Quantity Surveying Project Topics and Materials (Page 4)

Showing 76 - 90 of 90

76) COST CONTROL TECHNIQUES USED ON BUILDING CONSTRUCTION SITES IN UGANDA

ABSTRACT Many projects in Uganda and the world over have suffered from cost and time overruns due to factors stemming from poor cost control during the design and project implementation stages. Research aimed at studying the cost control techniques being used in Uganda was done on a selection of 130 contractors involved in the construction of... Continue Reading

77) ASSESSMENT ON AFFORDABILITY OF FEDERAL HOUSING ESTATE

CHAPTER ONEINTRODUCTION 1.1 BACKGROUND TO THE STUDY Housing can be defined as buildings or structures that individuals and theirfamily may live in that meet certain federal regulations. Housing provision policiesand approaches have long been implemented in many developing nations in a bid toenhance its affordability as an inevitable human need... Continue Reading

78) AN INVESTIGATION ON UTILIZATION OF QS BASED SOFTWARES

CHAFTER ONE INTRODUCTION 1.1 BACKGRUOND TO THE STUDY According to (Oyediran & Odusami, 2005). The explosive growth of the information andcommunication technology (ICT) has gained unquantified impact on business systemsand processes. However, global acceptance and widespread adoption of ICT hasaccelerated the dimensions of competition not only... Continue Reading

79) ASSESSMENT OF CONSTRUCTION MANAGEMENT TECHNIQUES IN NIGERIA CONSTRUCTION INDUSTRY

ABSTRACT Construction Management is the art of directing and coordinating human and material resources throughout the life of a construction project by using modern construction management techniques to achieve predetermined objectives of scope, cost, time, and quality and participation satisfaction. Project management in construction encompasses... Continue Reading

80) COST CONTROL TECHNIQUES USED ON BUILDING CONSTRUCTION SITES IN UGANDA

ABSTRACT Many projects in Uganda and the world over have suffered from cost and time overruns due to factors stemming from poor cost control during the design and project implementation stages. Research aimed at studying the cost control techniques being used in Uganda was done on a selection of 130 contractors involved in the construction of... Continue Reading

81) FACTORS AFFECTING ESTIMATING ACCURACY IN BUILDING CONSTRUCTION

ABSTRACT The importance of estimating process when dealing with construction projects cannot be over- emphasized. That is why, the greatest problem facing Quantity Surveying practice globally is that of achieving a correlation between conceptual estimate and the final project cost which is often used by some employers to determine the efficiency... Continue Reading

82) IMPACT OF CASH FLOW AND RESOURCE CONTROL IN CONSTRUCTION PROJECTS AND DELIVERY

ABSTRACT Construction projects are complex and risky. According to the literature, even profitable construction companies can fail due to poor cash flow. In order to survive in this rapidly changing environment, effective cash flow management is essential. Many unforeseen factors affect a construction project’s cash flow. The objective of the... Continue Reading

83) THE IMPACT OF ECONOMIC RECESSION ON PUBLIC PROJECT DELIVERY IN EKITI STATE, NIGERIA

ABSTRACT This study identified the impact of economic recession on public project delivery in Ekiti State, Nigeria. Economic recession is a barrier to the completion of a project delivery. This is a common issue encountered in the construction industry across the globe most especially in the developing countries. In Ekiti-State, more than 15% of... Continue Reading

84) AN ASSESSMENT OF BUILDING COLLAPSE IN NIGERIA (EDO STATE AS A STUDY AREA)

Abstract The age-less interaction between man and his built environment has always had positive and negative impacts on the two. Environmental disaster of varying origin from man-made to natural is one of the most negative effects of the built environment on man. An assessment of the magnitude of these disasters and an evaluation of the existing... Continue Reading

85) ASSESSMENT OF RISK MANAGEMENT PRACTICES AMONGST QUANTITY SURVEYORS IN THE NIGERIAN CONSTRUCTION INDUSTRY

: The construction industry requires continuous evaluation and formulation of risk management index, but Nigeria is yet to introduce a risk rating tool for the industry. This paper therefore assessed risk management practice in Nigeria construction industry and establishes Risk Management Index (RMI). Structural questionnaire were administered to... Continue Reading

86) AN APPRAISAL OF THE QUANTITY SURVEYORS COST CONTROL ACTIVITIES IN NIGERIA CONSTRUCTION INDUSTRY

ABSTRACT It is interesting to bring to light the demands challenges and development in the twenty-first century the key role of the quantity surveying profession in the economic with emphasis on an appraisal of the quantity surveyor cost control in Nigeria construction industry. The work shall attempt to explore the quantity surveyor who is... Continue Reading

87) COMPARATIVE STUDY OF RELEVANCY OF HIGHER NATIONAL DIPLOMA AND BACHELOR OF SCIENCE TRAINING TO CORE QUANTITY SURVEYING PRACTICES

ABSTRACT Deployment of appropriate skills and competencies is crucial and germane to the development and continuous relevance of any profession. In the built environment, the art of selecting the required skills and competencies expected of quantity surveyors and understanding the inherent dependencies between them remains a research issue. The... Continue Reading

88) FACTORS INFLUENCING THE COST PLANNING OF PUBLIC BUILDING PROJECT

ABSTRACT The importance of accurate estimate during the early stage of cost planning of capital project has been widely recognized for many years. Even so, very few quantitative method are available that enable estimators and business managers to objectively evaluate the accuracy of early estimates and planning. The primary purpose of this study... Continue Reading

89) POTENTIALITIES OF WHISTLEBLOWING IN DEALING WITH UNETHICAL PRACTICES IN THE NIGERIA CONSTRUCTION INDUSTRIES

ABSTRACT Construction industry is a very challenging and complex sector. The ability to control and communicate with various stages, process and parties to meet the project objectives are not an easy job and these responsibilities are on the professionals shoulders. Besides that, the professionals are also facing their own crisis and dilemma as an... Continue Reading

90) TOPOGRAPHICAL SURVEYING OF GOVERNMENT TECHNICAL COLLAGE IDAH KOGI STATE

ABSTRCT This project aimed purposely at the production of topographic plan of Government technical college idah Kogi State. The following surveying methods are carried out to achieve this project. A reconnaissance surveying of the area to be survey was carried out before other topographical surveying method was carried out total station traversing... Continue Reading