THE EFFECTS OF LEGAL SYSTEM ON PROCUREMENT PRACTICES IN THE ORGANISATIONS, A CASE STUDY OF UGANDA BAATI LTD

  • Type: Project
  • Department: Purchasing and Supply
  • Project ID: PAS0171
  • Access Fee: ₦5,000 ($14)
  • Pages: 42 Pages
  • Format: Microsoft Word
  • Views: 305
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

TABLE OF CONTENTS

DECLARATION

APPROVAL

DEDICATION

ACKNOWLEDGEMENT

LIST OF TABLES

LIST OF FIGURES

LIST OF ABBREVIATION

ABSTRACT

.CHAPTER ONE 1

INTRODUCTION 1

1,1 Introduction 1

1.2 Background to the study

1.3 Statement of the problem 2

1.4 General objective of the study 3

1 .5 Specific Objectives 3

1 .6 Research questions 3

1 .7 Scope ofthe study 3

1.7.1 Content Scope 3

1.7.2 Geographical Scope 3

1.7.3 Time scope 3

1.8 Significance ofthe study 4

1 .8 Definition of Key terms 4

CHAPTER TWO 5

LITERATURE REVIEW 5

2.0 Introduction

2.3 Legal System of Procurement practiced at Uganda Baati Ltd 5

2.2 Extent to which Uganda Baati Ltd complies with the Legal Public Procurement Systems in Uganda 7

2.3 Challenges of compliance to the Public Procurement Systems in Uganda Baati Ltd 8

2.4 Conceptual framework 10

CHAPTER THREE 1

METHODOLOGY 11

3.0 Introduction 11

V

3.1 Research design .11

3.2 Area of study 11

3.4 Sources of data 12

3.5 Data collection methods 12

3.5.1 Questionnaires 12

3.5.2 Interviews 12

3.5.3 Documentary Review 12

3.5.4 Observations 13

3.6 Reliability and validity of the instruments 13

3.7 Measurement of results 13

3.8 Data presentation and analysis 13

3.8.1 Editing 14

3.8.2 Coding 14

3.9 Limitations ofthe study 14

CHAPTER FOUR 14

DATA PRESENTATION, ANALYSIS AND INTERPRETATION 15

4.0 Introduction 15

4.1 Response Rate 15

4.2 Background information 16

4.3 Legal systems of procurement practiced in Uganda Baati Ltd 17

4.4 The extent to which Uganda Baati Ltd complies with the Public Procurement Systems of Uganda 18

4.5 Challenges faced by compliance with the Public Procurement Systems at Uganda Baati Ltd.

20 CHAPTER FIVE 23

DISCUSSIONS OF THE FINDINGS, CONCLUS5ION5 AND RECOMMENDATIONS .23

5.0 Introduction 23

5,1 Discussion of Findings 23

5.1.1 Legal systems of procurement practiced at Uganda Baati Ltd 23

5.1.2 The extent to which Uganda Baati Ltd complies with the Public Procurement Systems of Uganda 23

5.1.3 Challenges faced by compliance with the Public Procurement Systems at Uganda Baati Ltd 24

5.2 CONCLUSIONS 25

vi

5.3 RECOMMENDATIONS .26

5.4 SUGGESTIONS AND AREAS FOR FURTHER RESEARCH 26

REFERENCES 27

APPENDICES 28

Appendix 1: Questionnaire 28

ABSTRACT

This study was on the effects of Legal System on procurement practices in the Local Government, with a case study of Uganda Baati Ltd. The objectives of the study were to determine the legal systems ofprocurement practiced at Uganda Baati Ltd; ascertain the extent to which Uganda Baati Ltd has complied with the Legal Procurement systems of Uganda; and establish the challenges faced by compliance with the Public Procurement systems in Uganda Baati Ltd. An extensive review of the literature highlighted the pertinent impact of legal systems on procurement practices. In order to achieve the objectives, data was got from both primary and secondary sources. Primary data was collected using questionnaires that were administered to a sample size of 48 respondents who included the staff of Uganda Baati Ltd. Secondary data was gathered from publications and websites. Data was analysed and presented both in tables and graphical forms.The findings of the study revealed that, Uganda Baati Ltd had and applied Public Procurement Legal frameworks although awareness needed to be created among the non-procurement staff; limited monitoring and auditing procurement processes. Uganda Baati Ltd endeavoured to comply with PP regulations by advertising bids to the public, opening of bids in public, allowing all departments to submit their needs, and involving all departments in the procurement committee; although limited efforts were witnessed. At Uganda Baati Ltd, suppliers were not given equal opportunities in the bidding process; some of the contracts committee members showed sign of favouring other bidders in the procurement or bidding process; and procurement terms agreed upon were not maintained by all members of the procurement committee. Several challenges were anticipated but Uganda Baati Ltd did not experience challenges such as; bias with the local contractors or suppliers, purchasing at the wrong place; inadequate and unknowledgeable procurement personnel; and lack of a procurement technology. However, challenges were witnessed in the limited involvement of the user departments in the procurement process; doing procurements at the wrong time and at a wrong cost; political interference; corruption tendencies; and insufficient funding. Recommendation were made and some areas for further research put forward included; the impact of government interference on procurement efficiency; and assessing how procurement legal reforms can impact on government service delivery.

THE EFFECTS OF LEGAL SYSTEM ON PROCUREMENT PRACTICES IN THE ORGANISATIONS, A CASE STUDY OF UGANDA BAATI LTD
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Purchasing and Supply
  • Project ID: PAS0171
  • Access Fee: ₦5,000 ($14)
  • Pages: 42 Pages
  • Format: Microsoft Word
  • Views: 305
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Purchasing and Supply
    Project ID PAS0171
    Fee ₦5,000 ($14)
    No of Pages 42 Pages
    Format Microsoft Word

    Related Works

    TABLE OF CONTENTS DECLARATION APPROVAL DEDICATION ACKNOWLEDGEMENT LIST OF TABLES LIST OF FIGURES LIST OF ABBREVIATION ABSTRACT .CHAPTER ONE 1 INTRODUCTION 1 1,1 Introduction 1 1.2 Background to the study 1.3 Statement of the problem 2 1.4 General objective of the study 3 1 .5 Specific Objectives 3 1 .6 Research questions 3 1 .7 Scope ofthe study 3... Continue Reading
    TABLE OF CONTENTS Title page ................................................................................................................... i TABLE OF CONTENTS ................................................................................................ ii DECLARATION... Continue Reading
    TABLE OF CONTENTS Title page ................................................................................................................... i TABLE OF CONTENTS ................................................................................................ ii DECLARATION... Continue Reading
    TABLE OF CONTENTS APPROVAL DECLARATION . II DEDICATION ACKNOWLEDGEMENT iv TABLE OF CONTENTS v LIST OF TABLES vii LIST OF ABBREVIATIONS viii ABSTRACT ix CHAPTER ONE INTRODUCTION 1 1.0 Introduction .1 Background to the study I 1.1.1 Historical Background I .1 .2 Theoretical perspective 2 1.1.3 Conceptual perspective 2 .1 .4 Contextual perspective 3... Continue Reading
    ABSTRACT The study intended to establish the relationship between Procurement contracts and compliance with procurement procedures among manufacturing industries in Uganda, a case of steel rolling mills in Jinja Municipality, Uganda This study was guided by three objectives; (i) To determine the extent of Procurement contracts. (ii) To determine... Continue Reading
    CONTENTS DECLARATION ......................................................................................................................................... ii APPROVAL ............................................................................................................................................... iii DEDICATION... Continue Reading
    TABLE OF CONTENT DECLARATION APPROVAL ii DEDICATION iii ACKNOWLEDGEMENT iv TABLE OF CONTENT v LIST OF ABBREVIATIONS ix ABSTRACT X CHAPTER ONE 1 GENERAL INTRODUCTION 1 1 .0 Introduction 1.1 Back ground of the study 1 1.2 Statement of the problem 3 1 .3 Objectives of the study 5 1.3.1 General objective 5 1.4 Research questions 5 1 .5 Scope of the... Continue Reading
    ABSTRACT This study investigated the effect of procurement practices on the performance of Local Governments in Uganda with specific reference to Bugiri District Local Government and it was guided by the following objective; i) to determine the level of customer orientation. ii) to determine the use of strategic supplier partnerships and, iii) to... Continue Reading
    ABSTRACT The researcher was interested to investigate on e-procurement and service delivery in organisations: a case study of Uchumi Supermarket, Kabalagala Branch. The researcher set objectives which were intended to; establish the benefits of e-procurement in delivering services to customers at Uchumi supermarket, to determine the factors... Continue Reading