MONITORING AND EVALUATION APPROACHES AND PERFORMANCE OF GALANA KULALU MAIZE IRRIGATION PROJECT, KENYA


For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT 

In order for projects to achieve the intended objectives there is need for the project team to continuously, monitor the project activities with the objective of ensuring that the project is on course and take corrective actions whenever there are significant deviations. This process involves regular and systematic collection, analysing and reporting of information about a project’s inputs, activities, outputs and intended impact. In addition, due to continuous calls for accountability and transparency in project management, project managers are required to continuously monitor and evaluate their projects to ensure that they meet the objectives for which they were established. However, in spite of the important element of monitoring and evaluation in project success, there is still limited evidence on the effect of each monitoring and evaluation approach on project performance. To address this gap, the study investigated the influence of monitoring and evaluation approaches on the performance of maize production projects based on Galana Kulalu irrigation project. The study objectives evaluated the effects of result-oriented logical framework, participatory and rapid appraisal monitoring and evaluation approaches on performance of maize production projects. The study operationalization was guided by change theory and the results based management theory. The study was based on descriptive research design with a population of 132 target respondents drawn from the ministry of water and sanitation from which stratified sampling method will be used to select a sample of 71 respondents. Primary data was utilised in carrying out the analysis which was obtained through a semi structured questionnaire. A pilot study was conducted in Tana Irrigation Scheme to improve validity of questionnaires while Cronbach’s Alpha was used to test for reliability. Data collected from the field was analysed on the basis of descriptive statistics including means, frequencies and standard deviation for quantitative data and conceptual content analysis for qualitative data. Inferential analysis was carried out using regression analysis. The predictive power of the model was established through R2 , the fitness of the model assessed through the Fstatistic while the significance of the study coefficients assessed through the P-value. Relevant diagnostic tests were carried out while at the same time ethical factors were put into consideration while carrying out the research. The study concluded that monitoring and evaluation approaches was a significant factor in determining performance of the Galana Kulalu Maize Production irrigation project, Kenya. The study concluded that the project significantly embraced monitoring and evaluation. The study further concluded that result oriented approach, logical framework approach, participatory approach and rapid appraisal monitoring and evaluation approach were significantly employed by the project team and they had a positive and significant effect on performance of the project. The study recommends that the project team needs to embrace continuous, regular and objective M&E to ensure the project is within schedule, budget and scope. The study recommends that the project M&E team needs to integrate the four monitoring and evaluation approaches for better results. The study recommends further that the project team needs to involve all stakeholders in the monitoring

MONITORING AND EVALUATION APPROACHES AND PERFORMANCE OF GALANA KULALU MAIZE IRRIGATION PROJECT, KENYA
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Business Administration and Management
    Project ID BAM3533
    Fee ₦5,000 ($14)
    No of Pages 72 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT  In order for projects to achieve the intended objectives there is need for the project team to continuously, monitor the project activities with the objective of ensuring that the project is on course and take corrective actions whenever there are significant deviations. This process involves regular and systematic collection, analysing... Continue Reading
    CHAPTER ONE 1.0 INTRODUCTION 1.1 BACKGROUND OF THE STUDY A well-thought and effectively executed project to a large extent contributes to national development. For a project to be implemented and objective of it realized, a thorough monitoring and evaluation of it has to be carried out. Any government intervention project embarked upon without... Continue Reading
    ABSTRACT  Given the increasing freshwater scarcity, the performance of irrigation is critical in increasing and sustaining agricultural productivity in the water-scarce and largely arid and semi-arid Kenya. Irrigation currently accounts for most of the water withdrawals in the country, and the required improvement in the performance of irrigation... Continue Reading
    ABSTRACT It is a precondition by benefactors that every proposal must have provision for effective M&E Systems costed for and performed by skilled M&E staff. Donors have further recommended that ten percent of the financial resources must be set aside for performing M & E in donor funded projects. However, this is not the case in primary education... Continue Reading
    ABSTRACT Incidents of poor performance of community projects have been documented by various research studies. Many projects encounter delays in implementation, poor quality of projects, time and cost overruns that affect the overall achievement of project objectives (Ramathan et al., 2012). The major problem being that introduction of technology... Continue Reading
    ABSTRACT The aim of this project is to design and construct an automated irrigation and monitoring system for a greenhouse. In this project, we design a system that uses data’s related to a greenhouse environment and yield status to control the designed system for the greenhouse. A greenhouse requires regular monitoring. The current system of... Continue Reading
    ABSTRACT There have been numerous complaints by scholars, researchers, professionals and consultants that CDF projects are not performing. The speed at which the government deals with the grey areas of CDF funded projects management will determine the realization of the Kenya Vision 2030 whose main objective is to transform Kenya’s economy... Continue Reading
    ABSTRACT  Agricultural based projects play a major part in sustaining domestic and regional economic growth and are important agents for alleviating poverty in developing countries. Utilization of technology in agricultural based projects however remains an issue of concern to researchers, government and project stakeholders. Recent studies have... Continue Reading
    ABSTRACT The objectives of the study focus on the impact of motivational factors employed in LAIP between 2005 to 2010 on employees productivity, as well as why motivation failed to improve employees productivity in LAIP. The researcher formulated five hypotheses which were tested. The data for the study were generated from the copies of... Continue Reading
    ABSTRACT Monitoring and evaluation has been a key performance management tool for planning, decision making and economic policy management. However, evidence from literature point out that in Sub-Saharan Africa substantial M&E achievements on the ground are rare. The County Governments has been facing serious challenges in managing the projects... Continue Reading
    Call Us
    whatsappWhatsApp Us