FACTORS AFFECTING ESTIMATING ACCURACY IN BUILDING CONSTRUCTION

  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0079
  • Access Fee: ₦5,000 ($14)
  • Pages: 73 Pages
  • Format: Microsoft Word
  • Views: 557
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

The importance of estimating process when dealing with construction projects cannot be over- emphasized. That is why, the greatest problem facing Quantity Surveying practice globally is that of achieving a correlation between conceptual estimate and the final project cost which is often used by some employers to determine the efficiency of the Quantity Surveyor. This study was geared towards showing how different factors affect estimating process, the techniques used for such estimates and how often are the feedbacks and reviews from historical data of previous project works are updated by construction firm. Both quantitative and qualitative data were collected and analyzed using Pearson Product of Moment statistical tool to test for research hypothesis, tables containing the elemental cost breakdown of each project works and bar charts to illustrate the graphical relationship between the percentage deviation of the budgeted cost and factors responsible for such deviations. From the analysis carried out, result shows that, accuracy in estimating processes are largely dependent on factors such as change in project scope, change in client’s test, change in market prices of materials, weather condition (heavy rainfall) and sourced information from historical data etc.

FACTORS AFFECTING ESTIMATING ACCURACY IN BUILDING CONSTRUCTION
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0079
  • Access Fee: ₦5,000 ($14)
  • Pages: 73 Pages
  • Format: Microsoft Word
  • Views: 557
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Quantity Surveying
    Project ID QUS0079
    Fee ₦5,000 ($14)
    No of Pages 73 Pages
    Format Microsoft Word

    Related Works

      ABSTRACT The main aim of this research work is to compare the factors affecting cost of industrialized building and conventional building system in Nigeria. The research method used in collecting data was through the use of questionnaire administered to construction professionals in Nigerian construction industry. Seventy questionnaires were... Continue Reading
    Abstract The main aim of this study is to identify the significant factors for contractor selection in Nigeria using factor analysis. The study was also to find the preferred criteria for evaluation and selection of contractors in Nigeria. The selection of the most appropriate... Continue Reading
    CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control... Continue Reading
    ABSTRACT  Maintaining steady cost projection on construction projects had been until recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial Cost plan, had been prevalent on Construction sites. However, little or no efforts has made to curtail the phenomenon, it is against this background that... Continue Reading
    Construction industry in Nigeria had been a major source of employment for 70% of labour in the country, thus it controls the capital flow, as well as labour resources, which has cost implications. Adequate management of these resources is considered an important aspect of project works; so also if the resources are adequately harnessed, issues... Continue Reading
    CHAPTER ONE 1.0 INTRODUCTION 1.1 BACKGROUND OF THE STUDY The growing need for construction of all types coupled with a tight monetary supply has provided the construction industry with a big challenge to cut cost. Nigerian construction industry is faced... Continue Reading
    Abstract Pneumonia has been the leading cause of death among children under the age of five in subSaharan Africa, killing more children than the number of children dying from HIV/AIDS. The current methods of diagnosing pneumonia are limited by poor sensitivity and accuracy and they are also expensive. In this project, a low-cost biomedical device... Continue Reading
    ABSTRACT This study determined the influence of estimating practice on cost performance of building projects. The objectives were to identify the estimating practices used by cost consultants, appraise the critical factors influencing estimating practice used, and to determine the influence of estimating practice on cost performance. The study... Continue Reading
    ABSTRACT Construction works estimate inaccuracies and none performance have made the imprecise cost estimating practice subjective. This study assessed the dimensions of cost estimating risks influencing building projects’ estimates. The objectives were to identify sources of cost estimating risks; determine critical risk influencing building... Continue Reading
    ABSTRACT Construction works estimate inaccuracies and none performance have made the imprecise cost estimating practice subjective. This study assessed the dimensions of cost estimating risks influencing building projects’ estimates. The objectives were to identify sources of cost estimating risks; determine critical risk influencing building... Continue Reading
    Call Us
    whatsappWhatsApp Us