AN IMPROVED METHOD TO DETERMINE HORIZONTAL WELL PRODUCTIVITY AT STEADY STATE

  • Type: Project
  • Department: Engineering
  • Project ID: EGR0001
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 59 Pages
  • Format: Microsoft Word
  • Views: 2K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

AN IMPROVED METHOD TO DETERMINE HORIZONTAL WELL PRODUCTIVITY AT STEADY STATE

TABLE OF CONTENTS

TITLE PAGE...........................................................................................................I

CERTIFICATION.......................................................................................II

DEDICATION ..........................................................................................III

TABLE OF CONTENT..............................................................................IV

LIST OF TABLES.....................................................................................VII

LIST OF FIGURES...................................................................................VIII

ACKNOWLEDGEMEENT ......................................................................X

ABSTRACT...............................................................................................XI

NOMENCLATURE ..................................................................................XII

CHAPTER ONE 

1.1 INTRODUCTION ................................................................................1

1.2 BACKGROUND OF STUDY ………………………………………..3

1.2.1 APPLICATIONS OF HORIZONTAL WELLS……………………4

1.2.2 ADVANTAGES OF HORIZONTAL WELLS.….………………...5

1.2.3 DISADVANTAGES OF HORIZONTAL WELLS……………..…..5

1.2.4 INFLOW PERFORMANCE RELATIONSHIP………………….…5

1.3 PROBLEM STATEMENT……….………………..………………..5

1.4 RESEARCH OBJECTIVE………….……………………………..….6

1.5 RESEARCH QUESTION….…..…………………………...………...6

1.6 JUSTIFICATION OF THIS STUDY……………..………………….7

1.7 SCOPE OF STUDY…………………………………………………..8

1.8 AIMS/OBJECTIVES…………………………………………..........14

CHAPTER TWO…………………………………………………..…………15

2.1 LITERATURE REVIEW…………………….……………………….…15

2.2 PRODUCTIVITY INDEX………………………………………….…...18

2.3 HORIZONTAL WELL PRODUCTIVITY……………………………...19

2.3.1 BORISOV’S MODEL………………………………………...….…….20

2.3.2 GIGER’S MODEL……………………………………………………...21

2.3.3 JOSHI’S MODEL…………………………………………………….22

2.3.4 RENARD AND DUPUY MODEL……………….…………………..23

2.3.5 ELGAGHAD, OSISANYA AND TIAB MODEL……………………..24

2.3.6 BABU AND ODEH (PSEUDO-STEADY STATE) MODEL…………25

CHAPTER THREE…………………………………………….….…………23

3.1 MODEL DESCRIPTION………………………………………..…….…23

3.2 INDIVIDUAL LAYER AND BOUNDARY CHARACTERIZATION…27

CHAPTER FOUR…………………………………………………………....31

4.1 ANALYSIS OF RESULT………………………………………....31

4.2 PERCENTAGE DEVIATION OF RESULTS…………….……...32

4.3 DISCUSSION……………………………………………………..32

CHAPTER FIVE…………………………………………...…………….….55

5.1 CONCLUSION………………………………….………….……55

5.2 RECOMMENDATION………………………………………….73

REFERENCES………………………………….…………………...56

APPENDIX……………………………………….………………....59



LIST OF TABLES

Table 4- SEQ Table \* ARABIC 1: Comparison of Productivity index Result

Table 1A: Variation of Productivity Index with Changing Well Length

Table 1B: Comparison of Vertical and Horizontal Well Productivity at Various Reservoir Thickness



LIST OF FIGURES

Figure1-1: A schematic of a vertical well drilled perpendicular to the bedding plane, and a horizontal well drilled parallel to the bedding plane.

Figure 1-2: Horizontal well following thin bed formation.

Figure 1-3: use of horizontal well to minimize Water and/or Gas coning

Figure 1-4: Intersection of Fractures

Figure SEQ Figure \* ARABIC 1-1: Division of 3D horizontal well problem into 2D problems

Figure 2-2: Transformation of Eclipse into Unit Circle

Figure 2-3: Babu and Odeh Physical Model

Figure 3-1: Reservoir Model with fully penetrating well

Figure 3-2: Model Boundaries conditions

Figure 3-3: Flow Geometry in the Reservoir

Figure 4-1: Plot of Productivity Index against Well Length

Figure 4-2: Plots of Productivity Index against Reservoir Thickness

Figure 4-3: The effect of Reservoir Thickness on Productivity Ratio

NOMENCLATURE

A, drainage area of horizontal well, ft2

a, reservoir width

a = half major axis of drainage ellipse, ft

Bo, oil formation volume factor, rb/STB

b, extension of drainage volume of horizontal well in y-direction,ft

C, unit conversion factor

CH, geometric factor in Babu and Odeh’s model

D, wellbore diameter

h, reservoir thickness, ft

Iani, permeability anisotropy, dimensionless

J, productivity index, STB/day/psi

k, effective permeability, md

kH, horizontal permeability, md

kV, vertical permeability, md

L, horizontal wellbore length, ft

L1/2, half length of horizontal wellbore, ft

p, reservoir pressure, psi

pe, reservoir pressure at boundary, psi

pi, initial pressure, psi

pwf, bottomholeflowing pressure, psi

qo, oil production rate, STB/day

re, radius of outer boundary of the reservoir, ft

rw, wellbore radius, ft

s, skin factor, dimensionless

sR, partial penetration skin factor, dimensionless

Greek symbol

ε, relative pipe roughness

Φ, flow potential

ϕ, porosity

θ,wellbore inclination

µ, viscosity

ρ, density





ABSTRACT

As the petroleum industry continues to experience advances and progress in drilling techniques, the use of horizontal well in field development has been increasing very rapidly throughout the oil industry. It becomes therefore important to adequately determine the performance of horizontal wells.

The existing methods available to determine horizontal well productivity at steady state requires complex mathematical analysis and are difficult to develop. In the course of this work, a new method was developed using simple analytical methods. Results obtained by this new method were compared to that gotten from already established methods of Borisov (1964), Giger (1984) and Joshi (1988). The major objective of this work is to present a simple and effective means to estimate the performance of horizontal wells. An excel sheet was also created in the course of this project to calculate and compare productivity index gotten from the various method. The spread sheet also enable me carry out sensitivity analysis of the results gotten by varying key parameters.

CHAPTER 1

1.1 INTRODUCTION

The major purpose of a horizontal well is to enhance reservoir contact and thereby enhance well productivity. A horizontal well is drilled parallel to the reservoir bedding plane. In other words, a vertical well is drilled perpendicular to the bedding plane (see fig1.1).



Figure 1-1



If the reservoir bedding plane is vertical, then a conventional vertical well will be drilled parallel to the bedding plane and in the theoretical sense it would be horizontal well. The objective here is to intersect multiple pay zones Horizontal wells have become popular for producing oil and gas reservoirs in many regions around the world. The objectives of horizontal wells include increasing oil and gas production, turning a non-commercial oil or gas reservoir into a commercial reservoir and controlling severe coning problems. Due to the fact that horizontal wells can enhance reservoir recovery, they should be taken into consideration when planning a field development. While horizontal wells are generally more expensive to drill than vertical wells, they often reduce the total number of wells required in a reservoir development. As an increasing number of horizontal gas wells are drilled, the need for a quick and reliable method to estimate the pressure-rate behavior of these wells is important to optimize well performance and make operational decisions. A reliable and simple analytical and empirical relationship will provide engineers a technique to assess the performance of horizontal wells prior to undertaking extensive and often time-consuming simulation studies to model the well behavior. 

Inflow performance relationship (IPR) is a pressure-rate relationships used to predict performance of oil and gas wells. There is a linear relationship when the reservoir is producing at pressure above bubble point pressure i.e. when Pwf is greater or equal to bubble point pressure. A curve is obtained at Pwf less than bubble point pressure. The linear form of an IPR represents the Productivity Index (PI) which is the inverse of the slope of the IPR. Horizontal oil well IPR also depends on the flow condition that is whether it is transient, steady or pseudo-steady state flow, which is determined by reservoir boundary condition. As the use of horizontal and multilateral wells is increasing in modern exploitation strategies, inflow performance relationships for horizontal wells are needed. The objective of this work is to develop analytical equation and IPRs for horizontal oil wells in steady state conditions that are easy to apply.

1.2 BACKGROUND OF STUDY

Horizontal wells are high-angle wells (with an inclination of generally greater than 85ᵒ) drilled to enhance reservoir performance by placing a long wellbore section within the reservoir. There was relatively little horizontal drilling activity before 1985. A variety of configurations of drilled wells have come to be characterized as horizontal wells or drainholes. Drainholes are short length wellbores drilled pre-existing vertical wells in order to enhance production. These extend between 100 and 500 ft. in either direction. Horizontal wells on the other hand, involve the drilling of new wells and are usually 1000ft or more in length. 

The use of horizontal wells to increase the area of contacted reservoir dates back to the early 1940’s. Feasibility of creating such architecture to drain a reservoir better, has been proven for a long time but the economic viability of such a process did not establish itself until recent years. This has been largely due to titanic advances in drilling, surveying and interpretation technologies.

The following are fields around the world that have been successfully drilled and are producing through horizontal wells:

Austin Chalk Formation Texas

Spraberry Tread West Texas

Pearsall Field South Texas

Okoro Oilfield Niger Delta, Nigeria



1.2.1 APPLICATIONS OF HORIZONTAL WELL

Horizontal wells are mostly applied in the following areas;

1. To Exploit Thin Oil and Gas Zone Reservoirs: A horizontal wells reflects an increased area of contact of the well with the reservoir when compare to vertical wells in a thin pay zone. As a result of this increased area of contact, there is an increase in production from horizontal wells. 



Figure 1-2: Horizontal well following thin bed formation

2. Reduction of Coning: A horizontal well is expected to have a reduced pressure drawdown when compared to a vertical well for a similar production level. This reduced drawdown pressure is expected to delay the onset of water (gas) breakthrough. Oil recovery is expected to be high except in cases where the well intersects fractures or zones of high permeability which could result in early water (gas) breakthrough. 



Figure 1-3: use of horizontal well to minimize Water and/or Gas coning

3. To intersect fracture in a naturally fractured reservoir in order to drain them effectively.



Figure 1-4: Intersection of Fractures

4. In Enhance Oil Recovery (EOR) applications, especially in thermal EOR. Horizontal well provides a large reservoir contact area and therefore enhances injectivity of an injection well. It also helps to increase the sweep efficiency. 



1.2.2 ADVANTAGES OF HORIZONTAL WELLS

1. Improved sweep efficiency in pattern flood situations.

2. Reduction in coning. Lower drawdown for the same flow rate as vertical wells, causes stable interface movement delaying the breakthrough of unwanted fluids. 

3. Reduced fluid velocities around wellbore thereby reducing the occurrence of turbulent flow.

4. Fewer number of wells is required for field development.

5. Better access to isolated zones and exploiting gravity drainage mechanism effectively.

6. Drilling relief wells for blow out prevention.

7. Accessing untapped portion of a reservoir under constrained drilling conditions (offshore platforms).

1.2.3 DISADVANTAGES OF HORIZONTAL WELLS

1. It is not suitable for thick reservoirs.

2. Completion and Stimulation technology has not been perfected yet.

3. If natural fractures connect the aquifer or gas cap, the breakthrough of unwanted fluids can be accelerated.

4. Not suitable in low vertical permeability situations. 

5. Higher cost of drilling per well.

6. Hole problems encountered while drilling can be a serious drawback. 

1.2.4 INFLOW PERFORMANCE RELATIONSHIP (IPR)

The relation between production rate (q) and flowing wellbore pressure (pwf) over the practical range of production conditions, this relation is commonly known as inflow performance relationship (IPR). Productivity index is a measure of the ability of a well to produce. It is the ratio of the liquid flow rate to the pressure drawdow

AN IMPROVED METHOD TO DETERMINE HORIZONTAL WELL PRODUCTIVITY AT STEADY STATE
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Engineering
  • Project ID: EGR0001
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 59 Pages
  • Format: Microsoft Word
  • Views: 2K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Engineering
    Project ID EGR0001
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 59 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT A comparative investigation was undertaken to determine the head loss coefficients for horizontally mounted and vertically mounted orifices using a Fluid mechanics and Heat transfer trainer developed in Nigeria. Experiments were carried out observing the procedure and the discharge of the flow of water was collected to obtain the... Continue Reading
    ABSTRACT A comparative investigation was undertaken to determine the head loss coefficients for horizontally mounted and vertically mounted orifices using a Fluid mechanics and Heat transfer trainer developed in Nigeria. Experiments were carried out observing the procedure and the discharge of the flow of water was collected to obtain the... Continue Reading
    ABSTRACT A comparative investigation was undertaken to determine the head loss coefficients for horizontally mounted and vertically mounted orifices using a Fluid mechanics and Heat transfer trainer developed in Nigeria. Experiments were carried out observing the procedure and the discharge of the flow of water was collected to obtain the... Continue Reading
    ABSTRACT This research work presents the static analysis of short cylindrical shell under internal liquid pressure with various boundary conditions and aspect ratios. Improved fourth order finite difference method was employed for the analysis and a MATLAB computer program was developed based on the matrix equations and models generated from the... Continue Reading
    INTRODUCTION 1.1 BACKGROUND OF THE STUDY At the federal level, the Nigeria Civil Service is the most important sectors of the nations economic systems at the same time when reviewed from the state level. It is seen as the most important sector of the states economics system. Specifically using Enugu state as a case study, one can observe that the... Continue Reading
    INTRODUCTION 1.1BACKGROUND OF THE STUDY At the federal level, the Nigeria Civil Service is the most important sectors of the nations economic systems at the same time when reviewed from the state level. It is seen as the most important sector of the states economics system. Specifically using Enugu state as a case study, one can observe that the... Continue Reading
    ABSTRACT The need for organization to improve in its productivity and achieve its corporate objective brought about the adoption of manpower planning in their management process. It is hoped that effective manpower planning of their employees would enhance their performances thereby contributing effectively in achieving organizational objectives.... Continue Reading
    (A CASE STUDY OF LASACO ASSURANCE PLC) ABSTRACT The need for staff motivation has been questioned by many scholars, the goal of achieving a realistic utilization of human resource has remained unattainable in some organizations. However, it has been proposed that... Continue Reading
    ABSTRACT The need for organization to improve in its productivity and achieve its corporate objective brought about the adoption of manpower planning in their management process. It is hoped that effective manpower planning of their employees would enhance their performances thereby contributing effectively in achieving organizational objectives.... Continue Reading
    ABSTRACT Heat transfer plays a great role in engineering processes, blowing of fluids is used in designing thrusters and prevention of corrosion. Suction is used in film cooling and coating of wires in chemical engineering. A lot of research has based on thermal reduction in processing streams and forgetting the machine efficiency. The study... Continue Reading
    Call Us
    whatsappWhatsApp Us