PROJECT MANAGEMENT PRACTICES AND PERFORMANCE OF NONGOVERNMENTAL ORGANIZATIONS PROJECTS IN NAIROBI CITY COUNTY, KENYA

  • Type: Project
  • Department: Project Management
  • Project ID: PRM0020
  • Access Fee: ₦5,000 ($14)
  • Pages: 95 Pages
  • Format: Microsoft Word
  • Views: 430
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

Achievement of a project means that a number of its perceived factors were attained. It is not guaranteed that project management practices will result to success of funded projects by Micro finance institutions. However, the success of projects largely depends on the way it is managed and controlled. The challenges met during the execution of project management practices has been during project planning, exceeding the set budget and going beyond its set schedule and poor quality. This study sought to determine the role of project management practices on the performance of non-governmental organizations projects within Nairobi City County, Kenya. The study also sought to find out the effect of communication, project planning, stakeholder involvement, monitoring and evaluation on the performance of non-governmental organizations projects. The study guided by theory of constraints, the contingency theory and agency theory. This study used descriptive research design. The target population of the study was 201 NGOs operating in Nairobi County. Stratified and simple random sampling was used to select 50% of the target population thus 100 NGOs in Nairobi County. This study made use of primary data. The study collected primary data by use of questionnaires. After confirming that all data filled in was accurate, descriptive statistics and inferential statistics was utilized to analyze quantitative data. Descriptive statistics included frequency distribution, percentages and measures of central tendencies (mean). Inferential statistics used included correlation and regression analysis to show the nature and magnitude of the relationships between the variables. The data was then presented in tables and graphs. On the other hand, qualitative data was coded thematically and then evaluated. Content analysis was used to analyze qualitative data that was, data collected from open ended questions. The study findings indicated that there was improved project performance due to effective use of project management practices such as communication, planning, stakeholder participation and monitoring and evaluation of project activities. The study concluded that project communication significantly affects the project outcomes, therefore, clearly establishing and managing the structures of communication on project must always be on the agenda of team leaders and management before the commencement of every project. The study further concluded that planning, stakeholder participation and monitoring and evaluation had a positive and significant effect on project performance. The study recommends that the organization should enhance and embrace active communication throughout the organization. The stakeholders and community at large needs to be sensitized to understand the need for project planning, monitoring and implementation at all levels. The study also recommends that stakeholders should be included in all preimplementation and inception meetings as well as their views being incorporated in planning and execution.

PROJECT MANAGEMENT PRACTICES AND PERFORMANCE OF NONGOVERNMENTAL ORGANIZATIONS PROJECTS IN NAIROBI CITY COUNTY, KENYA
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Project Management
  • Project ID: PRM0020
  • Access Fee: ₦5,000 ($14)
  • Pages: 95 Pages
  • Format: Microsoft Word
  • Views: 430
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Project Management
    Project ID PRM0020
    Fee ₦5,000 ($14)
    No of Pages 95 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT Achievement of a project means that a number of its perceived factors were attained. It is not guaranteed that project management practices will result to success of funded projects by Micro finance institutions. However, the success of projects largely depends on the way it is managed and controlled. The challenges met during the... Continue Reading
    ABSTRACT Achievement of a project means that a number of its perceived factors were attained. It is not guaranteed that project management practices will result to proper implementation of projects by manufacturing companies. However, the success of projects largely depends on the way it is managed and controlled. The challenges met during the... Continue Reading
    The primary concern regarding humanitarian programs in the developing world is that  they do not address the more massive socio-economic challenges; hence, not being  sustainable. The majority of these programs have been in operation for many years  and have attracted funding from external and internal donors but has not translated  into their... Continue Reading
    ABSTRACT Slum upgrading projects have in existence in Kenya since 2000. Their aim is to improve the living standards of the slum residents. However, the level of poverty continues to increase in the slums. The project success of the slum upgrading projects is questioned because the number of people living in the slums is increasing. Experts’... Continue Reading
    ABSTRACT  Organizational performance has been the concern of both academicians and practitioners during the last many decades as the ultimate outcome of utilization of tangible and intangible resources. In addition the performance of an organization largely depends on its ability to effectively and efficiently produce cost effective... Continue Reading
    ABSTRACT Capacity development is a fundamental part of the mandates of many international organizations. Much of their work aims to strengthen national capacities through training, technical advice, exchange of experiences, research, and policy advice. Yet there is considerable dissatisfaction within the international community regarding the... Continue Reading
    ABSTRACT Government projects have changed from a simple activity to complex integrated activities which must be smartly implemented to ensure they don’t fail on operation. Despite many project implemented by Machakos County, most of them have not been effectively and efficiently implemented, others are struggling to remain relevant and the... Continue Reading
    ABSTRACT The project implementation phase requires close collaboration with clients to ensure that the project is delivered on time within the defined scope and cost to meet the organization’s needs. Organizations must know which critical factors are most responsible for the success of a project to manage these factors in the best possible... Continue Reading
    ABSTRACT Donors play a very crucial role in the social development process in all the spheres of the world. They are particularly vital in situations where state funds are limited, political situations are fluid and volatile, natural disasters resulting from both predictable and unpredictable environmental circumstances occur, ethnic animosity is... Continue Reading
                                                               ABSTRACT Donors play a very crucial role in the social development process in all the spheres of the world. They are particularly vital in situations where state funds are limited, political situations are fluid and volatile, natural disasters resulting from... Continue Reading
    Call Us
    whatsappWhatsApp Us