PROJECT ON CONSTRUCTION AND TESTING OF A LIGHT DIMMER SWITCH

  • Type: Project
  • Department: Medical and Health Science
  • Project ID: MHS0115
  • Access Fee: ₦5,000 ($14)
  • Pages: 15 Pages
  • Format: Microsoft Word
  • Views: 2.2K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

This project (light Dimmer Switch) is base on adjusting the voltage which gets to the lamp. The project use an alternating current as an input at the rate 240v from the socket outlet. The circuit is mainly used to control the desired brightness of the lamp of 100watts, by limiting the flow of current through the lamp by their equivalent resistance, which the capacitor used to store same charges when the variable resistor is varied. The project dimmer switch can be used in so many places. 

 

 

 


 

TABLE OF CONTENT

 

TITLE PAGE. i

DECLARATION.. ii

CERTIFICATION.. iii

DEDICATION.. iv

ACKNOWLEDGEMENT. v

ABSTRACT. vi

TABLE OF CONTENT. vii

CHAPTER ONE

1.0     INTRODUCTION.. 1

1.1     AIMS AND OBJECTIVES. 1

1.2     MOTIVATION AND SIGNIFICANCE. 2

1.3     SCOPE AND LIMITATION.. 2

1.4     METHOLOGY. 3

CHAPTER TWO

2.0     LITERATURE REVIEW... 4

2.1     PREVIOUS CONTROL DIMMER SWITCH.. 4

2.2     OVER VIEW OF THYRISTOR.. 5

2.3         OVER VIEW OF CAPACITOR.. 6

2.4     OVER VIEW OF RESISTOR. 6

CHAPTER THREE

3.1     PRINCIPLE OF OPERATION.. 7

3.2     DESIGN ANALYSIS AND CALCULATION.. 8

CHAPTER FOUR

4.0     CONSTRUCTION, TESTING AND PACKAGING.. 10

4.1     TESTING OF LIGHT DIMMER SWITCH.. 10

4.2.        PACKAGING.. 10

4.3     LIST OF COMPONENTS. 11

CHAPTER FIVE

5.0      CONCLUSION, PROBLEMS  ENCOUNTERED AND RECOMMENDATIONS. 12

5.1     CONCLUSION.. 12

5.2     PROBLEM ENCOUNTERED.. 12

5.3     RECOMMENDATION.. 12

REFERENCE. 14

PROJECT ON CONSTRUCTION AND TESTING OF A LIGHT DIMMER SWITCH
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Medical and Health Science
  • Project ID: MHS0115
  • Access Fee: ₦5,000 ($14)
  • Pages: 15 Pages
  • Format: Microsoft Word
  • Views: 2.2K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Medical and Health Science
    Project ID MHS0115
    Fee ₦5,000 ($14)
    No of Pages 15 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT     A digitally controlled light dimmer circuit is based on the principle of power control using thyristor. The switch enables light from an electric bulb to be raised from full brilliance down or up to a high range of luminance.       Owning to its construction, adequate conservation of energy is achieved.  The circuit is made in... Continue Reading
    CHAPTER ONE 1.0.   INTRODUCTION 1.1.   GENERAL DESCRIPTION OF THE PROJECT Industrial electronics has turned the whole world into a global village. One of the most indispensable aspects of these phenomena is automation, which forms the nucleus of the present day electronics technology. Considering the milestone, it was desired to make the... Continue Reading
    ABSTRACT    The need for the Nigerian construction industry to move away from the traditional forms of project procurement and embrace project management services cannot be over emphasized.  This is as a result of the importance of capital projects to the development of a young nation.  This study investigated the impact of project management... Continue Reading
    ABSTRACT As the zeal for change over on public power supply and stand- by generator increases; Engineers have researched deeply into the different ways and methods of achieving power changeover both manual and automatic types. It may no be considered as serious issue in some places where supply is up to 90% constant or where intermittent outage... Continue Reading
    TABLE OF CONTENT: CHAPTER ONE INTRODUCTION 1.1 OBJECTIVE OF PROJECT 1.2 JUSTIFICATION OF PROJECT 1.3 SCOPE OF DIAGRAMS IN PROJECT 1.4 BLOCK DIAGRAM OF PROJECT 1.5 PROJECT REPORT ORGANIZATION CHAPTER TWO LITERATURE REVIEW 2.1 REVIEW OF REMOTE CONTROL SYSTEMS 2.2 DESCRIPTION OF PROJECT 2.3 USE OF PROJECT CHAPTER THREE METHODOLOGY 3.1 INFORMATION... Continue Reading
    TABLE OF CONTENT: CHAPTER ONE INTRODUCTION 1.1     OBJECTIVE OF PROJECT 1.2     JUSTIFICATION OF PROJECT 1.3     SCOPE OF DIAGRAMS IN PROJECT 1.4     BLOCK DIAGRAM OF PROJECT 1.5     PROJECT  REPORT ORGANIZATION CHAPTER TWO LITERATURE REVIEW 2.1     REVIEW OF REMOTE CONTROL SYSTEMS 2.2     DESCRIPTION OF PROJECT  2.3     USE OF... Continue Reading
    ABSTRACT As the zeal for change over on public power supply and stand- by generator increases; Engineers have researched deeply into the different ways and methods of achieving power changeover both manual and automatic types. It may no be considered as serious issue in some places where supply is up to 90% constant or where intermittent outage... Continue Reading
    ABSTRACT This study sought risk management and performance of UNDP projects in Somalia: a case study of Mogadishu to cadale road construction projet.~t. The objectives were; To establish relationship between risk identification and project performance of Mogadishu to Cadale Road Construction project, To assess the relationship between risk... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    Call Us
    whatsappWhatsApp Us