatsApp Us