MINIMIZING ELECTRICAL POWER OUTAGE IN AKWA-IBOM STATE - A PANACEA TO POOR POWER SYSTEM RELIABILITY

  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0303
  • Access Fee: ₦5,000 ($14)
  • Pages: 78 Pages
  • Format: Microsoft Word
  • Views: 491
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT This work analysed the current state of power system in Nigeria with emphasis on distribution system using Akwa Ibom Distribution System as a case study. The components of the study system were analyzed. This work adopted the analytical and simulation approach to reliability and stability assessment. Analysing the system the way it is shows that the system was not reliable and stable. The outcome gotten from the base state of the system confirmed this. The results for the current state of the system showed high values for System Average Interruption Frequency Index (SAIFI) (2.8879 fr/syst.cust.), SAIDI (16.7877 hr/syst.cust) and CAIDI (9.1770 hr/cust.), ENS (20,430 kWhr). Improvement with breaker in the 33kv feeders presented a better set of indices than the Base Case indices while combination with hydro power plant presented the best set of indices: (SAIFI) (1.0987 fr/syst.cust.), SAIDI (7.4205 hr/syst.cust) and CAIDI (3.7721 hr/cust.), ENS (7,746kWhr). In conclusion, including various breakers, relays, isolators and hydro power plant to the Akwa Ibom state distribution system will improve the outage thereby serving as a panacea to power stability in Nigeria.  

 

MINIMIZING ELECTRICAL POWER OUTAGE IN AKWA-IBOM STATE - A PANACEA TO POOR POWER SYSTEM RELIABILITY
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0303
  • Access Fee: ₦5,000 ($14)
  • Pages: 78 Pages
  • Format: Microsoft Word
  • Views: 491
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Electrical Engineering
    Project ID ELE0303
    Fee ₦5,000 ($14)
    No of Pages 78 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT This work analysed the current state of power system in Nigeria with emphasis on distribution system using Akwa Ibom Distribution System as a case study. The components of the study system were analyzed. This work adopted the analytical and simulation approach to reliability and stability assessment. Analysing the system the way it is... Continue Reading
    ABSTRACT This work analysed the current state of power system in Nigeria with emphasis on distribution system using Akwa Ibom Distribution System as a case study. The components of the study system were analyzed. This work adopted the analytical and simulation approach to reliability and stability assessment. Analysing the system the way it is... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1       Background of the study Nigeria is hugely endowed with energy resources that include oil, natural gas, coal, biomass, solar, wind and hydro resources among others (Iwayemi, 2008; Onuaha, 2010). However despite this huge endowment Nigeria is also an energy deficient country whose economy suffers tremendously... Continue Reading
    ABSTRACT This project work is aimed at developing an efficient Algorithm for the management of Electric Power network using fuzzy logic. The fuzzy logic model functions as a system operator in making decision for load shedding and transfer switching. The new technique uses the system data frequency variation, load variation and voltage variation... Continue Reading
    CHAPTER ONE GENERAL INTRODUCTION 1.1                      INTRODUCTION The importance of electricity in the higher institutions of learning cannot be overemphasized. However, Electrical Power Generation in many universities in Nigeria is self generated by the institutions as the... Continue Reading
    ABSTRACT Electricity companies typically possess numerous units and they need to commit unit because electricity cannot be stored in a large-scale system and demand is a random variable process fluctuating with the time of the day and the day of the week. A problem that must be frequently resolved by electricity utility is to economically... Continue Reading
    ABSTRACT Electricity companies typically possess numerous units and they need to commit unit because electricity cannot be stored in a large-scale system and demand is a random variable process fluctuating with the time of the day and the day of the week. A problem that must be frequently resolved by electricity utility is to economically... Continue Reading
    ABSTRACT This research work examines the factors affecting power outage in Nigeria. Constants Power supply is the hallmark of a develop economy. Any nation whose energy need is epileptic in supply. Prolongs her development and risk-losing potential investors. Nigeria with population of over 12 million people has for the... Continue Reading
    ABSTRACT This work is a power supply monitoring device that triggers a buzzer when the mains supply cuts off. Thus a diode (bridge rectifier diode) was used to convert the AC voltage to DC voltage and the 240v/12v AC mains power transfer was used with a bridge rectifier for rectification and a 470Nf filter capacitor C1 for the smoothing of the... Continue Reading
    ABSTRACT This work is a power supply monitoring device that triggers a buzzer when the mains supply cuts off. Thus a diode (bridge rectifier diode) was used to convert the AC voltage to DC voltage and the 240v/12v AC mains power transfer was used with a bridge rectifier for rectification and a 470Nf filter capacitor C1 for the smoothing of the... Continue Reading
    Call Us
    whatsappWhatsApp Us