DEVELOPMENT AND EVALUATION OF A FIRE IN TUBE BOILER FOR THE DEHYDRATION OF MAIZE PRODUCT

  • Type: Project
  • Department: Food Technology
  • Project ID: FTE0213
  • Access Fee: ₦5,000 ($14)
  • Pages: 109 Pages
  • Format: Microsoft Word
  • Views: 484
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT 
Majority of farmers in Nigeria harvest a large proportion of maize under conditions of high 
humidity, and sadly enough, they lack equipment for drying the grains. The farmers store the 
grains at conditions of high moisture and humidity which results in growth of organisms that 
cause deterioration. One of the most important operations carried out for the preservation of 
maize is dehydration. It helps to reduce the moisture content of the grains to a level in which 
spoilage organisms are less active or inactive. Maize has high moisture content (between 30% 
and 40% w.b.) as at the time of harvest. This amount of moisture present does not support 
immediate storage, hence the need for dehydration.
Dehydration can be carried out in various ways. The conventional method of dehydration is 
basically by sun drying. However, the limitations to the use of this method which includes 
variation in drying temperature, no control over the source of drying as well as change in 
climatic conditions has led to the fabrication of machines that could carry out drying operations 
efficiently and without the above limitations.
This project focuses on the design, fabrication and evaluation of the characteristics of a C-class 
fire-in-tube boiler. The design is carried out to specification with a design objective to deliver 
high pressure steam that performs useful work in synchronization with the dehydration unit of 
the existing pilot tray dryer for the dehydration of maize products from a moisture content of 
23% to 10% and also for the study of the drying kinetics of the grains. The fabricated boiler 
was capable of generating steam at a pressure of about 4 bar and temperature of about 150oC. 
The throughput of the boiler is 40.5 litres/hr with a thermal efficiency of 71.64%.



TABLE OF CONTENTS
DEDICATION............................................................................................................................... iii
ACKNOWLEDGEMENT ............................................................................................................. iv
TABLE OF CONTENTS................................................................................................................ v
LIST OF TABLES......................................................................................................................... ix
LIST OF FIGURES ........................................................................................................................ x
ABSTRACT................................................................................................................................... xi

CHAPTER ONE ............................................................................................................................. 1
INTRODUCTION .......................................................................................................................... 1
1.1 Background ...................................................................................................................... 1
1.2 Objectives......................................................................................................................... 3
1.3 Scope of the Project Work ............................................................................................... 3

CHAPTER TWO ............................................................................................................................ 5
LITERATURE REVIEW ............................................................................................................... 5
2.1 Maize................................................................................................................................ 5
2.1.1 Importance and Uses of Maize ................................................................................. 7
2.1.2 Maize Drying ............................................................................................................ 8
2.1.3 Storage .................................................................................................................... 10
2.2 Boilers............................................................................................................................ 12
2.2.1 Fundamentals of Steam Generation ........................................................................ 16
2.2.2 Classification of Boilers.......................................................................................... 21
2.2.3 Types of Boilers...................................................................................................... 22
2.2.4 Working Pressure and Temperature........................................................................ 37
2.2.5 Fuel Type ................................................................................................................ 37
2.2.6 Key Components of Boilers.................................................................................... 38
2.2.7 Superheaters............................................................................................................ 39
2.2.8 Safety Issues............................................................................................................ 43
2.2.9 Best Practices for Efficient Operation .................................................................... 44

CHAPTER THREE....................................................................................................................... 47
METHODOLOGY........................................................................................................................ 47
3.1 Design Considerations.................................................................................................... 47
3.2 Components of the Fire-tube Boiler............................................................................... 47
3.3 Design Calculations........................................................................................................ 49
3.3.1 The Tube ...................................................................................................................... 49
3.3.2 The Shell ...................................................................................................................... 52
3.3.3 Fixed Tube Plate .......................................................................................................... 55
Design of the Fixed Tube Plate................................................................................................. 55
3.3.4 The Superheated Steam Chamber................................................................................ 56
3.4 Materials of Construction............................................................................................... 57
3.5 Lagging Materials .......................................................................................................... 57
3.6 Pressure Testing ............................................................................................................. 57
3.7 Product Selection............................................................................................................ 60
3.8 Moisture content determination of maize grains............................................................ 60
3.9 Determination of Physical properties of maize grains................................................... 60
3.10 Performance Evaluation of the Boiler ........................................................................ 61
3.10.1 Boiler Evaluation Using Gas...................................................................................... 61
3.10.2 Boiler Evaluation Using Biomass (Charcoal)............................................................ 62
3.10.3 Throughput of the Boiler............................................................................................ 62
3.10.4 Thermal Efficiency of the Boiler ............................................................................... 62
3.11 Performance Evaluation of the Pilot tray dryer ................................................................ 63
3.12 Cost Estimate .................................................................................................................... 67

CHAPTER FOUR......................................................................................................................... 69
RESULTS AND DISCUSSIONS................................................................................................. 69
4.1 Moisture Content............................................................................................................ 69
4.2 Determination of Some Physical Properties of the maize grains................................... 69
4.3 Thermal Efficiency of the Boiler ................................................................................... 71
4.4 Throughput of the Boiler................................................................................................ 71
4.5 Pressure Variation in the Boi0ler ................................................................................... 71
4.5.1 Pressure Variation during Gas-Firing .......................................................................... 71
4.5.2 Pressure variation during Charcoal-fired evaluation ................................................... 71
4.6 Temperature variations during Evaluation..................................................................... 79
4.6.1 Temperature variation in the Boiler during Gas-Fired Evaluation .............................. 79
4.7 Temperature variation in the pilot tray dryer during drying .......................................... 88
4.8 Drying Kinetics of the maize grains in the Pilot Tray Dryer ......................................... 92
4.9 Discussions..................................................................................................................... 95

CHAPTER FIVE........................................................................................................................... 97
CONCLUSION AND RECOMMENDATION............................................................................ 97
5.1 Conclusion...................................................................................................................... 97
5.2 Recommendations.......................................................................................................... 98
REFERENCES.............................................................................................................................. 99
APPENDIX I............................................................................................................................... 102
APPENDIX 2.............................................................................................................................. 103
APPENDIX 3.............................................................................................................................. 104
APPENDIX 4.............................................................................................................................. 105
APPENDIX 5.............................................................................................................................. 106
APPENDIX 6.............................................................................................................................. 107
APPENDIX 7.............................................................................................................................. 108
APPENDIX 8.............................................................................................................................. 109



DEVELOPMENT AND EVALUATION OF A FIRE IN TUBE BOILER FOR THE DEHYDRATION OF MAIZE PRODUCT
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Food Technology
  • Project ID: FTE0213
  • Access Fee: ₦5,000 ($14)
  • Pages: 109 Pages
  • Format: Microsoft Word
  • Views: 484
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Food Technology
    Project ID FTE0213
    Fee ₦5,000 ($14)
    No of Pages 109 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT The construction of this vertical fire tube boiler was carried out both at the industrial center and Mechanical Engineering workshop of the Institute of Management and Technology (IMT), Enugu. The boiler contains 2 steam tubes at triangular pitch which are enclosed in a shell. Water is... Continue Reading
    ABSTRACT The construction of this vertical fire tube boiler was carried out both at the industrial center and Mechanical Engineering workshop of the Institute of Management and Technology (IMT), Enugu.The boiler contains 2 steam tubes at triangular pitch which are enclosed in a shell. Water is introduced... Continue Reading
    SUITABILITY OF THE APPLICATION OF FIRE DRILL IN THE PREVENTION OF MARKET FIRE . (A CASE STUDY OF MARKETS IN OWERRI) ABSTRACT Fire safety in market is determined by a number of factors: the provisions of means of regulation against fire out break, the ability for a building to resist the effects of fire and to minimize the spread of fire and smoke... Continue Reading
    ABSTRACT The evaluation and development and marketing of service products in educational sector is a very interesting topic to research on because it will help both the service industries and government at large to enact policies that will help in boosting the... Continue Reading
    ABSTRACT In a study at KNUST weather station, the crop co-efficient values at initial, development, mid-season, and late season stages of ABONTEM MAIZE (hybrid variety) were determined as 0.42, 0.98, 1.05, and 0.32, respectively. These locally determined values of ABONTEM hybrid maize compared favourably with those recommended by FAO. The... Continue Reading
    ABSTRACT In a study at KNUST weather station, the crop co-efficient values at initial, development, mid-season, and late season stages of ABONTEM MAIZE (hybrid variety) were determined as 0.42, 0.98, 1.05, and 0.32, respectively. These locally determined values of ABONTEM hybrid maize compared favourably with those recommended by FAO. The... Continue Reading
    ABSTRACT In a study at KNUST weather station, the crop co-efficient values at initial, development, mid-season, and late season stages of ABONTEM MAIZE (hybrid variety) were determined as 0.42, 0.98, 1.05, and 0.32, respectively. These locally determined values of ABONTEM hybrid maize compared favourably with those recommended by FAO. The... Continue Reading
    ABSTRACT Sitophilus zeamais Motschulsky is the major insect pest seen damaging stored maize in Zimbabwe. The environmental hazards of synthetic insecticides, the unreliability supply and high costs of these chemicals resulted in the search for cheaper and safer use of the naturally available plant material to control this pest. This study... Continue Reading
    ABSTRACT The evaluation of Kolanut pod husk (KPHM) as substitute for maize in the diet of African catfish (Clarias gariepinus) was investigated for period of eight (8) weeks. KPHM was substituted for maize at 0% (control (Tl)), 2S% (T2), SO%(T3), 7S% (T4) and I00% (TS) in the five different diets .C. gariepinus fingerlings (average Weight 3.02g to... Continue Reading
    ABSTRACT  In order for projects to achieve the intended objectives there is need for the project team to continuously, monitor the project activities with the objective of ensuring that the project is on course and take corrective actions whenever there are significant deviations. This process involves regular and systematic collection, analysing... Continue Reading
    Call Us
    whatsappWhatsApp Us