ABSTRACT
Electricity companies typically possess numerous units and they need to commit unit because electricity cannot be stored in a large-scale system and demand is a random variable process fluctuating with the time of the day and the day of the week. A problem that must be frequently resolved by electricity utility is to economically determine a schedule of what units will be used to meet the forecasted demand, and satisfy operating constraints. Lagrangian multiplier method is one of the techniques based on equal Incremental Cost of fuel input for the units in operation. It is helpful for the optimum load sharing among units, with satisfying constraints under different environment. Simulation algorithm is prepared in this paper and simulation is done with Matlab for standard set of Units. Different Incremental Cost values are extracted for different load demands and their Optimized Incremental Cost and load sharing values are found.


TABLE OF CONTENT
Title Page .............i
Certification .........ii
Approval page .....iii
Dedication ............iv
Acknowledgement ......................v
Abstract ...............vi
Table of Content vii
List of figures...... ix
List of tables .........x

CHAPTER ONE: INTRODUCTION
(1.1)      Background of the study .(1)
(1.2)       Statement of the problem ..................(2)
(1.3)       Aim and Objectives of the study ..............(2)
(1.4)       Significance of the study (3)
(1.5)       Scope of the study ..........(3)
(1.6)      Organisation of the project .(3)

CHAPTER TWO: LITERATURE REVIEW
(2.1) History of Power System Optimization ......(4)
(2.2) Economic Loading.............(5)
(2.3) Optimization .....................(6)
(2.4) Electric Energy Generation .(7)
(2.5) Electric Generator ..........(12)
(2.6) System Cost In Power Generation ...........(13)
(2.7) System Load ...................(13)
(2.8) System Reserve ..............(16)
(2.9) System Reliability ..........(17)

CHAPTER THREE: METHODOLOGY
(3.1) Optimization Technique .(18)
(3.1.1) Linear Programming ....(18)
(3.1.2) Non Linear programming ......................(23)
(3.1.3) Stochastic programming .(25)
(3.2) Objective function ..........(27)
(3.3) Constraint Optimization (30)

CHAPTER FOUR: SYSTEM SIMULATION IMPLEMENTATION AND ANALYSIS
(4.1) Problem formulation ......(34)
(4.2) Economic dispatch problem ..................(37)
(4.2.1) Generating Station Without Loss and no Generating limit ................(37)
(4.2.2) Net saving in fuel cost for the Economic optimal scheduling as compared to equal distribution of the same load .....................(41)
(4.2.3) Generating Station required to supply a single load demand with three generators and different generation limit .............(44)
(4.2.4) Generating Station required to supply different values of load demand with different generating limits ................(49)

CHAPTER FIVE CONCLUSION AND RECOMMENDATION
(5.1) Conclusion ....................(53)
(5.2) Recommendation ...........(53)
REFERENCE .(54)

LIST OF FIGURES
Fig 2.1 Thermal Power Station ..(11)
Fig 2.2 Daily Load Curve of a Power System ..(15)
Fig 2.3 Load Curve / Load Duration Curve of a Power System .....................(16)
 
LIST OF TABLES
Table 4.4    Optimal economic loading of a generating station required to supply different values of load demand with different generating limits ................(53)
Table 4.3    Generating station required to supply a single load demand with three generators and different generating limit......................(49)
Table 4.2    Generator net saving in fuel cost in Naira per hour for the economic optimal scheduling of the same total load of 500MW as compared to equal distribution of the load between the two units....................(45)
Table 4.1    economic dispatch of a generating station without loss and no    generating limit .(41)
ANALYSIS OF OPTIMUM ECONOMIC LOADING IN AN ELECTRICAL POWER SYSTEM
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0376
  • Access Fee: ₦5,000 ($14)
  • Pages: 56 Pages
  • Format: Microsoft Word
  • Views: 587
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Electrical Engineering
    Project ID ELE0376
    Fee ₦5,000 ($14)
    No of Pages 56 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT This report is on stability study in electrical power system. The ability of an electric power system to reestablish the initial state (or one practically identical) after any disturbance manifested as a deviation from the initial parameter values for the system’s operation. The electric power sources in a power system are usually... Continue Reading
    ABSTRACT This work analysed the current state of power system in Nigeria with emphasis on distribution system using Akwa Ibom Distribution System as a case study. The components of the study system were analyzed. This work adopted the analytical and simulation approach to reliability and stability assessment. Analysing the system the way it is... Continue Reading
    ABSTRACT This work analysed the current state of power system in Nigeria with emphasis on distribution system using Akwa Ibom Distribution System as a case study. The components of the study system were analyzed. This work adopted the analytical and simulation approach to reliability and stability assessment. Analysing the system the way it is... Continue Reading
    CHAPTER ONE GENERAL INTRODUCTION 1.1                      INTRODUCTION The importance of electricity in the higher institutions of learning cannot be overemphasized. However, Electrical Power Generation in many universities in Nigeria is self generated by the institutions as the... Continue Reading
    CHAPTER ONE GENERAL INTRODUCTION Introduction This chapter presents the introduction to the study. It presents that theoretical background, statement of the problem, aim and objectives of the study, significance of the study, scope of the study, organization of the research and definition of terms. The use of computer (information technology) in... Continue Reading
    ABSTRACT This project work is aimed at developing an efficient Algorithm for the management of Electric Power network using fuzzy logic. The fuzzy logic model functions as a system operator in making decision for load shedding and transfer switching. The new technique uses the system data frequency variation, load variation and voltage variation... Continue Reading
    ABSTRACT Electrical power project like most of the construction projects are complex, dynamic, unique and prone to uncertainties, hence pose challenges even to the best of the project managers. The project team faces unprecedented changes in addition to constraints of budgets, time and quality. Review of literature reveals diverging opinions as to... Continue Reading
      TABLE OF CONTENTS DECLARATION    i DEDICATION    ii COPYRIGHT    iii ACKNOWLEDGEMENTS    iv ABSTRACT    v LIST OF TABLES    vii LIST OF FIGURES    viii LIST OF ACCRONYMS AND ABBREVIATIONS    ix OPERATIONAL DEFINITION OF TERMS    x INTRODUCTION    1 1.0 Background of the Study    1 1.2 Solar Power System    2... Continue Reading
      TABLE OF CONTENTS DECLARATION i DEDICATION ii COPYRIGHT iii ACKNOWLEDGEMENTS iv ABSTRACT v LIST OF TABLES vii LIST OF FIGURES viii LIST OF ACCRONYMS AND ABBREVIATIONS ix OPERATIONAL DEFINITION OF TERMS x INTRODUCTION 1 1.0 Background of the Study 1 1.2 Solar Power System 2 1.3 Operating Principle of the DSTATCOM 3 1.4. Modelling of PV Array 5... Continue Reading
    The major components of a gas turbine are compressor, combustors, turbine and generator. It operates by continuous drawing in fresh air into the compressor. The Air is then compressed to a high pressure in the compressor and discharge into the combustion. Here the air is missed with gas and burns continuous once ignited to increase its energy... Continue Reading
    Call Us
    whatsappWhatsApp Us