CAUSES OF CONSTRUCTION PROJECT FAILURES AND ABANDONMENT IN NIGERIA

  • Type: Project
  • Department: Estate Management
  • Project ID: ETM0133
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Methodology: Chi Square
  • Reference: YES
  • Format: Microsoft Word
  • Views: 2.7K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

CAUSES OF CONSTRUCTION PROJECT FAILURES AND ABANDONMENT IN NIGERIA

CHAPTER ONE

INTRODUCTION

1.1   BACKGROUND TO THE STUDY

Abandoned projects and construction failure including building and other civil engineering infrastructure development project like houses, churches, schools, roads, bridges, dams, tunnels, air port, sea port etc. litter the whole Nigeria. Osemenan (1987) reported that Nigeria has become the “world’s junk-yard of abandoned and failed projects worth billions of naira and it is greatly unthinkable that Nigeria blessed with so great potentials in the building and construction industry can experience such magnitude of project failure and abandonment. According to another report by Kotangora (1993) there are about 4000 uncompleted or abandoned project belonging to the Federal Government of Nigeria with an estimated cost of above N 300 billion which will take 30 years to complete at the present execution capacity of government, also according to him this issue of abandonment and construction project failure is been left without adequate attention for too long which is now having a multiplier effect on the construction industry in particular and the national economy as a whole. The building and construction industry plays a very dominant role in the economy of any nation. A healthy economy usually experience an increase in building and construction activities, but in a depressed economy, the incidence of project abandonment and construction failures tends to be more prevalent. Akindoyeni (1989) qualitatively reasoned that some of the causes of project abandonment and construction failure in Nigeria are deaths of client, inability of client to attract fund and lack of good planning.

The abandonment of development projects is the act of discontinuing any activities or maintenance works on such development project within a time frame of the contract agreement and with no intention of returning back to the development (Spelman, 1993). Similarly, O’Flaherty (1993) while reflecting on property development projects suggest that it is when an owner or developer is ceasing to provide the required maintenance management to a developed property. There could also be construction failure due to improper planning.

However, real property development projects being a capital intensive undertaking should be critically analyzed to ascertain its feasibility and viability before embarking on it. But, on several occasions and as it had been observed, governments, contractors and agencies have abandoned development projects mid-way into construction and completion.

The causes and effects of these development projects abandonments and construction failure are not just peculiar to a particular reason rather cut across several reasons (Ayodele and Alabi, 2011), and as well as creating a total dwindling effects on the values of developed properties located close and within the vicinity. The expected prominence of any earmarked development projects is to be completed, while at the same time, adding values to the built environment aesthetics. Although, development projects are temporary endeavors undertaken to create a unique product and services with a defined beginning and ending date (Gardner, 2005). The accomplishment of such purposes should be realized at all times otherwise needless of such development (Gardner, 2005). The development projects specific in the study framework is infrastructural projects (such as; house, electricity, road, schools, and drainage). However, the study purpose is to investigate and assess the causes and effects of development projects abandonment  and construction failure in Nigeria.

1.2   STATEMENT OF THE PROBLEM

The unceasing abandonment and failure of development projects is so shocking in the developing countries such that Nigerian has remained one of the countries in such difficulty (Ayodele and Alabi, 2011; Kotangora, 1993; Osemenan, 1987). Therefore, the significance that the incessant abandonment of projects and construction failure would bring several effects on the aesthetics of the environment, real properties and its values and the economy cannot be overemphasized since some of the development projects provide the basic services that should meet the needs of the people. However, this study will examine the causes of construction project failure and abandonments in Nigeria.

1.3   OBJECTIVES OF THE STUDY

The following are the objectives of this study:

1.  To examine the causes of construction project failure and abandonments in Nigeria.

2.  To examine the effect of construction project failure and abandonments in Nigeria.

3.  To determine the solution to the problem of construction project failure and abandonments in Nigeria.

1.4   RESEARCH QUESTIONS

1.  What are the causes of construction project failure and abandonments in Nigeria?

2.  What is the effect of construction project failure and abandonments in Nigeria?

3.  What is the solution to the problem of construction project failure and abandonments in Nigeria?

1.6   SIGNIFICANCE OF THE STUDY

The following are the significance of this study:

1.  This study will educate the general public and the experts in the building industry on the causes of construction project failure and abandonments in Nigeria with a view of proffering solution to the problem.

2.  This research will also serve as a resource base to other scholars and researchers interested in carrying out further research in this field subsequently, if applied will go to an extent to provide new explanation to the topic.

1.7   SCOPE/LIMITATIONS OF THE STUDY

This study on causes of construction project failure and abandonments in Nigeria will cover the issues of abandoned projects, failed project and all other abandoned infrastructural facilities.

LIMITATION OF STUDY

Financial constraint- Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).

 Time constraint- The researcher will simultaneously engage in this study with other academic work. This consequently will cut down on the time devoted for the research work.

REFERENCES

Akindoyemi, A. (1989), the Management of Abandoned Project, Journal of Nigerian Institute of Building, Vol. 1, Iss. 2, pp. 27.

Ayodele, E.O. and Alabi, O. M. (2011), Abandonment of Construction Projects in Nigeria: Causes and Effects; Journal of Emerging Trends in Economics and Management Sciences (JETEMS), Vol. 2, Iss. 2, pp. 142-145.

Gardiner, P.D. (2005). Project Management: A Strategic Planning Approach: Palgrave Macmillan, USA and UK.

Kotangora, O. O. (1993); Project Abandonment, Nigerian Tribune.

O’Flaherty, B. (1993) Abandoned Building: A Stochastic Analysis; Journal of Urban Economics, Vol. 34, pp. 43-74.

Osemenan, I. (1987); Project Abandonment; New Watch Magazine, Vol. 1, pp. 15.

Spelman, W. (1998); Abandoned Buildings: Magnets for Crime; Journal of Criminal Justice, Vol. 21, National Vacant Properties Campaign.

CAUSES OF CONSTRUCTION PROJECT FAILURES AND ABANDONMENT IN NIGERIA
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Estate Management
  • Project ID: ETM0133
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Methodology: Chi Square
  • Reference: YES
  • Format: Microsoft Word
  • Views: 2.7K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Estate Management
    Project ID ETM0133
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 50 Pages
    Methodology Chi Square
    Reference YES
    Format Microsoft Word

    Related Works

    ABSTRACT    The need for the Nigerian construction industry to move away from the traditional forms of project procurement and embrace project management services cannot be over emphasized.  This is as a result of the importance of capital projects to the development of a young nation.  This study investigated the impact of project management... Continue Reading
    ABSTRACT This study sought risk management and performance of UNDP projects in Somalia: a case study of Mogadishu to cadale road construction projet.~t. The objectives were; To establish relationship between risk identification and project performance of Mogadishu to Cadale Road Construction project, To assess the relationship between risk... Continue Reading
    ABSTRACT In this study research, we have examined the Project Evaluation and Review Technique, PERT and the Critical Path Method CPM/Critical Path Analysis. CPA as Project Management tools, among others, and applied them to study the Electrical and Mechanical services contract of the School of Health Technology Building Project, FUTO, using... Continue Reading
    ABSTRACT    In this study research, we have examined the Project Evaluation and Review Technique, PERT and the Critical Path Method CPM/Critical Path Analysis. CPA as Project Management tools, among others, and applied them to study the Electrical and Mechanical services contract of the School of Health Technology Building Project, FUTO, using... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY It is a known fact that the Nigerian construction industry continues to occupy an important position in the nation’s economy even though it contributes less than the manufacturing or other service industries, (Aibinu and Jagboro, 2002). The contribution of the construction industry to national... Continue Reading
    ABSTRACT This research project examined the impact of budgeting and budgetary control in construction project delivery in Nigeria. The study tried to find out how industries make budget and uses budget to achieve the objectives of the firm. It also sought to... Continue Reading
    Chapter one Introduction 1.1. Background of the Study Construction industry has complexity in its nature because it contains a large number of parties such as clients, contractors, consultants, stakeholders, shareholders, regulators and others. Construction projects in the Gaza Strip suffer from many problems and complex issues in performance,... Continue Reading
    (A case study of Some Selected project Supervisors from Julius Berger Nigeria Plc and Marlum Nigeria Plc, Uyo offices.) CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Time impacts are inevitable on construction projects, primarily because... Continue Reading
    Research aim and objective Research question Research hypothesis Delimitation and Scope of the study Definition of Terms4 Chapter Two: Literature Review  The Construction Industry 6        Culture 6 Quality 8 Key performance indicators (KPI)9 Quality Culture9      Element of quality culture  Factors affecting the maintenance of quality... Continue Reading
    ABSTRACT The successful implementation of building projects may be impaired without a good knowledge of the environmental factors that contribute to building projects abandonment and this abandonment makes it difficult to achieve the benefit to be derived from the projects. The aim of the study was to evaluate the environmental factors that lead... Continue Reading
    Call Us
    whatsappWhatsApp Us