ASSESSMENT OF SEDIMENTATION LEVEL USING REMOTE SENSING AND GIS IN KIIRA DAM, JINJA DISTRICT UGANDA

  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0153
  • Access Fee: ₦5,000 ($14)
  • Pages: 45 Pages
  • Format: Microsoft Word
  • Views: 728
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

TABLE OF CONTENT

DECLARATION...........................................................................................................i

CERTIFICATION........................................................................................................ii

ACKNOWLEDGEMENT .............................................................................................. iii

TABLE OF CONTENT ................................................................................................iv

ABSTRACT...............................................................................................................ix

CHAPTER ONE: INTRODUCTION................................................................................1

1.1 BACKGROUND .................................................................................................1

1.1.1 Studies carried out globally.........................................................................1

1.1.2 Studies carried out in Uganda.....................................................................2

1.2 Problem statement...........................................................................................4

1.3 Significance of the project ................................................................................4

1.4 Project objective ..............................................................................................4

1.4.1 Specific objectives .....................................................................................5

1.5 Scope of the project.........................................................................................5

CHAPTER TWO: LITERATURE REVIEW .......................................................................6

2.1 Introduction ....................................................................................................6

2.2 Impacts of Sedimentation in Reservoirs.............................................................7

2.3 Causes of Reservoir Sedimentation ...................................................................9

2.4 Impact of Change of Land Use on Erosion and Reservoir Sedimentation............10

2.5 Impact of Climate Change on Water Resources................................................12

2.6 Techniques of Sediment Removal from Reservoirs ...........................................13

v

2.7 Determination of Sediment Accumulation in Small Reservoirs ...........................15

2.8 Development of Dams in Uganda....................................................................17

CHAPTER THREE: METHODOLOGY ..........................................................................19

3.1 Data used......................................................................................................19

3.1.1 Digital Elevation Model (DEM) Data...........................................................19

3.1.2 Satellite Data...........................................................................................19

3.1.3 Field Data................................................................................................19

3.2 Delineating the watershed in which Kiira Dam belongs .....................................20

3.3 Analysis of Satellite Imageries.........................................................................20

3.4 Digital Image Processing for Delineation of Water and Land Boundary ..............20

3.4.1 Water Index (WI) Method ........................................................................20

3.5 Corrections in Vector Contours and Masks .......................................................21

3.6 Estimation of Cumulative Capacity ..................................................................22

3.7 Validation of the remote sensing data by ground trothing.................................22

CHAPTER FOUR: RESULTS AND DISCUSSION...........................................................23

4.1 Digital Elevation Model (DEM) Data.................................................................23

4.1.1 Watershed in which Kiira Dam belongs......................................................23

4.2 Satellite Data .................................................................................................24

4.3 Delineated Water and Land Boundary .............................................................25

4.4 Estimation of Cumulative Capacity ..................................................................27

4.5 Validation of the remote sensing data .............................................................29

CHAPTER FIVE: CONCLUSIONS AND RECOMMENDATIONS .......................................32

5.1 Conclusions ...................................................................................................32

5.2 Challenges.....................................................................................................32

vi

5.3 Recommendations .........................................................................................32

REFFERENCES ........................................................................................................33

ABSTRACT The Satellite Remote Sensing (SRS) method for assessment of reservoir sedimentation uses the fact that the water spread area of reservoir at reservoir boundaries keeps on increasing due to sedimentation. Remote Sensing technique gives directly the water spread area of the reservoir at a particular elevation on the date of pass of the satellite. This helps to estimate sedimentation over a period of time. This research project describes assessment of sedimentation carried out for the Kiira Reservoir using Remote Sensing satellite imageries. The area capacity curve of year the 2001, is used as a base for sedimentation assessment for the year 2010. The results of Remote Sensing survey for the period 2001 to 2010 are compared with the deposition pattern of Kiira Reservoir with the standard types of deposition pattern as per Area Reduction Method suggested by Borland and Miller. As per recent Remote Sensing survey of 2006 and 2010, it was observed that the original water spread area had increased to 4.82km2and 4.96km2 respectively i.e. by approximately 3.549% in 9 years. Thus, there is a gradual reduction in the capacity of Kiira reservoir. The validation process which involved collecting field data and incorporated with the remote sensing data gave an evidence of sedimentation in Kiira dam at the sample point locations as indicated the preceding chapters.

ASSESSMENT OF SEDIMENTATION LEVEL USING REMOTE SENSING AND GIS IN KIIRA DAM, JINJA DISTRICT UGANDA
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0153
  • Access Fee: ₦5,000 ($14)
  • Pages: 45 Pages
  • Format: Microsoft Word
  • Views: 728
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Civil Engineering
    Project ID CVE0153
    Fee ₦5,000 ($14)
    No of Pages 45 Pages
    Format Microsoft Word

    Related Works

    TABLE OF CONTENT DECLARATION...........................................................................................................i CERTIFICATION........................................................................................................ii ACKNOWLEDGEMENT... Continue Reading
    ABSTRACT The purpose of this research is to apply Remote Sensing and GIS in land use management of Greater Karu Urban Area, Nasarawa State. Specific objectives are to; create land use/cover map of the study area from 1972 to 2012, determine the rate and magnitude of change, determine the suitability of the land for different uses and determine the... Continue Reading
    ABSTRACT The land use/land cover of urhonigbe forest reserve between 1987 and 2015 was analyzed to determine the rate and nature of the land use change over time and their possible effect on the forest ecosystem of Urhonigbe Forest. Satellite Remote Sensing and GIS techniques was applied in monitoring Urhonigbe Forest Reserve in Edo State. The... Continue Reading
    ABSTRACT The aim of this study was to determine suitable sites for locating a landfill in Gweru city. The study also sought to analyze the social impacts of the current disposal site to the local residents. Interviews with the City of Gweru and EMA were used to get the results on the social impacts of the current disposal site. Questionnaires and... Continue Reading
    ABSTRACT This project is an attempt to study population distribution in Achara Layout Enugu, in Enugu State through integration of Remote sensing and Geographic Information System (GIS). The Remote sensing data used in this study included high spatial resolution Quick Bird imagery. Questionnaires were given out for use in generating the desired... Continue Reading
    ABSTRACT This project examines the use of GIS and Remote Sensing in mapping Land Use Land Cover in Ilorin between 1972 and 2001 so as to detect the changes that has taken place in this status between these periods. Subsequently, an attempt was made at projecting the observed land use land cover in the next 14 years. In achieving this, Land... Continue Reading
    ABSTRACT This project examines the use of GIS and Remote Sensing in mapping Land Use Land Cover in Ilorin between 1972 and 2001 so as to detect the changes that has taken place in this status between these periods. Subsequently, an attempt was made at projecting the observed land use land cover in the next 14 years. In achieving this, Land... Continue Reading
    TABLE OF CONTENTS DECLARATION ...................................................................................................... i APPROVAL ........................................................................................................... ii DEDICATION... Continue Reading
    ABSTRACT The main purpose of this study was to find out the causes of wetland degradation in Jinja District, Uganda. The study covered the awareness of the people on wetlands; the values of the ecosystems; and the impacts of wetland’ degradation, so as to come up with strategies for better management and conservation of the Lake Victoria... Continue Reading
    Abstract The study investigated the relationship between income inequality and economic development with a case study of Jinja Municipality in Eastern Uganda. The main purpose of the study was to evaluate the relationship between income inequality and economic development. The study reviewed data on Income inequality, gender and their relationship... Continue Reading
    Call Us
    whatsappWhatsApp Us