Project Topics and Materials - Page 1,504

Showing 37,576 - 37,600 of 39,396

37,576) DESIGN AND OPERATION OFA SHELL AND TUBE HEAT EXCHANGER

TABLE OF CONTENT CHAPTER ONE Introduction CHAPTER TWO 2.0 Literature Review 2.0.1 Classification of heat Exchanger 2.0.2 Categories of heat exchangers 2.0.3 Types of heat exchangers 2.0.4 Material for constructions 2.0.5 Tube shape and position 2.0.6 Firing 2.0.7 Heat source 2.0.8 Design... Continue Reading

37,577) THE POTENTIALS FOR A CO-OPERATIVE THRIFT CREDIT SOCIETY IN A HIGHER EDUCATION INSTITUTION (A CASE STUDY OF I.M.T, ENUGU)

THE POTENTIALS FOR A CO-OPERATIVE THRIFT CREDIT SOCIETY IN A HIGHER EDUCATION INSTITUTION (A CASE STUDY OF I.M.T, ENUGU) TABLE OF CONTENTS CHAPTER ONE 1.1 Background of the study/Introduction 1.2 Statement of Problem 1.3 Purpose of the Study 1.4 Scope of the Study 1.5 Significance of the Study 1.6 Definition of Term 1.7 Research Questions. CHAPTER... Continue Reading

37,578) THE USE OF LOCAL PIGMENTS AND EXTENDERS FOR FORMULATION & PRODUCTION OF EMULSION PAINT

THE USE OF LOCAL PIGMENTS AND EXTENDERS FOR FORMULATION & PRODUCTION OF EMULSION PAINT ABSTRACT The major aim of this project research work is to produce emulsion paint from locally sourced pigment & extenders. The materials used for the production was of local source. The major raw materials used for the production of the emulsion paint:... Continue Reading

37,579) COMPARATIVE ANALYSIS OF COAL AND COCONUT ACTIVATED CARBON

ABSTRCT The experiment was carried out to analyze comparatively coal and coconut activated carbon. The coal sample used in bituminous and with density of 1300kg 1m3 tile coconut shell was used. The coal and coconut shell was first activated using phosphoric acid. The activated coal and... Continue Reading

37,580) DESIGN AND CONSTRUCTION OF A SINGLE PHASE AUTO-TRANSFORMER OF RATING IKVA, 240V/110, 80 12V, 6V

ABSTRACT This project work-up deals on the design and construction of a single phase step down nations fermor, with raking IKVA, 240V/11OV, 80V 12U, 6V. It is a multi-circuit transformer that has one input as the primary and tappins to produce the... Continue Reading

37,581) CONSTRUCTION OF STEEL SHELF

ABSTRACT The aim of this project was to acquire the constructional and fabrication knowledge by we, the students of chemical engineering by constructing a steel bookshelf. This work exposed us to many things like material for engineering and their requirements. It also exposed us to other fields of engineering like... Continue Reading

37,582) THE DESIGN AND FABRICATION OF A CANDLE MOULDING MACHINE

THE DESIGN AND FABRICATION OF A CANDLE MOULDING MACHINE ABSTRACT The idea of producing “candle stick” brought the existence of fabricating a “candle moulding machine” which can produce a desired shape of a candle foe the benefit of mankind. In chapter 1, which is the research work of the project carried out, the problem encountered and the... Continue Reading

37,583) THE CONSTRUCTION AND FABRICATION OF A CANDLE MOULDING MACHINE

ABSTRACT The candle molding machine is a vital device which cannot be done without, in any nation. This is because of the indispensable role candle plays, especially when there is no either source of light. In order to enhance adequate supply to both urban and rural consumers, the... Continue Reading

37,584) DESIGN AND CONSTRUCTION OF AN INVERTER

ABSTRACT An inverter is an electronic device that converts direct current (DC¬) to alternating current (AC) the converted Ac can be at any required voltage and frequency with the use of appropriate transformers, switching and control circuit. It’s simple put, is an electronic box that makes household... Continue Reading

37,585) THE DESIGN AND CONSTRUCTION OF MINI RADIO BROADCAST TRANSMITTER AND AUDIO CONSOLE USING FREQUENCY MODULATION (FM) WITH POWER RATING OF 1 WATT

THE DESIGN AND CONSTRUCTION OF MINI RADIO BROADCAST TRANSMITTERAND AUDIO CONSOLE USING FREQUENCYMODULATION (FM) WITH POWER RATING OF 1 WATT ABSTRACT The early transmitter for radio broadcasting is so big and bulky that they do occupy numerous spaces. The circuitries are mainly designed with valves, which are big in sizes. With the advent of... Continue Reading

37,586) CONSTRUCTION OF CELLOPHANCE SEALING MACHINE

ABSTRACT The construction of the callophane sealing machine was carried out. The project started with an encompassing review of the various methods of heat sealing film packages. The machine can be used in sealing both low, medium and high-density cellophane. The product has a heating element, which... Continue Reading

37,587) CONSTRUCTION OF METAL SHARPENING AND DULLING DEVICE

CONSTRUCTION OF METAL SHARPENING AND DULLING DEVICE ABSTRACT As a result of modern development in Science and Technology, most of the large scale industrial used machine were now modernized to simple small and efficient machines. Some of these machines were either operated manually or the aid of electricity. For this reason, big metal sharpening... Continue Reading

37,588) THE DESIGN AND FABRICATION OF MECHANCIAL LAWN MOWER

ABSTRACT Mechanical engineering department of the named institute has many non operational machines sequel to this fact maintenance which resulted to non development and non maintenance of the institute community at large. By this fact the project (mechanical lawn mower) was constructed and... Continue Reading

37,589) CONSTRUCTION OF METAL SHARPENING AND DULLING DEVICE

CONSTRUCTION OF METAL SHARPENING AND DULLING DEVICE ABSTRACT As a result of modern development in Science and Technology, most of the large scale industrial used machine were now modernized to simple small and efficient machines. Some of these machines were either operated manually or the aid of electricity. For this reason, big metal sharpening... Continue Reading

37,590) DESIGN AND CONSTRUCTION OF AN AUTOMATIC THREE PHASE SELECTOR.

ABSTRACT This is a technical report presented on the design and construction of an Automatic Three Phase Selector. In the construction work, an ordinary level knowledge of electronics principles are observed. We aimed at presenting a practical aspect of the subject and then providing... Continue Reading

37,591) DESIGN AND CONSTRUCTION OF AN AUTOMATIC THREE PHASE SELECTOR.

ABSTRACT This is a technical report presented on the design and construction of an Automatic Three Phase Selector. In the construction work, an ordinary level knowledge of electronics principles are observed. We aimed at presenting a practical aspect of the subject and then providing... Continue Reading

37,592) DESIGN AND CONSTRUCTION OF A 12 VOLTS AUTHOMATIC BATTERY CHARGER

ABSTRACT A battery charger is an electrical device employed for charging batteries. This batteries that are usually charged by battery changer are the storage battery charger are the storage batteries also known as “accumulator” the battery changer changes. The alternating... Continue Reading

37,593) REHABILITATION OF ROAD LINKING UMUEKULUMMIRI STREET TO IMT AWARNESS GROUND JUNCTION IMT CAMPUS III ENUGU

REHABILITATION OF ROAD LINKING UMUEKULUMMIRI STREET TO IMT AWARNESS GROUND JUNCTION IMT CAMPUS III ENUGU ABSTRACT This project entitled “Rehabilitation of Road” is aimed at investigating the causes of failure on the road linking Federal Secretariat, IMT Civil soil lab to Industrial Centre IMT Campus III Enugu and the possible way of... Continue Reading
  • Type:Project
  • ID:CVE0005
  • Pages:137

37,594) DESIGN AND CONSTRUCTION OF 1000VA AUTOMATIC VOLTAGE REGULATION ;

DESIGN AND CONSTRUCTION OF 1000VA AUTOMATIC VOLTAGE REGULATION ABSTRACT The design and construction of 1000VA Automatic Voltage Regulator is made to power our Electrical and Electronic devices, supplying them with the normal output voltage which ranges from 100V- 240v irrespective of the constant voltage and current fluctuation, failure and... Continue Reading

37,595) CONSTRUCTION OF CAR TOUCH INTRUDER ALARM.

CONSTRUCTION OF CAR TOUCH INTRUDER ALARM ABSTRACT The main objective of this project was to ensure a proper security to car being parked in garage against theft or an intruder. The circuit uses three NE555 timers; one of the NE555 was wired as a monostable oscillator and remaining two were wired as tone generator and amplified to obtain a maximum... Continue Reading

37,596) POWER OUTAGE IN NIGERIA

ABSTRACT This research work examines the factors affecting power outage in Nigeria. Constants Power supply is the hallmark of a develop economy. Any nation whose energy need is epileptic in supply. Prolongs her development and risk-losing potential investors. Nigeria with population of over 12 million people has for the... Continue Reading

37,597) DESIGN AND CONSTRUCTION OF SOUND DETECTOR WITH ALARM SYSTEM

ABSTRACT This project is design and construction of a sound detector with alarm system was done primarily to detector sound. It can be use in industrial and domestics. It employ four discreet stages with power supply which power the system. The 1st block is pick up amplifier containing... Continue Reading

37,598) FACTOR AFFECTING POWER OUTAGE IN NIGERIA

ABSTRACT This research work examines the factors affecting power outage in Nigeria. Constants Power supply is the hallmark of a develop economy. Any nation whose energy need is epileptic in supply prolongs her development and risk-losing potential investors. Nigeria with population of over 120 million... Continue Reading

37,599) THE WATER DRAINAGE PROBLEMS (A CASE STUDY OF IMT CAMPUS 3 ENUGU)

ABSTRACT This research work on the water drainage problems (A case study of IMT campus 3 Enugu), the scope of this research work covers every activity which has to do with the drainage problems, background to the subject matter, rational for the study and the limitations of the... Continue Reading

37,600) CONSTRUCTION OF A SIX RAISED PANEL DOOR

TABLE OF CONTENTS CHAPTER ONE 1.0 Introduction 1.1 Definition of a panel door 1.2 Classification of a door 1.3 Objectives of the project 1.4 Significance of the project CHAPTER TWO 2.0 Timber 2.1 Definition of timber 2.2 Growth of timber 2.3 Types of timber 2.4 Conversion of timber 2.5 Methods of conversion... Continue Reading
whatsappWhatsApp Us