CRITERIA USED BY CONSULTANTS IN PREQUALIFICATION AND SELECTION OF MECHANICAL & ELECTRICAL SUBCONTRACTORS IN BUILDING PROJECTS IN NIGERIA.

  • Type: Project
  • Department: Project Management
  • Project ID: PRM0004
  • Access Fee: ₦5,000 ($14)
  • Pages: 2 Pages
  • Format: Microsoft Word
  • Views: 1.1K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

 

This research was carried out to assess and establish the criteria used by consultants in prequalifying and selecting Mechanical and Electrical subcontractors in building projects in Nigeria. Field survey involving construction consultants and staff in the client organizations in Lagos was conducted. Data were collected with the aid of structured questionnaires. 60 well-structured questionnaires were administered on the professional survey, 53 responses were gotten back which gave a response rate of 88% and 50 were used for analysis. Information gathered include the major prequalification and selection criteria used by consultants to assess Mechanical and Electrical subcontractors in building projects. The data collected was analyzed with basic descriptive statistics such as frequency, percentage and relative importance index (RII). The core findings from the results obtained revealed that Experience on similar projects, financial stability, quality of staff / key personnel, financial statements, past management performance, past project failure and Plant / Equipment Resources were considered as the main criteria used by consultants in prequalifying Mechanical and Electrical subcontractors in building projects. Subjective judgement was identified as the most prevalent model used by consultants in prequalifying Mechanical and Electrical subcontractors in building projects. Single stage selective tendering, Negotiated tendering, and Serial tendering were identified as the most frequent methods adopted by consultants in selecting Mechanical and Electrical subcontractors in building projects and Estimated cost of project / Tender price, Access to credit, Technical competence, Organization and Management capabilities, Experience of the team, Capacity of company, Litigation history of company, Available plant/equipment for project, Experience of company with similar project and Number of staff were identified the as key criteria considered by consultants in selecting Mechanical and Electrical subcontractors in building projects. The study recommends that, the actors in building construction projects should aspire to understand, adopt and implement the requirements of subcontractors prequalification and selection criteria of building works and also ensure to Procure subcontractors that have adequate experience on similar project, technical capacity, plant/equipment resources and the financial capacity to execute work effectively at an agreed cost, time and quality.

TABLE OF CONTENTS

                                                                                                     Page

 

Title Page                                                                                           i

Certification                                                                                                ii

Dedication                                                                                         iii

Acknowledgements                                                                            iv

Abstract                                                                                             v

Table of Contents                                                                             vi

 

CHAPTER ONE

1.0    INTRODUCTION                                                                     1

1.1     Background to the Study                                                        1

1.2     Statement of the Research Problems                                        7

1.3     Research Questions                                                                 8

1.4     Aim and Objectives of the Study                                              8

1.5     Significance of the Study                                                         9

1.6     Scope and Delimitation of the Study                                       9

1.7     Definition of Key Terms                                                           10

 

CHAPTER TWO

2.0    LITERATURE REVIEW                                                           12

2.1     Introduction                                                                             12

2.2     Concept of Prequalification and subcontracting                      12

2.3     Factors Influencing Consultants Choice in Projects                 19

2.3.1  The cost consideration framework                                          19

2.3.2  The TOPSIS and SAW-G Grey Techniques                               19

2.3.3  The Prequalification Method                                                    20

2.3.4 The Construction Management at Risk Method                       23

2.3.5 The Multi Criteria Evaluation Models                                       24

 

2.4.   Methods of Prequalification Selection of Subcontractors                         25

 

2.5.    Subcontractors and suppliers selection criteria in projects       42

 

2.5.1. Tendering Methods                                                                      44

2.5.2. Criteria for the award of contract                                            45

2.6.    Areas of Subcontracting in Building Construction Projects     48

 

2.7.    Summary                                                                                51

 

CHAPTER THREE

3.0 RESEARCH METHOD                                                                53

3.1     Introduction                                                                            53

3.2     Research Design                                                                      53

3.3    Study Population                                                                      53

3.4    Sampling Techniques                                                              54

3.5    Sample Size                                                                              54

3.6    Method of Data Collection                                                        54

3.7    Method of Data Analysis                                                          56

 

CHAPTER FOUR

4.0    DATA PRESENTATION, ANALYSIS AND FINDINGS              57

4.1        Introduction                                                                            57

4.2        Data Presentation                                                                    57

4.3        Presentation & Analysis of Research Questions                       64

4.4        Discussion of Findings                                                            71

 

 

 

 

 

CHAPTER FIVE

5.0 SUMMARY, CONCLUSIONS AND RECOMMENDATIONS         74

5.1     Summary of Findings                                                              74

5.2     Conclusions                                                                             75

5.3        Recommendations                                                                   76

5.4        Area of Further Research                                                         77

References                                                                               78

Appendix                                                                                 83

CRITERIA USED BY CONSULTANTS IN PREQUALIFICATION AND SELECTION OF MECHANICAL & ELECTRICAL SUBCONTRACTORS IN BUILDING PROJECTS IN NIGERIA.
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Project Management
  • Project ID: PRM0004
  • Access Fee: ₦5,000 ($14)
  • Pages: 2 Pages
  • Format: Microsoft Word
  • Views: 1.1K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Project Management
    Project ID PRM0004
    Fee ₦5,000 ($14)
    No of Pages 2 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT   This research was carried out to assess and establish the criteria used by consultants in prequalifying and selecting Mechanical and Electrical subcontractors in building projects in Nigeria. Field survey involving construction consultants and staff in the client organizations in Lagos was conducted. Data were collected with the aid of... Continue Reading
    ABSTRACT   This research was carried out to assess and establish the criteria used by consultants in prequalifying and selecting Mechanical and Electrical subcontractors in building projects in Nigeria. Field survey involving construction consultants and staff in the client organizations in Lagos was conducted. Data were collected with the aid of... Continue Reading
    ABSTRACT    This study is designed to evaluate quality management in mechanical construction projects in the oil and gas industry. This evaluation was done by assessing quality assurance, quality control and planning. Three hypotheses were postulated to answer research questions. The study adopted an audit method as an appraisal strategy. To... Continue Reading
        CHAPTER ONE INTRODUCTION 1.1   BACKGROUND TO THE STUDY Commercial banks are important financial intermediaries serving the general public in any society. In most cases, commercial banks hold more assets than any other financial institution. In some cases even more than... Continue Reading
    THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA (A CASE STUDY OF ENUGU STATE) ABSTRACT This project is purposely for determining the effects of delay and disruption on the cost of building construction project in Nigeria, ascertaining the cost, which aim at x-raying unnecessary delay and disruption in... Continue Reading
    THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA   (A CASE STUDY OF ENUGU STATE) ABSTRACT  This project is purposely for determining the effects of delay and disruption on the cost of building construction project in Nigeria, ascertaining the cost, which aim at x-raying unnecessary delay and... Continue Reading
    Abstract The main aim of this study is to identify the significant factors for contractor selection in Nigeria using factor analysis. The study was also to find the preferred criteria for evaluation and selection of contractors in Nigeria. The selection of the most appropriate... Continue Reading
    CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal... Continue Reading
    ABSTRACT This project is designed to determine households' access to domestic water supply via mechanical and  non-mechanical energy system in Usin, Ikole local government area Ekiti State Nigeria, in terms of  quality and quantity as the importance of adequate safe water supply to human health cannot be over  emphasized. However, safe/improve... Continue Reading
    ABSTRACT This study determined the influence of estimating practice on cost performance of building projects. The objectives were to identify the estimating practices used by cost consultants, appraise the critical factors influencing estimating practice used, and to determine the influence of estimating practice on cost performance. The study... Continue Reading
    Call Us
    whatsappWhatsApp Us