POWER OUTAGE IN NIGERIA

  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0003
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 51 Pages
  • Methodology: nil
  • Reference: YES
  • Format: Microsoft Word
  • Views: 3.5K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
POWER OUTAGE IN NIGERIA
ABSTRACT

This research work examines the factors affecting  power  outage in Nigeria.
Constants Power supply is the hallmark of a develop economy. Any nation whose energy need is epileptic in supply. Prolongs her development and risk-losing potential investors.
Nigeria with population of over 12 million people has for the past 40 years of establishment of National Electric Power Authority (NEPA)agency  empowered with the electricity generation, transmission and distribution, experience frequent  and persistent challenges and problems.
Presently the federal government has embarked on power  sector reforms with the aim of  improving the unpalatable scenario and in turn reduce the scope of monopoly control of the nations power industry. This work also look at the overall power sector reforms as well as evaluate the opportunities and challenges there and  while advocating introduction of management programme by Power Holding Company of Nigeria (PHCN?) a way of improving power supply .
 CHAPTER ONE
1.0                Introduction
1.1       Background of the Study
Constant Electricity Power  supply is the hallmark of National development with electric emerges the people  are  empowered to work  from the domestic level and the cottage  industries through and large scale  manufacturing complexes. In these days depriving  people of electric power is tan tantamount to risk of losing potential investors and also   prolong development.
 The Power generation can be  through one of the following sources  of energy coal, oil or natural gas, hydro power  (water turbine), nuclear power (stream  turbine), solar-wind or water wave  turbine, solar thermal generator, solar voltaic generator, coal, oil, gas and hydro Power are  abundant in Nigeria.
Presently  Nigeria Mostly employ gas fired and hydroelectric Power bring that oil is too expensive and coal-fired station have gone moribund the maximum Power  consumption or  peak demand depends on the population and industrialization of a country. If the maximum supply meets the peak demand there is a surplus otherwise there is a shortfall.
However, in Nigeria, the Power supply system is run with a shortfall as demand  tends to exceeds supply.
The power holding company of Nigeria (PHCN) is responsible for generating, transmitting distributing and sells electric power to various  consumers  across the country. A major objective of PHCN naturally has been  to provide  regular  and uninterrupted power supply to electricity consumer nationwide.
There has  been study of power supply  systems as well as various aspects of their  operations, however very few have investigates  and documented in learned journals  the counterpart (factor affecting) of the system in Nigeria. The establishment and the growth of electricity in Nigeria dates back as far as  1896 when it was first produce in Lagos,  fifteen years after its introduction in England (Niger. Power Review, 1985). The total capacity of the generation used then was  60KW. In other words the maximum demand in 1896 was less  than 60KW  and then in 1946 the Nigeria government  electricity undertaking was established under the jurisdiction of the responsibility of (PWD) to take  over the responsibility of electricity supply in Lagos  State.  And in 1950  a central body was established by the legislative council which transferred electricity supply and development of the care of the body known as the electricity corporation of Nigeria (ECN). Other bodies like native Authorities and the Nigerian Electricity  Supply Company (NESCO) had  licenses  to produced  electricity in some locations in Nigeria.
Another body known as Niger Dams Authority (NDA) which was established by an  Act of parliament the Authority was responsible for the construction and maintenance of dams  and other works on the River Niger  and elsewhere  generating  electricity by means of water Power, improving  navigation and promoting  fish brines and irrigation the electricity produced by NDA was bold  to ECN for distribution and sales at unity voltage.
In April 1972, the operation of ECN/NDA were merged in anew organization known as the National Electric Power Authority (NEPA) since ECN  was mainly responsible for distribution and sales and NDA was created to build and run-generating station and transmission lines, the primary aim for merging the organization were  (Niger Power Review 1989)
The capacity in Kilowatt generated by each of the generating system inv various part of the country (Nigeria) has also been studied. The work which also examined the Nigerian Electricity marked and found that the annual growth rate of electricity average about 18 percent  still had low electricity consumption of 60KWH capita (1979 figure) which is less than 1 percent of industrialized countries. The work however pointed out that the low consumption capita in Nigeria is due to the fact that over 80 percent of the population normally resides  in the rural area where they have no access to electricity as well as low level of industrialization.
The solar and wind  energy resource in Nigeria was  investigated  and found that the annual mean of solar meter square  and global radiation is as high as 24mj per meter squared per day due to it good  geographical location latitude 4 degree and 14 degree north of the equator. Nigeria’s Power Company-Power Holding Company of Nigeria has an  installed  generating capacity of about 6GW but actual available output is less than 2.5GW Power  outage (black out) is frequent.
1.2       Aims and Objectives of the Study
 This Paper looks into some recent major Power  outage in Nigeria and adequate examined the root causes and dynamic of this problem and possible recommendations for possible solution.
1.3              Significance of the Study
Electricity as a source of energy is vital to the growth and development of any economy. Its  significance arises from the impact it  has on infrastructure, a range of socio-economic activities and consequently on the country’s  standard of living. This means that transportation, communication, construction, and  other facilities   depend on electricity to function effectively. Electricity has continued  to play a significance role in the development process. In the Nigerian situation the reverse appears to be the case  because Power  outages have continued to affect the country’s  development. Some have argued that  privatizing  electricity  supply through   the unbundling of power generation arm of National Electric Power  Authority (NEPA) Now  Power Holding Company of Nigeria (PHCN) will ensure  its  efficiency . Despite this reform, electricity supply I still rationed to the consumers  in ways that are still grossly inadequate.

POWER OUTAGE IN NIGERIA
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0003
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 51 Pages
  • Methodology: nil
  • Reference: YES
  • Format: Microsoft Word
  • Views: 3.5K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Electrical Engineering
    Project ID ELE0003
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 51 Pages
    Methodology nil
    Reference YES
    Format Microsoft Word

    Related Works

    ABSTRACT This work analysed the current state of power system in Nigeria with emphasis on distribution system using Akwa Ibom Distribution System as a case study. The components of the study system were analyzed. This work adopted the analytical and simulation approach to reliability and stability assessment. Analysing the system the way it is... Continue Reading
    ABSTRACT This work analysed the current state of power system in Nigeria with emphasis on distribution system using Akwa Ibom Distribution System as a case study. The components of the study system were analyzed. This work adopted the analytical and simulation approach to reliability and stability assessment. Analysing the system the way it is... Continue Reading
    ABSTRACT This research work examines the factors affecting power outage in Nigeria. Constants Power supply is the hallmark of a develop economy. Any nation whose energy need is epileptic in supply prolongs her development and risk-losing potential investors. Nigeria with population of over 120 million... Continue Reading
    ABSTRACT This research work examines the factors affecting  power  outage in Nigeria. Constants Power supply is the hallmark of a develop economy. Any nation whose energy need is epileptic in supply prolongs her development and risk-losing potential investors. Nigeria with population of over 120 million... Continue Reading
    ABSTRACT This research work examines the factors affecting  power  outage in Nigeria. Constants Power supply is the hallmark of a develop economy. Any nation whose energy need is epileptic in supply prolongs her development and risk-losing potential investors. Nigeria with population of over 120 million people has for the past 40 years of... Continue Reading
    Chapter One 1. Introduction World Bank (1991:31) defined development as “a sustainable increase in living standard that encompasses material consumption, education, health and environmental protection”. Social scientists, particularly economists and sociologists, have for centuries been preoccupied with the subject matter of development. The... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1     BACKGROUND OF THE STUDY         Electricity is a significant component of virtually any production process. As such, limited supply has the potential to, directly and/or indirectly, affect the economic activities of firms. In documenting such a crucial economic role of energy, a common approach in the... Continue Reading
    ABSTRACT This work is a power supply monitoring device that triggers a buzzer when the mains supply cuts off. Thus a diode (bridge rectifier diode) was used to convert the AC voltage to DC voltage and the 240v/12v AC mains power transfer was used with a bridge rectifier for rectification and a 470Nf filter capacitor C1 for the smoothing of the... Continue Reading
    ABSTRACT This work is a power supply monitoring device that triggers a buzzer when the mains supply cuts off. Thus a diode (bridge rectifier diode) was used to convert the AC voltage to DC voltage and the 240v/12v AC mains power transfer was used with a bridge rectifier for rectification and a 470Nf filter capacitor C1 for the smoothing of the... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1       Background of the study Nigeria is hugely endowed with energy resources that include oil, natural gas, coal, biomass, solar, wind and hydro resources among others (Iwayemi, 2008; Onuaha, 2010). However despite this huge endowment Nigeria is also an energy deficient country whose economy suffers tremendously... Continue Reading
    Call Us
    whatsappWhatsApp Us