COST CONTROL TECHNIQUES USED ON BUILDING CONSTRUCTION SITES IN UGANDA

  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0086
  • Access Fee: ₦5,000 ($14)
  • Pages: 27 Pages
  • Format: Microsoft Word
  • Views: 517
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT
Many projects in Uganda and the world over have suffered from cost and time overruns due to factors stemming from poor cost control during the design and project implementation stages. Research aimed at studying the cost control techniques being used in Uganda was done on a selection of 130 contractors involved in the construction of buildings in Nakawa division, Kampala City. It specifically studied the cost control techniques currently being used by individual developers; the problems faced and proposed solutions. The research was able to identify seven commonly used cost control techniques which include schedules, budget, inspection, meetings, reports, records, monitoring & evaluations. It was noted that most project managers and contractors in Uganda find difficulty in controlling project costs due to problems which include delays by clients to release money, delay to make a decision, lack of materials and equipment, bad weather, overlapping of activities, unclear and incomplete drawings, making good defective works, and generally failure to control the productivity of resources. Others of paucity were due to theft and vandalism, interference by clients, high labour turnover, and insufficient knowledge on cost control techniques. The study was able to establish that the problem was actually not the techniques to use but rather the lack of knowledge of the techniques, the poor management of the cost control methodology, and the general poor site organisation and inadequate supervision.

KEY WORDS: Buildings, Control, Cost, Techniques, Uganda


1.0 INTRODUCTION
In construction almost all clients are interested in obtaining fully functional facilities completed in time, cost, quality and scope. A builder who is able to construct within the estimated time and budget, to the right standards and scope is an excellent builder. Cost control is a process where the construction cost of the project is managed through the best methods and techniques so that the contractor does not suffer losses when carrying out the activities of the project. One of the aims of cost control is to construct at the cheapest possible costs consistent with the project objectives. Ultimately the decision of the manager that something should be done differently and the translation of that decision into practice are the actions to achieve control (Harris and McCaffer 2002). Raina (1999) observes that it is of little use after a process has been completed to discover that its cost was actually too much. Most project managers and contractors in Uganda find difficulty in controlling costs on their construction sites due to a number of problems which include poor project preparation, lapse in management and control, over budgeting, poor materials, labour shortages, increased cost of materials, delays in deliveries, wastage of materials, unexpected weather changes, loss of materials, insecurity and poor communication. This results into cost and time overruns, conflicts, and sometimes abandoning projects. This study was therefore carried out to identify the cost control techniques used in Uganda and propose effective ones to the building construction parties. It specifically looked at problems faced by the contractors in controlling the costs on site, studied the cost control techniques commonly used by the contractors during the construction stage and proposed remedies to be used by contractors on sites to control their costs.

COST CONTROL TECHNIQUES USED ON BUILDING CONSTRUCTION SITES IN UGANDA
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0086
  • Access Fee: ₦5,000 ($14)
  • Pages: 27 Pages
  • Format: Microsoft Word
  • Views: 517
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Quantity Surveying
    Project ID QUS0086
    Fee ₦5,000 ($14)
    No of Pages 27 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT The building construction industry is very important to the socio-economic development of a nation. It portrays its religions and cultural values as well as the wealth of the nation. In spite of its importance, the construction industry has been regarded as being risky with frequent and high accident rate and Ill-health problems to... Continue Reading
      CHAPTER ONE 1.0    INTRODUCTION 1.01 (Background of the study) According to Luke chapter 14 verses 28-30 which says for which of you intending to build a tower siteth not down first and counteth the cost whether he have sufficient to finish it? Lest haply, after he hath laid the foundation, and is not able to finish it, all that behold it... Continue Reading
    1.1 BACKGROUND OF THE STUDY It is a known fact that the Nigerian construction industry continues to occupy an important position in the nation's economy even though it contributes less than the manufacturing or other service industries, (Aibinu and Jagboro, 2002). The contribution of the... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY It is a known fact that the Nigerian construction industry continues to occupy an important position in the nation’s economy even though it contributes less than the manufacturing or other service industries, (Aibinu and Jagboro, 2002). The contribution of the construction industry to national... Continue Reading
    CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control... Continue Reading
    Construction industry in Nigeria had been a major source of employment for 70% of labour in the country, thus it controls the capital flow, as well as labour resources, which has cost implications. Adequate management of these resources is considered an important aspect of project works; so also if the resources are adequately harnessed, issues... Continue Reading
    ABSTRACT  Maintaining steady cost projection on construction projects had been until recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial Cost plan, had been prevalent on Construction sites. However, little or no efforts has made to curtail the phenomenon, it is against this background that... Continue Reading
    CHAPTER ONE 1.0 INTRODUCTION 1.1 BACKGROUND OF THE STUDY The growing need for construction of all types coupled with a tight monetary supply has provided the construction industry with a big challenge to cut cost. Nigerian construction industry is faced... Continue Reading
    TABLE OF CONTENTS DECLARATION APPROVAL DEDICATION ACKNOWLEDGEMENT iv TABLE OF CONTENTS LIST OF TABLES ix LIST OF FIGURES LIST OF ACRONYMS ABSTRACT CHAPTER ONE i INTRODUCTION 1 1.0 Introduction 1 1.1 Background to the study 1 1.1.1 Historical Perspective 1 1.1.2 Theoretical Perspective 3 .1.3 Conceptual Perspective 4 1.1.4 Contextual Perspective 4... Continue Reading
    ABSTRACT This research report was carried out to ascertain whether traditional costing techniques (standard, marginal and absorption costing) are still relevant for today’s demand and greater cost accuracy. Managers and Accounting are confused about which of these techniques will enhance effective cost control and effective management decision.... Continue Reading
    Call Us
    whatsappWhatsApp Us