PROJECT EVALUATION AND REVIEW TECHNIQUE/CRITICAL PATH METHOD NETWORK SCHEDULING TECHNIQUE IN A BUILDING CONSTRUCTION PROJECT

  • Type: Project
  • Department: Project Management
  • Project ID: PRM0036
  • Access Fee: ₦5,000 ($14)
  • Pages: 226 Pages
  • Format: Microsoft Word
  • Views: 574
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT 

 

In this study research, we have examined the Project Evaluation and Review Technique, PERT and the Critical Path Method CPM/Critical Path Analysis. CPA as Project Management tools, among others, and applied them to study the Electrical and Mechanical services contract of the School of Health Technology Building Project, FUTO, using Network Planning and Scheduling approach. We reviewed relevant past literature to ascertain the views of professionals in project management, and accordingly developed the complete Work Breakdown Structure, WBS, of the project into its minutest various activities with corresponding duration times and resources loading to arrive at the resulting Network Schedule. We carried out the analysis to determine the critical and other paths, earliest and latest start and finish times, floats resource/man power loading and smoothing and other critical indices. We showed that the potential problem of -he contractor, and in reality contractors, not using PERT/CPM Network technique led or would lead to project slip and time and cost overruns, all other things being equal. Finally, we re-examined and appraised the Bar/Gantt chart and PERT'CPM project planning techniques and recommended, in addition, efficient resource allocation/ scheduling method, use of experienced personnel and the application/use of personal computers with suitable programme packages to reduce the tedium of iterations. 

KEY WORDS 

Work Breakdown Structure; Scheduling; Network Structure; Critical Path; Project Evaluation and Review Technique; Building Construction Project; Lead and Lag time. 

 

PROJECT EVALUATION AND REVIEW TECHNIQUE/CRITICAL PATH METHOD NETWORK SCHEDULING TECHNIQUE IN A BUILDING CONSTRUCTION PROJECT
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Project Management
  • Project ID: PRM0036
  • Access Fee: ₦5,000 ($14)
  • Pages: 226 Pages
  • Format: Microsoft Word
  • Views: 574
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Project Management
    Project ID PRM0036
    Fee ₦5,000 ($14)
    No of Pages 226 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT    In this study research, we have examined the Project Evaluation and Review Technique, PERT and the Critical Path Method CPM/Critical Path Analysis. CPA as Project Management tools, among others, and applied them to study the Electrical and Mechanical services contract of the School of Health Technology Building Project, FUTO, using... Continue Reading
    ABSTRACT In this study research, we have examined the Project Evaluation and Review Technique, PERT and the Critical Path Method CPM/Critical Path Analysis. CPA as Project Management tools, among others, and applied them to study the Electrical and Mechanical services contract of the School of Health Technology Building Project, FUTO, using... Continue Reading
    ABSTRACT    The need for the Nigerian construction industry to move away from the traditional forms of project procurement and embrace project management services cannot be over emphasized.  This is as a result of the importance of capital projects to the development of a young nation.  This study investigated the impact of project management... Continue Reading
    INTRODUCTION Construction has turned into an ever more complex mesh of relationships between increasingly accelerating processes, decisions and actions. At the same time, however, there is a development toward sustainable Just as any other project, a construction project includes certain development phases that differ from each other in terms of... Continue Reading
    Abstract Software is any set of machine-readable instruction that directs a computer processor to perform specific operations. Microsoft project software (MS Project) is one of such software that is a program developed  and sold by Microsoft which is designed to assist a project  manager in developing a plan, assigning resources to task... Continue Reading
    ABSTRACT This study sought risk management and performance of UNDP projects in Somalia: a case study of Mogadishu to cadale road construction projet.~t. The objectives were; To establish relationship between risk identification and project performance of Mogadishu to Cadale Road Construction project, To assess the relationship between risk... Continue Reading
    Research aim and objective Research question Research hypothesis Delimitation and Scope of the study Definition of Terms4 Chapter Two: Literature Review  The Construction Industry 6        Culture 6 Quality 8 Key performance indicators (KPI)9 Quality Culture9      Element of quality culture  Factors affecting the maintenance of quality... Continue Reading
    ABSTRACT Generally, the success of completing any building construction project is based on key performance indices such as timely delivery of project, construction period, defects as well as client satisfaction. However, what effect does the implementation of safety management practices has on building construction project success? This research... Continue Reading
    ABSTRACT The purpose of this study was to determine the impact of effective building production management in successful building project delivery in Akwa in Anambra State. A three research question were formulated which guided the study. The population of the study comprises of building production management professionals in construction firms. A... Continue Reading
    ABSTRACT This research work examined the roles of Project evaluation on business activities of Construction Companies. Emphasis is made on how Construction Companies go about the evaluation and selection of Projects to be carried out. The researcher used three (3) Construction Companies in Abeokuta South, Ogun State which are: Sato Engineering... Continue Reading
    Call Us
    whatsappWhatsApp Us