CONSTRUCTION OF PROPELLER AGITATOR

  • Type: Project
  • Department: Mechanical Engineering
  • Project ID: MCE0320
  • Access Fee: ₦5,000 ($14)
  • Pages: 44 Pages
  • Format: Microsoft Word
  • Views: 375
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT

Propeller agitator is a specialized of various types of substances.  It consists of three basic components which are the shaft, blade and the vessel.
In the construction, mild steel was chosen due to it’s inherent properties.  After the procurement, the following constructional operations were carried out which included marking out, center punching folding, welding, filling operation, assembling, and painting to beautify the equipment and for other purposes. 
The shapes and forms are formulated to obtain the following dimensions of the agitator.  These are length of handle = 320mm, diameter of gear teeth = 100mm, thickness of shaft = 20mm, thickness of gear = 12mm, size of blade = 50mm x 100mm, blade diameter = 63mm, inside diameter of pump = 12mm, outside diameter of pump = 20mm, shat height = 470mm, vessel diameter = 340mm and height = 560mm
The agitating mixer has high efficiency of comparable to those produced industrially.  The estimated rate of rotation is 1720 rpm.
The cost of construction of the agitator is however minimized due to the preferred choice of the raw material and method of fabrication.


TABLE OF CONTENTS

Title page
Letter of transmittal
Dedication
Acknowledgement
Abstract
Table of contents

CHAPTER ONE
1.0Introduction
1.1The objective of the project

CHAPTER TWO
2.1The theory and concept of agitation
2.2Type of mixers
2.3The impeller mixers for liquids
2.31Paddles
2.32Turbines
2.33Propellers
2.4The particle mixer for free flowing solids
2.5Mixers for heavy paste or cohesive solids
2.6Agitator effectiveness & agitation index
2.7Degree of agitation
2.8Power consumption in agitators
2.9Agitation rate
2.10Materials for the construction of propeller agitator
2.11Equipments for the fabrication of propeller agitator

CHAPTER THREE
3.1Construction and fabrication procedure
3.2Steps of fabrication process

CHAPTER FOUR
4.0Cost analysis
4.1Material cost
4.2Labour cost

CHAPTER FIVE
5.1Discussion
5.2Recommendation
5.3Conclusion

CHAPTER SIX
Nomenclature
References

CONSTRUCTION OF PROPELLER AGITATOR
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Mechanical Engineering
  • Project ID: MCE0320
  • Access Fee: ₦5,000 ($14)
  • Pages: 44 Pages
  • Format: Microsoft Word
  • Views: 375
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Mechanical Engineering
    Project ID MCE0320
    Fee ₦5,000 ($14)
    No of Pages 44 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT           Propeller agitator is a specialized of various types of substances.  It consists of three basic components which are the shaft, blade and the vessel.           In the construction, mild steel was chosen due to it’s inherent properties.  After the procurement, the following constructional operations were... Continue Reading
    ABSTRACT A vehicle such as a large truck Can generate electricity for operating a hybrid engine or recharging batteries by use of an electricity generating driveshaft.   The electricity generating driveshaft is comprised of a magnetized driveshaft which acts as a rotor, and a series of copper wire coils surrounding the magnetized driveshaft which... Continue Reading
    This project proposes the use of a propellers to power a lightweight vehicle as a non-conventional means of transportation within the school environment. Propellers work based on the generation of thrust sufficient enough to move a mass (in this case, a lightweight, three-wheeled vehicle) to which it is connected. The propeller powered vehicle... Continue Reading
    This project proposes the use of a propellers to power a lightweight vehicle as a non-conventional means of transportation within the school environment. Propellers work based on the generation of thrust sufficient enough to move a mass (in this case, a lightweight, three-wheeled vehicle) to which it is connected. The propeller powered vehicle... Continue Reading
    ABSTRACT  Maintaining steady cost projection on construction projects had been until recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial Cost plan, had been prevalent on Construction sites. However, little or no efforts has made to curtail the phenomenon, it is against this background that... Continue Reading
    Construction industry in Nigeria had been a major source of employment for 70% of labour in the country, thus it controls the capital flow, as well as labour resources, which has cost implications. Adequate management of these resources is considered an important aspect of project works; so also if the resources are adequately harnessed, issues... Continue Reading
    CHAPTER ONE 1.0 INTRODUCTION 1.1 BACKGROUND OF THE STUDY The growing need for construction of all types coupled with a tight monetary supply has provided the construction industry with a big challenge to cut cost. Nigerian construction industry is faced... Continue Reading
    ABSTRACT Construction Management is the art of directing and coordinating human and material resources throughout the life of a construction project by using modern construction management techniques to achieve predetermined objectives of scope, cost, time, and quality and participation satisfaction. Project management in construction encompasses... Continue Reading
    ABSTRACT  Construction Management is the art of directing and coordinating human and material resources throughout the life of a construction project by using modern construction management techniques to achieve predetermined objectives of scope, cost, time, and quality and participation satisfaction. Project management in construction... Continue Reading
    ABSTRACT Construction Management is the art of directing and coordinating human and material resources throughout the life of a construction project by using modern construction management techniques to achieve predetermined objectives of scope, cost, time, and quality and participation satisfaction. Project management in construction encompasses... Continue Reading
    Call Us
    whatsappWhatsApp Us