ASSESSMENT OF THE TECHNOLOGY CHOICES FOR RURAL ROAD CONSTRUCTION (A CASE STUDY OF OTUKE AND ALEBTONG DISTRICTS)

  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0148
  • Access Fee: ₦5,000 ($14)
  • Pages: 91 Pages
  • Format: Microsoft Word
  • Views: 372
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

Rural roads constitute about 65% of the Uganda road network, which provide a critical link in the road transport network, facilitating access to and development of the rural areas. Traffic volume on rural roads in Uganda is very low, 90 % of the rural road network has an Average Annual Daily Traffic (AADT) less than 200, with an average road width of about 5.0 meters.  The main problem facing the development of rural roads lies in the method of construction. Common methods used include Equipment Based Technology (EBT) and Labour Based Technology (LBT). However, there are inevitable doubts, as to the feasibility of the labour based methods. Whereas EBT is acknowledged to be able to deliver quick results, it is also very frustrating, inefficient and unproductive for constraints such as specialized and dedicated function and inter-linked equipment. This report aimed to compare the use of labour based and equipment-based methods for rural roads construction. The study examined the performance of the two technologies used in the construction and maintenance of rural roads.  

ASSESSMENT OF THE TECHNOLOGY CHOICES FOR RURAL ROAD CONSTRUCTION (A CASE STUDY OF OTUKE AND ALEBTONG DISTRICTS)
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0148
  • Access Fee: ₦5,000 ($14)
  • Pages: 91 Pages
  • Format: Microsoft Word
  • Views: 372
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Civil Engineering
    Project ID CVE0148
    Fee ₦5,000 ($14)
    No of Pages 91 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT Rural roads constitute about 65% of the Uganda road network, which provide a critical link in the road transport network, facilitating access to and development of the rural areas. Traffic volume on rural roads in Uganda is very low, 90 % of the rural road network has an Average Annual Daily Traffic (AADT) less than 200, with an average... Continue Reading
    ABSTRACT Rural roads constitute about 65% of the Uganda road network, which provide a critical link in the road transport network, facilitating access to and development of the rural areas. Traffic volume on rural roads in Uganda is very low, 90 % of the rural road network has an Average Annual Daily Traffic (AADT) less than 200, with an average... Continue Reading
    TABLE OF CONTENT Title page                                                                       i Certification                                                                   ii... Continue Reading
    ABSTRACT This was undertaken to find out the effects pf teacher effectiveness on pupils' performance at PLE in Omarari coordinating centre, Omoro sub county, Alebtong District. This case study was carried out in four selected primary schools out of the twenty primary schools in Omoro Sub-county, these schools were selected due to their being... Continue Reading
    ABSTRACT The project works tends to analyse the environmental impact Assessment of construction works, a case study of the road construction in Oke-Onigbin via Isin LGA of kwara state. Chapter one introduce the topic and the aim and objective, chapter two states the review of related literatures and various effects of construction work and methods... Continue Reading
    Table of Contents DECLARATION.........................................................................................................................i SUPERVISOR’S APPROVAL ................................................................................................... ii... Continue Reading
    The study investigated budgetary controls and performance of Roko Construction Company in Nasser road Kampala, Uganda, it was guided by the following objectives which included determining the effect of monitoring on performance, to identify the effect of evaluation on performance, and to establish the effect of Planning on performance. The study... Continue Reading
    ABSTRACT This research work, the developmental impact of rural banking in Nigeria, a case study of United Bank of Africa (UBA) PLC Agbani Road Branch, Enugu was carried out to measure to what extent the rural commercial banks have been able to involve the inhabitant of the rural areas in economic activities and how successful the bank are... Continue Reading
    ABSTRACT This research work, the developmental impact of rural banking in Nigeria, a case study of United Bank of Africa (UBA) PLC Agbani Road Branch, Enugu was carried out to measure to what extent the rural commercial banks have been able to involve the inhabitant of the rural areas in economic activities and how successful the bank are... Continue Reading
    ABSTRACT Every modern organization uses Information and Communication Technology (ICT) to capture, transmit, store, retrieve, manipulate and report information used in business processes. In most organization particularly medium and large size one. Information and Communication Technology needs are met through grant information systems. More... Continue Reading
    Call Us
    whatsappWhatsApp Us