ANALYSIS OF THE CAUSES OF REWORK IN ENGINEERING PROCUREMENT CONTRACTS IN NIGERIA OIL & GAS INDUSTRY

  • Type: Project
  • Department: Management
  • Project ID: MGT0124
  • Access Fee: ₦5,000 ($14)
  • Pages: 165 Pages
  • Format: Microsoft Word
  • Views: 593
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

Rework has become a menace in engineering procurement and construction projects in Nigerian oil and gas field. This study investigated the underlying causes of rework in construction projects and the impact on overall project performance so that effective containment and reduction strategies can be developed. The research was motivated by several international and local studies demonstrating a lack of concern for the root causes of rework and the potential impact on cost, overall project performance, and the ‘ non value-added ’ to the completed project. The research approach adopted included an exploratory and main study targeting purposively selected construction professionals and stakeholders in the Niger Delta area of the South-South region of Nigeria. The exploratory case study was carried out at the initial stage of the study to gain more insight into the causes and impact of rework on overall project performance. Specifically, data was collected by means of observation of physical works, semi-structured interviews with relevant parties directly involved in site operation and the analysis of site instruction record documents. The main study obtained data from 78 construction professionals and stakeholders via questionnaire survey, a survey conducted among design consultants and contractors in the general building category ranging from grade 3 to 9. Descriptive, inferential statistics and probability distribution functions were used to analyse the data. The findings revealed that changes initiated by the client, changes initiated by the design team due to errors and omissions, poor coordination, and finally, integration among the design team were the major contributing factors to rework. Moreover, non-compliance with specifications, setting-out errors, low labour skills, and emphasis on time and cost aggravated the occurrence of rework on site. The study revealed that while there is no significant difference between the causes of rework and various project types, rework can and often does make a significant contribution to any project’s cost overrun.

ANALYSIS OF THE CAUSES OF REWORK IN ENGINEERING PROCUREMENT CONTRACTS IN NIGERIA OIL & GAS INDUSTRY
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Management
  • Project ID: MGT0124
  • Access Fee: ₦5,000 ($14)
  • Pages: 165 Pages
  • Format: Microsoft Word
  • Views: 593
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Management
    Project ID MGT0124
    Fee ₦5,000 ($14)
    No of Pages 165 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT Rework has become a menace in engineering procurement and construction projects in Nigerian oil and gas field. This study investigated the underlying causes of rework in construction projects and the impact on overall project performance so that effective containment and reduction strategies can be developed. The research was motivated by... Continue Reading
    ABSTRACT The study intended to establish the relationship between Procurement contracts and compliance with procurement procedures among manufacturing industries in Uganda, a case of steel rolling mills in Jinja Municipality, Uganda This study was guided by three objectives; (i) To determine the extent of Procurement contracts. (ii) To determine... Continue Reading
    CHAPTER ONE 1.0   Introduction Strategies for the procurement of building projects have not changed significantly in the last 25 years, though time and cost overruns are still prevalent throughout the industry (Smith and Love, 2001). In a... Continue Reading
    ABSTRACT Rework at the construction phase is a common occurrence during project execution and can lead to time and cost overruns. The aim of the study was to assess the effects of rework on construction project performance in Ghana. The study adopted a quantitative research design and the target population was consultants to assemblies and... Continue Reading
    ABSTRACT Rework at the construction phase is a common occurrence during project execution and can lead to time and cost overruns. The aim of the study was to assess the effects of rework on construction project performance in Ghana. The study adopted a quantitative research design and the target population was consultants to assemblies and... Continue Reading
    Abstract This study was a needs analysis of the National Diploma in electrical/electronic curriculum in preparing students for employment. The study adopted a descriptive survey design and posed six research questions and formulated four hypotheses to guide the study. The population for the study consisted of 1023 respondents made up of 142... Continue Reading
    Abstract This study was a needs analysis of the National Diploma in electrical/electronic curriculum in preparing students for employment. The study adopted a descriptive survey design and posed six research questions and formulated four hypotheses to guide the study. The population for the study consisted of 1023 respondents made up of 142... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY It is a paradox that Nigeria is a rich country inhabited by the poor. Her poverty profile in statistical figures according to a recent study indicates that Nigeria is poverty endemic. Poverty incidence increased between 1980 and 1985 and between 1992 and 1996. The trend also shows that there has... Continue Reading
    CERTIFICATION i DECLARATION AND COPYRIGTH ii ABSTRACT iii Dedication iv ACKNOWLEDGEMENT v Table of Contents vi LIST OF TABLES ix CHAPTER ONE 1 1.1 Introduction 1 1.2 Motivation statement 3 1.3 Problem statement 5 1.4 Objective of the study 6 1.4.1 Specific objectives 6 1.4.2 Research question 7 1.5 Scope of the project: 7 1.6 Expected outcome of... Continue Reading
    CERTIFICATIONi DECLARATION AND COPYRIGTHii ABSTRACTiii Dedicationiv ACKNOWLEDGEMENTv Table of Contentsvi LIST OF TABLESix CHAPTER ONE1 1.1 Introduction1 1.2 Motivation statement3 1.3 Problem statement5 1.4 Objective of the study6 1.4.1   Specific objectives6 1.4.2 Research question7 1.5 Scope of the project:7 1.6 Expected outcome of the project8... Continue Reading
    Call Us
    whatsappWhatsApp Us