ABSTRACT 
Construction Management is the art of directing and coordinating human and material resources throughout the life of a construction project by using modern construction management techniques to achieve predetermined objectives of scope, cost, time, and quality and participation satisfaction. Project management in construction encompasses a set of objectives which may be accomplished by implementing a series of operations subject to resource constraints. There are potential conflicts between the stated objectives with regard to scope, cost, time and quality, and the constraints imposed on human material and financial resources. These conflicts should be resolved at the onset of a project by making the necessary tradeoffs or creating new alternatives. The construction management techniques are useful to professionals in the construction field in their day to day construction endeavours. This study had necessitated the assessment of the various Construction Management Techniques in the Nigeria Construction Industry taking Ibadan in Oyo State as a case study. The technique discussed in this study include Gantt chart, Programme Evaluation and Review Technique ( PERT), Critical Path Method ( CPM), Line of Balance, Work Breakdown Structure, PRINCE 2 , Network Analysis, Graphical Evaluation and Review Technique (GERT), Project Sensitivity Analysis, Cost Benefit Analysis and lot of others and factors such as Size of the project, Location of the project, Type of Client Source of finance , Complexity of the project, Vitality of the materials, Poor planning, Materials storage, Cost of transportation and storage and so on constitute the factors affecting construction Management Techniques in the Nigeria Construction Industry.

TABLE OF CONTENTS
Chapter One
1.0Background Information
1.1 Statement Of Research Problem
1.2 Research Questions 
1.3 Aim And Objectives Of The Study Area
1.4 Justification For The Study
1.5 Scope Of The Study
1.6 Limitation Of The Essay

Chapter Two
Literature Review
2.0 Introduction
2.1 Construction Project Management
2.1.1 Construction Project Integration Management
2.1.2 Construction Project Scope Management
2.1.3 Construction Project Time Management 
2.1.4 Construction Project Cost Management
2.1.5 Construction Project Quality Management
2.1.6 Construction Project Human Resource Management
2.1.7 Construction Project Communications Management
2.1.8 Construction Project Risk Management
2.1.9 Construction Project Procurement Management
2.2 Functions Of Construction Project Management
2.3 The Role Of Construction Project Managers
2.4 Construction Management Techniques And Tools
2.5 Construction Project Management Phases
2.6 Critical Barriers / Problems Of Implementing Effective Construction Management

Chapter Three
Research Methodology
3.0 Introduction
3.1 Research Strategy
3.2 Research Design
3.3 Research Population
3.4 Sample Frame
3.5 Sample Size
3.6 Sampling Technique
3.7 Data Collection Instrument 
3.8 Approach / Procedure For Data Collection
3.9 Method Of Data Analysis

Chapter Four
Analysis Of Data And Presentationof Results
4.0 Introduction
4.1 Levels Of Measurement
4.2 Analysis And Presentation Of Results

Chapter Five
Summary, Conclusion And Recommendation
5.1 Summary
5.2 Conclusion
5.3 Recommendation
References


BACKGROUND INFORMATION
A major concern of stakeholders (clients, consultants, contractors, e.t.c) in Nigerian construction industry is how to improve service delivery. Mitullah and Wachira (2003) have reported that the development of an efficient construction industry is an objective of policy in most countries.
The construction industry is the pivot of any economy and a belief held in both the developed and developing countries (Nubi. 2003). Adam (1992) emphasized that through its contribution v to National Gross Domestic Product (GDP), labour, employment and gross fixed capital formation (GFCF) construction industry’s importance in the overall economy cannot be underestimated. The industry provides the infrastructure, buildings, roads, bridges, dams, ports and other construction products that are required for economic development.
Construction is a $ 1.7 trillion industry worldwide (Bray, 2005). Global construction is said to have contribution amounting to between 5 and 7 percent of GDP in most countries and accounts for a significant part of global cross capital formation- a little under one third ( Brays, 2005). The United Nations Environment programme (UNEP) has noted that about one-tenth of the global economy is dedicated to construction and operating homes and offices (UNEP, 1996). Mitullah and Wichira (2003) also stated that construction activiuty plays a vital role in the process of economic growth and development, both through its products (infrastructure, buildings) and through the employment created in the process of construction itself.
The construction industry in Nigeria is of paramount importance for employment and economic growth (Ogunsemi and Jagboro, 2006). Presently, the construction industry in Nigeria contributes about 3 percent to the nation’s Gross Domestic Product (GDP) (Aganga, 2010). This is far below between 5 and 7 percent of GDP in most countries. Therefore, effort gears towards improving the efficiency of the construction industry in Nigeria in terms of improving on construction management techniques is worthwhile and will contribute to better performance of the industry. This study therefore examines the construction management techniques among contracting firms in Ibadan, Oyo State.
A project is made up of a group of interrelated work activities constrained by a specific scope, budget, and schedule to deliver capital assets needed to achieve the strategic goals of an Agency (Idoro and Patunola – Ajayi, 2009). All projects must have a beginning and an end. The management of construction projects requires knowledge of modern management as well as an understanding of the design and construction process. Construction projects have a specific set of objectives and constraints such as a required time frame for completion. While the relevant technology, institutional arrangements or processes will differ, the management of such projects has much in common with the management of similar types of projects in other specialty or technology domains such as aerospace, pharmaceutical and energy developments (Muller and Turner, 2007). Construction Project management is the art of directing and coordinating human and material resources throughout the life of a construction project by using modern construction management techniques to achieve predetermined objectives of scope, cost, time, quality and participation satisfaction (Idoro and Patunola – Ajayi, 2009).  By contrast, the general management of business and industrial corporations assumes a broader outlook with greater continuity of operations. Nevertheless, there are sufficient similarities as well as differences between the two so that modern management techniques developed for general management may be adapted for project management. (Arnaboldi et.al, 2004)
 A working knowledge of general management and familiarity with the special knowledge domain related to the project are indispensable. Supporting disciplines such as computer science and decision science may also play an important role. In fact, modern management practices and various special knowledge domains have absorbed various techniques or tools which were once identified only with the supporting disciplines. (Arnaboldi et.al, 2004). For example, computer- based information systems and decision support systems are now common-place tools for general management. Similarly, many operations research techniques such as linear programming and network analysis are now widely used in many knowledge or application domains. 
Construction project management encompasses a set of objectives which may be accomplished by implementing a series of operations subject to resource constraints. There are potential conflicts between the stated objectives with regard to scope, cost, time and quality, and the constraints imposed on human material and financial resources. (Idoro and Patunola – Ajayi, 2009) These conflicts should be resolved at the onset of a project by making the necessary tradeoffs or creating new alternatives. 

ASSESSMENT OF CONSTRUCTION MANAGEMENT TECHNIQUES IN NIGERIA CONSTRUCTION INDUSTRY
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0087
  • Access Fee: ₦5,000 ($14)
  • Pages: 35 Pages
  • Format: Microsoft Word
  • Views: 593
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Quantity Surveying
    Project ID QUS0087
    Fee ₦5,000 ($14)
    No of Pages 35 Pages
    Format Microsoft Word

    Related Works

    : The construction industry requires continuous evaluation and formulation of risk management index, but Nigeria is yet to introduce a risk rating tool for the industry. This paper therefore assessed risk management practice in Nigeria construction industry and establishes Risk Management Index (RMI). Structural questionnaire were administered to... Continue Reading
    : The construction industry requires continuous evaluation and  formulation of risk management index, but Nigeria is yet to introduce a risk  rating tool for the industry. This paper therefore assessed risk management  practice in Nigeria construction industry and establishes Risk Management  Index (RMI). Structural questionnaire were... Continue Reading
    TABLE OF CONTENT Title page                                                                       i Certification                                                                   ii... Continue Reading
    Abstract The construction industry is so hierarchical and fragmented in nature that some of the major participants do not consider themselves to be part of the same industry (Hindle, 2000).  This requires close coordination among a large number of specialized but interdependent organizations and individuals to achieve the cost, time and quality... Continue Reading
    ABSTRACT The aim of the study was to examine risk factors in accidents at construction sites at the Northern Region of Ghana. The research approach used for this study is quantitative approach. The study population consisted of site managers and project managers. Questionnaire and interview guide were used to gather primary data. Statistical... Continue Reading
    ABSTRACT The aim of the study was to examine risk factors in accidents at construction sites at the Northern Region of Ghana. The research approach used for this study is quantitative approach. The study population consisted of site managers and project managers. Questionnaire and interview guide were used to gather primary data. Statistical... Continue Reading
    ABSTRACT Studies have found labour standard practices among construction companies to be generally low in Ghana. This study therefore sought to assess labour standard practices among building construction companies in the Sunyani Municipality, identify constraints that affect same and also strategies for implementation. The study adopted... Continue Reading
    ABSTRACT   Studies have found labour standard practices among construction companies to be generally low in Ghana. This study therefore sought to assess labour standard practices among building construction companies in the Sunyani Municipality, identify constraints that affect same and also strategies for implementation. The study adopted... Continue Reading
    ABSTRACT  Studies have found labour standard practices among construction companies to be generally low in Ghana. This study therefore sought to assess labour standard practices among building construction companies in the Sunyani Municipality, identify constraints that affect same and also strategies for implementation. The study adopted... Continue Reading
      ABSTRACT The main Aim of this research is to investigate the Adoption of knowledge management in the Nigeria construction industry. The research examined the area of the construction industry that will improve as a result of the contribution of knowledge management. Data for the analysis were collected through questionnaire Administration on... Continue Reading
    Call Us
    whatsappWhatsApp Us