THE IMPLICATION AND BENEFIT OF THE USE OF SOFTWARES IN BUILDING PROJECT CONSTRUCTION

  • Type: Project
  • Department: Building
  • Project ID: BLD0010
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Methodology: Statistical Analysis
  • Reference: YES
  • Format: Microsoft Word
  • Views: 1.5K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Abstract

Software is any set of machine-readable instruction that directs a computer processor to perform specific operations. Microsoft project software (MS Project) is one of such software that is a program developed  and sold by Microsoft which is designed to assist a project  manager in developing a plan, assigning resources to task tracking work progress, managing the budget ,analyzing work load schedule, upgrade information and communication status in building  project construction. Although this software use in our country Nigeria is still little but for those firms project Team/manager who uses it have seen it important to the project (building project).  Microsoft project offers easy productivity in building project construction like WBS, outline tasks assign resources/cost, tracking and reporting, collaborating information with project managers if any. Every about scheduling and management of building project are in place in this software and it allows one to choose from different alternative view point (Garth chart, Bar chart, pert and network diagram etc) it also help users “project team” to reselect, remove, correct and upgrade current or future information if any. Most managers or users are ignorant of what ms project does, it will be difficult for them to know its functions and understand them. Due to the fact our country Nigeria lags behind in meeting up with the standard of the world globalization system technology.

THE IMPLICATION AND BENEFIT OF THE USE OF SOFTWARES IN BUILDING PROJECT CONSTRUCTION
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Building
  • Project ID: BLD0010
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Methodology: Statistical Analysis
  • Reference: YES
  • Format: Microsoft Word
  • Views: 1.5K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Building
    Project ID BLD0010
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 50 Pages
    Methodology Statistical Analysis
    Reference YES
    Format Microsoft Word

    Related Works

    ABSTRACT    The need for the Nigerian construction industry to move away from the traditional forms of project procurement and embrace project management services cannot be over emphasized.  This is as a result of the importance of capital projects to the development of a young nation.  This study investigated the impact of project management... Continue Reading
    ABSTRACT In this study research, we have examined the Project Evaluation and Review Technique, PERT and the Critical Path Method CPM/Critical Path Analysis. CPA as Project Management tools, among others, and applied them to study the Electrical and Mechanical services contract of the School of Health Technology Building Project, FUTO, using... Continue Reading
    ABSTRACT    In this study research, we have examined the Project Evaluation and Review Technique, PERT and the Critical Path Method CPM/Critical Path Analysis. CPA as Project Management tools, among others, and applied them to study the Electrical and Mechanical services contract of the School of Health Technology Building Project, FUTO, using... Continue Reading
    INTRODUCTION Construction has turned into an ever more complex mesh of relationships between increasingly accelerating processes, decisions and actions. At the same time, however, there is a development toward sustainable Just as any other project, a construction project includes certain development phases that differ from each other in terms of... Continue Reading
    Research aim and objective Research question Research hypothesis Delimitation and Scope of the study Definition of Terms4 Chapter Two: Literature Review  The Construction Industry 6        Culture 6 Quality 8 Key performance indicators (KPI)9 Quality Culture9      Element of quality culture  Factors affecting the maintenance of quality... Continue Reading
    ABSTRACT Generally, the success of completing any building construction project is based on key performance indices such as timely delivery of project, construction period, defects as well as client satisfaction. However, what effect does the implementation of safety management practices has on building construction project success? This research... Continue Reading
    ABSTRACT The purpose of this study was to determine the impact of effective building production management in successful building project delivery in Akwa in Anambra State. A three research question were formulated which guided the study. The population of the study comprises of building production management professionals in construction firms. A... Continue Reading
    ABSTRACT The building construction industry is very important to the socio-economic development of a nation. It portrays its religions and cultural values as well as the wealth of the nation. In spite of its importance, the construction industry has been regarded as being risky with frequent and high accident rate and Ill-health problems to... Continue Reading
    ABSTRACT Monitoring and Evaluation over time have gained traction and become fundamental components in projects. Most internal evaluations are based on the assumption that evaluators are independent and do not bow to different forms of influence. Literature however reveals cases of evaluators being confronted by stakeholders to either alter or... Continue Reading
    ABSTRACT This study sought risk management and performance of UNDP projects in Somalia: a case study of Mogadishu to cadale road construction projet.~t. The objectives were; To establish relationship between risk identification and project performance of Mogadishu to Cadale Road Construction project, To assess the relationship between risk... Continue Reading
    Call Us
    whatsappWhatsApp Us