THE CONSTRUCTION OF SIEVE EQUIPMENT

  • Type: Project
  • Department: Mechanical Engineering
  • Project ID: MCE0136
  • Access Fee: ₦5,000 ($14)
  • Pages: 43 Pages
  • Format: Microsoft Word
  • Views: 942
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT

The sets of seizes with shocker which was fabricated and assembled in the chemical engineering pilot plant was aimed at providing the students with a machine that will aid them in practical involving the separation of solid particles. Besides this, it was also fabricated sizes or diameter of the solid particles of a substance by allowing it pass through the pores or aperture of the sieve plates.
The process of operation involved the following: marking out of the sieve plate using dimension of 135mm and the shaker basing with dimension 2.4mm on the corrugated iron sheet using a scriber and a steel rule; punching of the market out line using hammer and chisel, cutting of the punched path of the sieve using guillotine, but in the case of the sieve mesh a Shearer was used in the cutting; folding of the corrugated iron using folding machine; drilling of the four holes using drilling machine, welding of the sieve plate and the handles using oxyacetylure flame; filling of the holes on the welded edges with a c-per body  filler; smoothening of the sieve plate using sandpaper and lastly the painting and sun drying of the sieve plate using an oil paint.
The shaker base with the dimensions 2.4mm by 1.8mm was fabricated to house the motor, which comprised of a rotor, stator and coil and a capacitor of 2700 coulomb. 
In the end, all the parts were assembled and a sieve equipment of commendable and a sieve equipment of commendable efficiency was fabricated with the specified dimensions mentioned above and a regulator.


TABLE OF CONTENT

Title page
Dedication
Acknowledgement
Letter of transmittal 
Abstract 

CHAPTER ONE 
Introduction 

CHAPTER TWO 
LITERATURE REVIEW 
2.1History of sieve 
2.2Definition of sieve 
2.3Screen surfaces 
2.4Types of screens 
2.5Screens analysis 
2.6Materials for construction 
2.7Selection of materials for construction 
2.8Sieve scale.

CHAPTER THREE 
3.1Constructional procedure 
3.2Safety precautions 

CHAPTER FOUR 
Discussion 

CHAPTER FIVE 
5.1Conclusion and Recommendation 
5.2References 
Appendix 

THE CONSTRUCTION OF SIEVE EQUIPMENT
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Mechanical Engineering
  • Project ID: MCE0136
  • Access Fee: ₦5,000 ($14)
  • Pages: 43 Pages
  • Format: Microsoft Word
  • Views: 942
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Mechanical Engineering
    Project ID MCE0136
    Fee ₦5,000 ($14)
    No of Pages 43 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT The sets of seizes with shaker which was fabricated and assembled in the Chemical Engineering pilot plant was aimed at providing the students with a machine that will aid them in practical involving the separation of solid particles, besides, this, it was also fabricated sizes or diameter of the solid particles of a substances by allowed... Continue Reading
    THE CONSTRUCTION OF SIEVE ANALYSIS EQUIPMENT ABSTRACT The sets of seizes with shaker which was fabricated and assembled in the Chemical Engineering pilot plant was aimed at providing the students with a machine that will aid them in practical involving the separation of solid particles, besides, this, it was also fabricated sizes or diameter of... Continue Reading
    ABSTRACT The construction of Sieve Industrial Sieve Compartment was carried out in the Engineering Workshop, Institute of Management and Technology, Enugu. The aim of this project is to fabricate an industrial sieve compartment which is capable of separating solid particles of various sizes. The... Continue Reading
    ABSTRACT The construction of Sieve Industrial Sieve Compartment was carried out in the Engineering Workshop, Institute of Management and Technology, Enugu. The aim of this project is to fabricate an industrial sieve compartment which is capable of separating solid particles of... Continue Reading
    Cassava is produced in a large quantity in Nigeria. One of the products emerging  from its processing has turned out to be a major staple food in the nation, which is ‘garri’.  Due to insufficient and inadequate processing equipment; cassava has been susceptible to  wastage and ‘garri’ production has been reduced in scale, thereby... Continue Reading
    Cassava is produced in a large quantity in Nigeria. One of the products emerging  from its processing has turned out to be a major staple food in the nation, which is ‘garri’.  Due to insufficient and inadequate processing equipment; cassava has been susceptible to  wastage and ‘garri’ production has been reduced in scale, thereby... Continue Reading
    ABSTRACT The motive of this project is to construct equipment for deodorizing kerosene, hence the smell of kerosene is totally eradicated. The equipment was constructed with flat sheet plates of a desired standard, the dimension and the truncated parts were coupled and welded in order to fasten the parts together. The material was selected to... Continue Reading
    ABSTRACT The motive of this project is to construct  equipment for deodorizing kerosene, hence the smell of kerosene is totally eradicated. The equipment was constructed with flat sheet plates of a desired standard, the dimension and the truncated parts were coupled and welded in order to fasten the parts together.  The material was selected to... Continue Reading
    ABSTRACT This project is on construction of size reduction equipment – manual grinder. It was constructed locally with the use of local materials and tools in I.M.T mechanical Engineering workshop. The various parts of the equipment were constructed separately using mild steel before finally coupled.... Continue Reading
    ABSTRACT Insulation deterioration occurs on power system when insulators are subjected to abnormal stresses. Since insulators cannot resist indefinite amount of energy, with enough voltage applied, any insulating material will eventually succumb to the electrical pressure and electron flow will occur and once current is forced through an... Continue Reading
    Call Us
    whatsappWhatsApp Us