ABSTRACT As the demand of energy is increasing day by day, so the ultimate solution to deal with these sorts of problems is just to implement the renewable sources of energy Humans are using the renewable energy which are solar, wind etc. but we still could not satisfy our power needs, because of that we have to generate electricity through each and every possible ways. The objective of this work is to produce power through footsteps as a source of renewable energy that we can obtained while walking or standing on to the certain arrangements like footpaths, stairs, plate forms and these systems can be install specially in the more populated areas. In this project the force energy is produced by human foot step and force energy is converted into mechanical energy by the rack and pinion mechanism. Electricity is produced by DC generator. We are supposed to study existing methods of foot step power generation that are rack and pinion arrangement and piezoelectric crystals and supposed to modify the existing system.

DESIGN AND IMPLEMENTATION OF AN AC/DC POWER HARVESTING USING HUMAN FOOT STEP
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0504
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 54 Pages
  • Methodology: nil
  • Reference: YES
  • Format: Microsoft Word
  • Views: 651
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Electrical Engineering
    Project ID ELE0504
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 54 Pages
    Methodology nil
    Reference YES
    Format Microsoft Word

    Related Works

    ABSTRACT As the demand of energy is increasing day by day, so the ultimate solution to deal with these sorts of problems is just to implement the renewable sources of energy Humans are using the renewable energy which are solar, wind etc. but we still could not satisfy our power needs, because of that we have to generate electricity through each... Continue Reading
    ABSTRACT The aim of this study is to fabricate a solid ankle cushion heel (SACH foot) and comparison of the differences and effect of this SACH foot on the cardiovascular responses and gait efficiency of fifteen unilateral transtibial amputees with foreign SACH foot and Single axis foot. The SACH foot was fabricated using available local... Continue Reading
    ABSTRACT The city of Nairobi was initially engineered to keep stormwater out of sight and out of mind. Unfortunately, that approach has turned a potential resource into a waste product and created new environmental hazards. Once the rain falls onto the impervious surfaces of the streets, sidewalk, parking lots and rooftops, it picks up any and all... Continue Reading
    ABSTRACT  The city of Nairobi was initially engineered to keep stormwater out of sight and out of mind. Unfortunately, that approach has turned a potential resource into a waste product and created new environmental hazards. Once the rain falls onto the impervious surfaces of the streets, sidewalk, parking lots and rooftops, it picks up any and... Continue Reading
    ABSTRACT This is a technical project write-up design and construction were carried out by me with deep intensive and extensive research work. I all give credit to the authors of the textbooks whose I referred to in the cause of writing this project and its subsequent design and construction. In this project, I shed light on the basic principle of... Continue Reading
    ABSTRACT This is a technical project write-up design and construction were carried out by me with deep intensive and extensive research work under the strict supervisor of Engr K.C Ugwu.  I all give credit to the authors of the textbooks whose I referred to in the cause of writing this project and its subsequent design and construction. In this... Continue Reading
    ABSTRACT  This is a technical project write-up design and construction were carried out by me with deep intensive and extensive research work.  I all give credit to the authors of the textbooks whose I referred to in the cause of writing this project and its subsequent design and construction. In this project, I shed light on the basic principle... Continue Reading
    (A CASE STUDY OF COMPUTER SCIENCE LABORATORY) ABSTRACT This Project entitled “DESIGN AND IMPLEMENTATION OF SOLAR POWER BANK” was designed to expose the participants to the practical skills needed in designing a solar power bank. The specification of the solar system is: Solar Panel, Mounting... Continue Reading
    Introduction In a world like ours today there is every need to manage funds in every activity being carried out. It is the concern of every firm to control its finances to ensure that unnecessary expenses are avoided. Financial management in a company has proved to be a great task involving the monitor of almost all departments of the company. As... Continue Reading
    DESIGN AND IMPLEMENTATION OF HUMAN RESOURCE MANAGEMENT   SYSTEM ABSTRACT The research work \'Human Resource Management System\' includes staff registration, task registration, task allocation, and staff leaves application, leave approver and rejection by admin, add leave type, add leave allowance. This work was done as a result to solve the... Continue Reading