REPAIR AND REHABILITATION OF A FAULTY AIR CONDITIONER IN THE MECHANICAL ENGINEERING DEPARTMENT AT THE INSTITUTE OF MANAGEMENT AND TECHNOLOGY (I.M.T.), ENUGU

  • Type: Project
  • Department: Mechanical Engineering
  • Project ID: MCE0383
  • Access Fee: ₦5,000 ($14)
  • Pages: 35 Pages
  • Format: Microsoft Word
  • Views: 458
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT
In the mechanical engineering department of institute of management and technology there are many machines but it is not all that is functioning well.
This may airless as a   result of lack of maintenance which is a prove in the breakdown of the air conditioner.
The quality and effectiveness of materials were mated very well as referred to machine maintenance.
The cost of maintenance was minimized jet reaching a highly victorious rehabilitation.
In the course of rehabilitation and repair of a faulty air conditioner, suitable tools such as manifold gauge, refrigerant cost and quality of equipment were put into consideration.      

 
TABLE OF CONTENTS 

Title page
Letter of transmittal 
Approval page
Dedication
Acknowledgement 
Abstracts
Table of contents

CHAPTER ONE 
1.0Introduction
1.1Literature Review

CHAPTER TWO 
2.0The Air Conditioning Cycle Analysis 
2.1Air Conditioning Maintenance 
2.2Repairs and Preparation 
2.3Detection of Faults and Repairs
2.4Perceptional Measure
2.5Air Conditioner Operation Principles 
2.6Application of Air Conditioner 
2.7The Component Parts in Air Conditioner
2.8Sequence of Operation 
2.9The Cost Analysis 

CHAPTER THREE
Conclusion
3.1Recommendation
3.2References 
  

         

REPAIR AND REHABILITATION OF A FAULTY AIR CONDITIONER IN THE MECHANICAL ENGINEERING DEPARTMENT AT THE INSTITUTE OF MANAGEMENT AND TECHNOLOGY (I.M.T.), ENUGU
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Mechanical Engineering
  • Project ID: MCE0383
  • Access Fee: ₦5,000 ($14)
  • Pages: 35 Pages
  • Format: Microsoft Word
  • Views: 458
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Mechanical Engineering
    Project ID MCE0383
    Fee ₦5,000 ($14)
    No of Pages 35 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT In the mechanical engineering department of institute of management and technology there are many machines but it is not all that is functioning well. This may airless as a result of lack of maintenance which is a prove in the breakdown of the air conditioner. The quality and effectiveness of materials were mated very well as referred to... Continue Reading
    ABSTRACT In the mechanical engineering department of institute of management and technology there are many machines but it is not all that is functioning well. This may airless as a   result of lack of maintenance which is a prove in the breakdown of the air conditioner. The quality and effectiveness of materials were mated very well as referred... Continue Reading
    ABSTRACT In the mechanical engineering department of institute of management and technology there are many machines but it is not all that is functioning well. This may airless as a   result of lack of maintenance which is a prove in the breakdown of the air conditioner. The quality and effectiveness of materials were mated very well as referred... Continue Reading
    ABSTRACT This report covers all activities candied out to rehabilitate a faulty refrigerator. First and foremost, we diagnosed the faulty refrigerator using the basic instruments to know the faults. After which we bought the necessary standard items that caused the fault.  We then started work on it by replacing necessary instruments.  We... Continue Reading
    ABSTRACT This report covers all activities candied out to rehabilitate a faulty refrigerator. First and foremost, we diagnosed the faulty refrigerator using the basic instruments to know the faults. After which we bought the necessary standard items that caused the fault.  We then started work on it by replacing necessary instruments.  We... Continue Reading
    ABSTRACT In all types of air –conditioning work a through knowledge of basic principal is varying important. The report of the project “re pair and rehabilitation of a faulty Air–conditioner” serves as guide to project implementation. It explains and illustrates the import principle of operation and various maintenance procedures in an... Continue Reading
    ABSTRACT In all types of air –conditioning work a through knowledge of basic principal is varying important. The report of the project “re pair and rehabilitation of a faulty Air–conditioner” serves as guide to project implementation. It explains and illustrates the import principle of operation and various maintenance procedures in an... Continue Reading
    ABSTRACT  Mechanical Engineering Department of the named Institute has many non – operational malhiues. Sequel to the fact, maintenance was poorly excuted which resulted to the breakdown deep freezer. Quality and effectiveness of machine maintenance were well observed. Also, a minimized maintenance and a highly successful  repair was adopted.... Continue Reading
    ABSTRACT Mechanical Engineering Department of the named Institute has many non – operational malhiues. Sequel to the fact, maintenance was poorly excuted which resulted to the breakdown deep freezer. Quality and effectiveness of machine maintenance were well observed. Also, a minimized maintenance and a highly successful repair was adopted. In... Continue Reading
    ABSTRACT Mechanical Engineering Department of the Institute of Management and Technology has many non – functional machines. This is caused as a result of poor maintenance culture, which in turn resulted to breakdown of the Deep Freezer under review.... Continue Reading
    Call Us
    whatsappWhatsApp Us