DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGEOVER SWITCH

  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0395
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 29 Pages
  • Methodology: nil
  • Reference: YES
  • Format: Microsoft Word
  • Views: 469
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT
The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage.
Power instability or outage in general does not promote development in the public and private sector. The investors do not feel secure to come into a country with constant or frequent power failure. These limit the development of industries. In addition, there are processes that cannot be interrupted because of their importance for instance, surgery operation in hospitals, transfer of money between banks and lots more.Power instability and outage in developing countries (Nigeria) creates a need for alternative sources of power to backup the mains supply.
Automatic changeover switches find a wide application scope wherever the reliability of electrical supply from the utilities is low and it is used in lighting/motor circuits wherever continuity of supply is necessary, for switching to an alternative source from main supply and vice versa.
This project is a design of an automatic changeover switch. This means that when there is any mains failure, the automatic changeover switch will change to an alternative power supply (Generator), and back to the main supply when it is restored.
The purpose of this project is to maintain constant supply to the main circuit that is being supplied by making-up for the time lapse or delay that usually accompanies the manual switching from one source to another.
The design comprises of the power connection circuit and control connection circuit. The main components to be used include; contactors, relays and timer.


TABLE OF CONTENT
Title Page
Certification
Dedication
Acknowledgement
Table of Content
Abstract

Chapter One: Introduction
1.1 Project Aims and Objectives
1.2 Target Beneficiaries. 

Charter Two: literature Review

Chapter Three: Design of an Automatic Changeover Switch
3.1 Problem statement/Design problem
3.2 Relevance of project 
3.3 Method of solution/Design procedure
3.4 Theory of devices

Chapter Four: Components selection and computational results
4.1 Selection of components
4.2 Observation
4.3 Results
4.4 Discussion of results obtained

Chapter Five: Conclusion and Recommendation
References

DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGEOVER SWITCH
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0395
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 29 Pages
  • Methodology: nil
  • Reference: YES
  • Format: Microsoft Word
  • Views: 469
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Electrical Engineering
    Project ID ELE0395
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 29 Pages
    Methodology nil
    Reference YES
    Format Microsoft Word

    Related Works

    ABSTRACT This project work deals on the design and construction of an automatic power changeover that will change/transfer control from MAINS to Gen set and can switch ON/OFF the Gen automatically. The system integrates phase selector in MAINS and changeover to Gen. It is designed in several blocks all combined to from one functional unit. A +5v... Continue Reading
    Abstract Power failure or outage in general does not promote development to public and private sector. The investors do not feel secure to come into a country with constant or frequent power failure. These limit the development of industries. In addition there are processes that cannot be interrupted because of their importance, for instance... Continue Reading
    Abstract Power failure or outage in general does not promote development to public and private sector. The investors do not feel secure to come into a country with constant or frequent power failure. These limit the development of industries. In addition there are processes that cannot be interrupted because of their importance, for instance... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    ABSTRACT Most industrial and commercial processes are dependent on electrical power. Power failure or outage in general does not promote development in public and private sectors. The investors do not feel secure to come into a country with constant or frequent power failure. This limits the development of industries.In addition there are... Continue Reading
    ABSTRACT Most industrial and commercial processes are dependent on electrical power. Power failure or outage in general does not promote development in public and private sectors. The investors do not feel secure to come into a country with constant or frequent power failure. This limits the development of industries.In addition there are... Continue Reading
    ABSTRACT This project work deals on the design and construction of an automatic power changeover that will change/transfer control from MAINS to Gen set and can switch ON/OFF the Gen automatically. The system integrates phase selector in MAINS and changeover to Gen. It is designed in several blocks all combined to from one functional unit. A +5v... Continue Reading
    ABSTRACT The design and construction of a 60A, 3-Ф automatic power changeover from public utility supply to generator and vice versa was aimed at providing a useful system for use in our homes or offices. The system was achieved with a 66A 3-Ф contactor, 100mA transformers and relays. The system turns on a generator when the public utility... Continue Reading
    DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE OVER SWITCH WITH GENERATOR CUT OFF AND STARTER ABSTRACT Power supply in Nigeria and most developing countries of the world is anything but stable. This has adverse effects on the consumers of the electricity and the equipments that are operated from the mains sources of electricity supply in these... Continue Reading
    ABSTRACT The design and construction of a 60A, 3-Ф automatic power changeover from public utility supply to generator and vice versa was aimed at providing a useful system for use in our homes or offices. The system was achieved with a 66A 3-Ф contactor, 100mA transformers and relays. The system turns on a generator when the public utility... Continue Reading
    Call Us
    whatsappWhatsApp Us