STAFF QUALITY AND WORKERS PRODUCTIVITY IN SELECTED PRIVATE BUILDING COMPANIES IN ALI~SABIH DISTRICT, DJIBOUTL

  • Type: Project
  • Department: Project Management
  • Project ID: PRM0017
  • Access Fee: ₦5,000 ($14)
  • Pages: 86 Pages
  • Format: Microsoft Word
  • Views: 293
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT This study was set out to establish the relationship between staff quality and workers productivity in selected private building companies in Ali-sabih district, Djibouti the study wanted to establish the following: to determine the level of staff quality in selected private building companies, to determine the level of workers productivity in selected private building companies, to establish if there is a significant relationship between the levels of staff quality and workers productivity in selected private building companies. The purpose of the study was to test the hypothesis of no significant relationship between staff quality and workers productivity to validate the existing information about staff quality and workers productivity based on the theory to which this study is based on. To generate new knowledge based on the findings of this study. The study was conducted using descriptive correlation design. The researcher selected 100 out of 140 target populations. The instrument the study used was questionnaire. The findings showed that there is positive correlation between staff quality and workers productivity implying that it is important to improve staff quality and increase workers productivity to secure the success of these private buildings companies. The study Recommendation that the local companies implementing building companies’ projects should change policies and allow the community to participate in planning, implementation, and decision making and also should design projects concerning their problem, instead of waiting for consultation during the implementation by buildings companies.

STAFF QUALITY AND WORKERS PRODUCTIVITY IN SELECTED PRIVATE BUILDING COMPANIES IN ALI~SABIH DISTRICT, DJIBOUTL
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Project Management
  • Project ID: PRM0017
  • Access Fee: ₦5,000 ($14)
  • Pages: 86 Pages
  • Format: Microsoft Word
  • Views: 293
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Project Management
    Project ID PRM0017
    Fee ₦5,000 ($14)
    No of Pages 86 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT This study was set out to establish the relationship between staff quality and workers productivity in selected private building companies in Ali-sabih district, Djibouti the study wanted to establish the following: to determine the level of staff quality in selected private building companies, to determine the level of workers... Continue Reading
    CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control... Continue Reading
    : A CASE STUDY OF COLBEN ABSTRACT This study examined the place of welfare programme on worker’s productivity in an institution. The importance of welfare programme as a means of improving worker’s welfare programme were benefits, other than salaries, provided by an employer to ensure... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY The issue of low productivity of Nigeria workers has in recent years been a matter of greater concern to the nation. The rate of productivity grows are influenced by two things; viz (i) The rate of society’s demand and... Continue Reading
    (A CASE STUDY OF NBL 9TH MILE CORNERS NGWO) ABSTRACT The research on the factors responsible for low-productivity of Nigeria workers in the private sector with particular reference to Nigeria Breweries 9th mile corners Ngwo Enugu State was intended to... Continue Reading
    (A CASE STUDY OF NBL 9TH MILE CORNERS NGWO)   TABLE OF CONTENTS   TITLE PAGE APPROVAL PAGE DEDICATION ACKNOWLEDGEMENT ABSTRACT   CHAPTER ONE INTRODUCTION 1.1     Background of the Study 1.2     Statement of the Problem 1.3     Purpose of... Continue Reading
    ABSTRACT This study examined the place of welfare programme on worker’s productivity in an institution. The importance of welfare programme as a means of improving worker’s welfare programme were benefits, other than salaries, provided by an employer to ensure... Continue Reading
    ABSTRACT This research work “The Effects of Staff disengagement on the productivity of workers” was carried out with the overall aim of finding out the effect of staff disengagement on the productivity of... Continue Reading
    ABSTRACT The research on the factors responsible for low-productivity of Nigeria workers in the private sector with particular reference to Nigeria Breweries 9th mile corners Ngwo Enugu State was intended to determine how to increase productivity in Nigerian economy. In conducting the research reference was made to related literature.... Continue Reading
    ABSTRACT The research on the factors responsible for low-productivity of Nigeria workers in the private sector with particular reference to Nigeria Breweries 9th mile corners Ngwo Enugu State was intended to determine how to increase productivity in Nigerian economy. In conducting the research reference was made to related literature.... Continue Reading
    Call Us
    whatsappWhatsApp Us