ABSTRACT

One of the major problems facing the country is pavement failure. It is the concern of the Institute of Management and Technology (IMT) authorities to carryout a case study of pavement failure along Hillview off ESBS Road Enugu.
The investigation show that the pavement failed both structural and functionally taking into consideration.
The possible cause cure:-
(a)Poor sub-grade & sub-base
(b)Lack of maintenance culture
(c)Poor drainage system 
(d)Poor workmanship
(e)Inaccurate 

TABLE OF CONTENTS
Approval Page
Dedication
Acknowledgement 
Abstract 
Table of Contents 

CHAPTER ONE
1.1  Introduction 
1.2  Literature Review
1.3  Pavement Definition
1.4  Types of Road pavement 
1.5  Advantages and Disadvantages of Flexible & Rigid Pavement 
1.6  Functions and Pants Pavement 
1.7  Sub – Grade
1.8  Sub – Base
1.9  Base
1.10 Wearing Course
1.11 Pavement Failure
1.12 Rutting 
1.13 Corrugation 
1.14 Revealing 
1.15 Flushing
1.16 Aligagator Cracking 
1.17 Longitudinal Cracking

CHAPTER TWO
CAUSES OF PAVEMENT FAILURES ALONG HILLVIEW OFF ESBS ROAD
2.1  Traffic Intensity
2.2  Improper Drainage System
2.3  Unskilled Manpower 
2.4  Improper Compaction 
2.5  Much Clay
Effects of Pavement Failure
2.6  Accident
2.7  Maintenance Cost 
     Traffic Holdup 

CHAPTER THREE
3.1  Importance of Soil Test In Pavement  Design
3.2  Mechanical Analysis Test
3.3  Standard Compaction Test
3.4  Carliform Bearing Ration
3.5  Alterberg Limit Test
3.6  Liquid Limit & Plastic Limit

CHAPTER FOUR
Description Method and Result of Test
4.1  Compaction Test
4.2  Carliform Bearing Ratio
4.3  Mechanical Analysis Test
4.4  Alterberg Limit Test

CHAPTER FIVE
5.1  Improvement on the Pavement Failure
5.2  Recommendation
5.3  General Conclusion 

INVESTIGATION ON THE CAUSES OF PAVEMENT FAILURE ALONG HILLVIEW OFF ESBS ROAD ENUGU
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0074
  • Access Fee: ₦5,000 ($14)
  • Pages: 41 Pages
  • Format: Microsoft Word
  • Views: 1.3K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Civil Engineering
    Project ID CVE0074
    Fee ₦5,000 ($14)
    No of Pages 41 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT This project focuses on investigation into the causes and Remedial measures of pavement failure at Ganmon-Afon road Kwara State. The measuring of pavement and types of pavement. Types of pavement failures causes of pavement were studied and possible solution were provided. Form the investigation causes of pavement failure were identified... Continue Reading
    ABSTRACT One of the major problems facing the country is pavement failure. It is the concern of the Institute of Management and Technology (IMT) authorities to carryout a case study of pavement failure along Hillview off ESBS Road Enugu. The investigation show that the pavement failed both structural and functionally taking into consideration. The... Continue Reading
    ROUTE SURVEY OF ROAD AND PAVEMENT DESIGN (REHABILITATION/MODERNIZATION) CASE STUDY: ROAD LINKING FEDERAL SECRETARIAT INDUSTRIAL CENTRE AND MASS COMMUNICATION DEPARTMENT (IMT CAMPUS III), ENUGU ABSTRACT The study cover a view and a detailed explanation of the modification required to be carried out on the main access road linkage of the Campus III... Continue Reading
      ABSTRACT This thesis on a project undertaken by the author is aimed at providing explanation of the basic theory of the work of road design and its associated activities also, to cover practical methods of working. In pursuit of the meaningful completion this project a lot of investigation was embarked with principles and practice of road... Continue Reading
    ABSTRACT This thesis on a project undertaken by the author is aimed at providing explanation of the basic theory of the  work of road design and its associated activities also, to cover practical methods of working. In pursuit of the meaningful completion this project a lot of investigation was embarked with principles and practice of road... Continue Reading
    ABSTRACT This thesis on a project undertaken by the author is aimed at providing explanation of the basic theory of the work of road design and its associated activities also, to cover practical methods of working. In pursuit of the meaningful completion this project a lot of investigation was embarked with principles and practice of road... Continue Reading
    ABSTRACT  The project covers a view and detailed explanation of the route survey which in chider reconnaissance surrey, theologize traversing and levelling operation as well as soil tests which includes compaction test, mechanical analysis, plastic and liquid limits and CBR test. The project also covers the design of pavement   and the geometric... Continue Reading
    BASIC SOIL TEST ON SUB-GRADE SOIL MATERIAL & FLEXIBLE PAVEMENT DESIGN ON ROAD LINKING – UGWUAJI AND CAMPUS M, IMT; ENUGU, ENUGU STATE PREFACE This case study is an existing pathway or fort path linking Ugwuji and Campus 111 (IMT) for a proposed road construction by the government of Enugu State. This project encloses the following - The... Continue Reading
    PREFACE This case study is an existing pathway or fort path linking Ugwuji and Campus 111 (IMT) for a proposed road construction by the government of Enugu State. This project encloses the following  -The condition of the existing sub-grade and its suitability for use as a good sub-grade soil material by processes of different lab test. -Using... Continue Reading
    ABSTRACT The study cover a view and a detailed explanation of the modification required to be carried out on the main access road linkage of the Campus III Industrial center from federal Secretariat to Mass Communication Department of the Institution in order to update its services and functions. The need for easing the flow of traffic on this... Continue Reading
    Call Us
    whatsappWhatsApp Us