CONSTRUCTION OF A BLENDER

  • Type: Project
  • Department: Chemical Engineering
  • Project ID: CNG0402
  • Access Fee: ₦5,000 ($14)
  • Pages: 51 Pages
  • Format: Microsoft Word
  • Views: 518
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT

Blender is an electric machine for size reducing soft food or liquid mixture.  Blender is some time called liquidizer consists of a glass jar or jug containing a steel blade assembly at the base driven by a small electric motor.
Construction of blender was done based on the principle of size of reduction using electric motor as the major driver force.  During the construction of blender, we adopted different stages which includes:
i.  The production of preliminary drawings with details and dimensioned sketches.
ii. Choosing of design and materials used in the construction.
iii.Construction and fabrication of all the component of the blender which includes blender container, shires, blade and the motor, all these was coupled together.
iv. Examination and testing of the performance and efficiency of the machine.
After strictly adopting the aforementioned stages, a well structured blender made of steel (stainless & mild) was obtained as the end product.  Also, for effectiveness of the size reducing action, the steel blade was sharpened and also the number of the blade was increased.  Actually, the material selected for this project has reduced the cost of painting and it is found to be anti corrosion due to the high degree of chromium contents and other alloy.
The main object of this project which is to be able to fabricate the component using the primary tool in the mechanical workshop was achieved after all the difficulties uncounted during the construction of blender.
The project construction of blender in relation to materials for construction costed N22,000. Comparing this with the price of normal domestic blender, can be seen to be extremely high.  This high is due to the material of construction and fabrication processes.
In considering all the resources channeled towards the construction, it can be rightly stated that the machine is economical in relation to materials used in the construction and the performance of the machine after construction.

TABLE OF CONTENTS
Title page
Letter of transmittal
Approval page
Dedication
Acknowledgement
Abstract
Table of content 

CHAPTER OF ONE:
INTRODUCTION

CHAPTER TWO:
LITERATURE REVIEW
2.1  Origin of blender as a size reduction equipment
2.2  Mechanisms of size reduction
2.3  Energy for size reduction
2.3.1Energy utilization
2.4  Behaviour of material in size reduction process
2.5  Size reduction equipment
2.6  Modes of operation
2.7  Nature of the material to be crushed
2.8  Importance of size reduction
2.9  Reasons for selection of stainless steel
2.10 Maintenance of blender and use
2.11 Material selection for construction
2.12 Commonly used materials of construction

CHAPTER THREE:
CONSTRUCTIONAL PROCEDURE

CHAPTER FOUR:
DISCUSSION

CHAPTER FIVE:
CONCLUSION/RECOMMENDATION

CHAPTER SIX:
REFERENCES

CONSTRUCTION OF A BLENDER
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Chemical Engineering
  • Project ID: CNG0402
  • Access Fee: ₦5,000 ($14)
  • Pages: 51 Pages
  • Format: Microsoft Word
  • Views: 518
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Chemical Engineering
    Project ID CNG0402
    Fee ₦5,000 ($14)
    No of Pages 51 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT Blender is an electric machine for size reducing soft food or liquid mixture. Blender is some time called liquidizer consists of a glass jar or jug containing a steel blade assembly at the base driven by a small electric motor. Construction of blender was done based on the principle of size of reduction using... Continue Reading
    CHAPTER ONE 1.0 INTRODUCTION 1.1 BACKGROUND OF THE STUDY The growing need for construction of all types coupled with a tight monetary supply has provided the construction industry with a big challenge to cut cost. Nigerian construction industry is faced... Continue Reading
    Construction industry in Nigeria had been a major source of employment for 70% of labour in the country, thus it controls the capital flow, as well as labour resources, which has cost implications. Adequate management of these resources is considered an important aspect of project works; so also if the resources are adequately harnessed, issues... Continue Reading
    ABSTRACT  Maintaining steady cost projection on construction projects had been until recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial Cost plan, had been prevalent on Construction sites. However, little or no efforts has made to curtail the phenomenon, it is against this background that... Continue Reading
    ABSTRACT Construction Management is the art of directing and coordinating human and material resources throughout the life of a construction project by using modern construction management techniques to achieve predetermined objectives of scope, cost, time, and quality and participation satisfaction. Project management in construction encompasses... Continue Reading
    ABSTRACT Construction Management is the art of directing and coordinating human and material resources throughout the life of a construction project by using modern construction management techniques to achieve predetermined objectives of scope, cost, time, and quality and participation satisfaction. Project management in construction encompasses... Continue Reading
    ABSTRACT  Construction Management is the art of directing and coordinating human and material resources throughout the life of a construction project by using modern construction management techniques to achieve predetermined objectives of scope, cost, time, and quality and participation satisfaction. Project management in construction... Continue Reading
    ABSTRACT The aim of the study was to examine risk factors in accidents at construction sites at the Northern Region of Ghana. The research approach used for this study is quantitative approach. The study population consisted of site managers and project managers. Questionnaire and interview guide were used to gather primary data. Statistical... Continue Reading
    ABSTRACT The aim of the study was to examine risk factors in accidents at construction sites at the Northern Region of Ghana. The research approach used for this study is quantitative approach. The study population consisted of site managers and project managers. Questionnaire and interview guide were used to gather primary data. Statistical... Continue Reading
    ABSTRACT The construction is one of the oldest industries in almost every nation. Its importance made it possible for undeveloped countries to rise up to becoming developed Countries. Lately, there have been an undesirable adherence to performance specification in most construction sites in most developing countries. This study seeks to reveal how... Continue Reading
    Call Us
    whatsappWhatsApp Us