A PROJECT REPORT ON CONSTRUCTION OF INDUSTRIAL SIEVE COMPARTMENT

  • Type: Project
  • Department: Chemical Engineering
  • Project ID: CNG0022
  • Access Fee: ₦5,000 ($14)
  • Chapters: 6 Chapters
  • Pages: 51 Pages
  • Methodology: Scientific Method
  • Reference: YES
  • Format: Microsoft Word
  • Views: 3.2K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
A PROJECT REPORT ON CONSTRUCTION OF INDUSTRIAL SIEVE COMPARTMENT
ABSTRACT

        The construction of Sieve Industrial Sieve Compartment was carried out in the Engineering Workshop, Institute of Management and Technology, Enugu.
        The aim of this project is to fabricate an industrial sieve compartment which is capable of separating solid particles of various sizes.
        The construction was carried out in order to analyze the sizes of particles.
        The component parts of the set of sieve and their dimensions are as follows:
Height of sieve            -       300mm
No of sieve         -       4
Diameter of sieve        -       300mm
Shape of sieve            -       Circular
Height of sieve set       -       900mm
Mesh/hole sizes   -       top – 6.0mm, 2nd – 5.0mm 3rd  - 3.0mm, bottom 1.0mm respectively.
        In construction of sieve compartment, some factors were taken into consideration and they are:
-              The capacity of the sieve
-              The type of material to be used for constructing sieve
-              The availability of the material
-              The type of mixture that can be filtered in it
-              Cost which is the determinant factor in fabrication of any equipment.
These factors listed helped greatly in completion of this project.
At the end of the fabrication, a sieve equipment was constructed with specified dimensions.
 TABLE OF CONTENTS
CHAPTER ONE: INTRODUCTION
1.1    Background of Study                                   
1.2    Statement of Problem                                  
1.3    Purpose/Aims/Objective of the Study              
1.4    Scope and Limitation of the Study                  
1.5    Method of Research                                     
1.6    Significance of the Study                              
CHAPTER TWO:  LITERATURE REVIEW
2.1History of Sieve                                              
2.2    Theory of Sieve                                          
2.3    Definition of Sieve                                               
2.4    Types of Sieve                                                    
CHAPTER THREE
METHODOLOGY                                           
CHAPTER FOUR
4.0    RESULT/ANALYSIS                                                       
4.1    Material Balance on Sieve                             
4.2    Screen Analysis                                   
CHAPTER FIVE
Discussion                                                          
CHAPTER SIX
CONCLUSION AND RECOMMENDATION                   
REFERENCE                                                        
CHAPTER ONE
INTRODUCTION
1.1       BACKGROUND OF THE STUDY
Generally all Chemical Engineering mostly deals with the construction of sieve among other construction in order to fulfill the theory of separation technique.
Industrial sieve compartment is a kind of machine fabricated to be used in separating solid particles.  The sieving equipment works by allowing solid particles of different sizes to pass through the pores or the aperture which consist of orderly, arranged sets of sieves in a manner of the particle sizes and shapes.  Basically sieve equipments consist of a set of sieves preferably with the quality of shocker in accordance with its speed range.
The sieve equipment operates best when the solid particles is in their coarse and fine form.  The equipment has high sensitive efficiency, but only few have been constructed since the development of separation of particles.  This is as a result of the losses incurred and the procedure involved and also the labour needed to clean the sieve plate and to handle the sieve equipment.
However, in the construction of sieve, we have to bear certain qualities in mind to portray such as determination of size and shape of the equipment which contributes to the efficiency of the equipment.  
Size separation is a unit operation technique which is often used daily in industries, and our daily lives.  Sieving one of the size separation technique that is often needed and therefore sieve is the equipment used, and therefore for effective size separation, there is need for constructing of sieve compartments.
1.2       STATEMENT OF PROBLEMS
Before the existence of sieve compartment, there has been a lot of difficulties which one normally face when making or fabricating the equipment.  They include; cuttings during cutting, the whole cutted mesh might not be the same.    
Coupling – when coupling, the different cutted materials might not exactly fit, but joined using trial and error method.  And availability of material is also one of the problems encountered.
1.3       PURPOSE/AIMS/OBJECTIVES OF THE STUDY
The main aim of this project is to fabricate or construct a sieve which is the basis of separation of solid particles into different sizes by passing it through mesh and with the assistant of shaking, large particles are retained on the mesh which is referred to as (oversize) and the undersize.   
1.4       METHOD OF RESEARCH
The research was done by sourcing information from the library, internet textbooks and from previous or related subjects projects.
Empirical research was also conducted by performing a standard construction of a sieve compartment in the workshop.  The apparatus for the construction was set up and carried out with all the precautions strictly adhered to.
1.5       SIGNIFICANCE OF THE STUDY
Construction of industrial sieve compartment has played a significance role to mankind and industries.  The construction of this work help to carry out effective separation without much problems.
It reduces the physical effort required by an operators, free him from tediously repeated sieving or separation because the sieve is in set and contains a shocker which when plug to the socket, performs the operation or separation on itself.



A PROJECT REPORT ON CONSTRUCTION OF INDUSTRIAL SIEVE COMPARTMENT
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Chemical Engineering
  • Project ID: CNG0022
  • Access Fee: ₦5,000 ($14)
  • Chapters: 6 Chapters
  • Pages: 51 Pages
  • Methodology: Scientific Method
  • Reference: YES
  • Format: Microsoft Word
  • Views: 3.2K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Chemical Engineering
    Project ID CNG0022
    Fee ₦5,000 ($14)
    Chapters 6 Chapters
    No of Pages 51 Pages
    Methodology Scientific Method
    Reference YES
    Format Microsoft Word

    Related Works

    ABSTRACT The construction of Sieve Industrial Sieve Compartment was carried out in the Engineering Workshop, Institute of Management and Technology, Enugu. The aim of this project is to fabricate an industrial sieve compartment which is capable of separating solid particles of various sizes. The... Continue Reading
    ABSTRACT The sets of seizes with shocker which was fabricated and assembled in the chemical engineering pilot plant was aimed at providing the students with a machine that will aid them in practical involving the separation of solid particles. Besides this, it was also fabricated sizes or diameter of the solid particles of a substance by allowing... Continue Reading
    ABSTRACT The sets of seizes with shocker which was fabricated and assembled in the chemical engineering pilot plant was aimed at providing the students with a machine that will aid them in practical involving the separation of solid particles. Besides this, it was also fabricated sizes or diameter of the solid particles of a substance by allowing... Continue Reading
    ABSTRACT The sets of seizes with shocker which was fabricated and assembled in the chemical engineering pilot plant was aimed at providing the students with a machine that will aid them in practical involving the separation of solid particles. Besides this, it was also fabricated sizes or diameter of the solid particles of a substance by allowing... Continue Reading
    ABSTRACT The sets of seizes with shocker which was fabricated and assembled in the chemical engineering pilot plant was aimed at providing the students with a machine that will aid them in practical involving the separation of solid particles. Besides this, it was also fabricated sizes or diameter of the solid particles of a substance by allowing... Continue Reading
    ABSTRACT The sets of seizes with shaker which was fabricated and assembled in the Chemical Engineering pilot plant was aimed at providing the students with a machine that will aid them in practical involving the separation of solid particles, besides, this, it was also fabricated sizes or diameter of the solid particles of a substances by allowed... Continue Reading
    THE CONSTRUCTION OF SIEVE ANALYSIS EQUIPMENT ABSTRACT The sets of seizes with shaker which was fabricated and assembled in the Chemical Engineering pilot plant was aimed at providing the students with a machine that will aid them in practical involving the separation of solid particles, besides, this, it was also fabricated sizes or diameter of... Continue Reading
    Cassava is produced in a large quantity in Nigeria. One of the products emerging  from its processing has turned out to be a major staple food in the nation, which is ‘garri’.  Due to insufficient and inadequate processing equipment; cassava has been susceptible to  wastage and ‘garri’ production has been reduced in scale, thereby... Continue Reading
    Cassava is produced in a large quantity in Nigeria. One of the products emerging  from its processing has turned out to be a major staple food in the nation, which is ‘garri’.  Due to insufficient and inadequate processing equipment; cassava has been susceptible to  wastage and ‘garri’ production has been reduced in scale, thereby... Continue Reading
    ABSTRACT    The need for the Nigerian construction industry to move away from the traditional forms of project procurement and embrace project management services cannot be over emphasized.  This is as a result of the importance of capital projects to the development of a young nation.  This study investigated the impact of project management... Continue Reading
    Call Us
    whatsappWhatsApp Us