ASSESSMENT OF PROJECT PLANNING PRACTICES AND ITS IMPACT ON CONTRACTORS PROFITABILITY

  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0010
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 1.5K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

The increased complexity of the society and high level of competition in the construction industry has made it imperative for contractors, project managers and construction companies to carry out serious planning in order to ensure project success and profits. This work examined project planning impact on a contractor’s profitability. The objectives were to identify project planning techniques and tools used by contractors in construction project delivery, determine factors affecting project planning practices of contractors, and to evaluate the impact of proper project planning on contractor’s profitability. The research approach involved survey design using structured questionnaire administered to 50 respondents in Owerri, Imo State, Nigeria. Spearman Ranked Correlation, Chi Square and other descriptive statistical methods were adopted for data analysis. The findings of the study revealed that Gantt chart with a mean score of 4.83 was the most commonly used tool used by contractors in project planning, and project funding not aligning with project plans with a mean score of 4.70 is the most common factor affecting project planning effectiveness. The hypothesis tests between level of use of project planning practices and contractors’ profitability using Spearman Ranked Correlation test indicated significant positive relationship between effective project planning and contractors’ profitability. The study concludes that project planning efforts influences contractor profitability in construction project delivery. The recommendations put forward were that project management teams should expose contractors to the relevance of project planning and its benefits. Clients should properly define their brief and contractor to avoid purchasing materials that won’t be used immediately in cases of installation of lifts that require heavy machinery and store houses.

CHAPTER ONE

INTRODUCTION

1.1       Background of the Study

Projects are used in all economic and non-economic fields as mean of organizing the activity, aiming the achievement of desired objectives. There is a direct relationship between projects, projects portfolio, programs and the organizational strategy. Projects, as the main way of creating and dealing with change (Cleland, Gareis, 2006), are used to implement strategies. Meskendahl (2010) refers to projects as the central building block used in implementing strategies, therefore business success is determined by the success of the projects. A project is an individual or collaborative enterprise, possibly involving research or design that is carefully planned, usually by a project team, to achieve a particular aim New York Time (2009). A project is also temporary because it has a defined beginning, end time, and defined scope and resources (Cathy, 2009). A project is unique because it is not a routine operation, but a specific set of operations designed to accomplish a singular goal. Based on these characteristics, carefully it is imperative to plan to achieve targeted outcome. Thus; Project planning can be defined as a part or branch of project management, which relates to the use of schedules to plan and subsequently report progress within the project environment.

Dubois and Gadde (2002) described the construction industry as decoupled and McKinsey (2017) confirmed that it is still true. The lack of coupling is present both between the construction project and its subcontractors as well as between the project and the parent company and other projects. This hampers the possibility to have a successful coordination of resources on a portfolio level within the contractor, as resources are in many cases utilised from a common resource pool (Engwall and Jerbrant 2003).The construction industry therefore embraces a wide range of loosely integrated organizations that collectively construct, alter and repair a wide range of different building and civil engineering projects. Individuals, organizations and government need to carry out some form of project planning for building and civil engineering project before embarking on whatever activity they are engaged to do. According to Lock (2002), the principal identifying characteristics of a project is its novelty, it’s a step unknown fraught with risk and uncertainty. No two projects are ever exactly alike and even a repeated project will differ from its predecessor in one or more commercial, administrative and physical aspect.

Construction is also characterized by time and cost intensive production processes which make it prone to project risks and failure, mainly in terms of time and cost. In practice, this means, that the performance of construction projects is usually low. In particular, construction projects are very often delayed and over budget. This is not just due to problems faced during project scheduling, but also during related processes.

ASSESSMENT OF PROJECT PLANNING PRACTICES AND ITS IMPACT ON CONTRACTORS PROFITABILITY
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0010
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 1.5K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Quantity Surveying
    Project ID QUS0010
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 50 Pages
    Format Microsoft Word

    Related Works

    BACKGROUND OF THE STUDY Projects are used in all economic and non-economic fields as mean of organizing the activity, aiming the achievement of desired objectives. There is a direct relationship between projects, projects portfolio, programs and the organizational strategy. Projects, as the main way of creating and dealing with change (Cleland,... Continue Reading
    CHAPTER ONE  INTRODUCTION  1.1 BACKGROUND OF THE STUDY AND ORGANIZATIONAL PROFILE  Seeley (1997) described the construction industry as one of the most important sectors of the economy, which integrates a wide variety of skilled and unskilled professionals. These professionals engage in the provision of goods and services ranging from... Continue Reading
    ABSTRACT Cost estimating is a key activity in quantity surveying profession and in contractor's organisation. The research work is to investigate into current cost estimation practices of contractors in Akwa Ibom state. The objectives were to identify the techniques used in cost estimating by the... Continue Reading
    CHAPTER ONE:  INTRODUCTION 1.1 Background Uganda has got many Small and Medium Sized Contractors (SMSC) engaged in the construction business. Some of these (SMSC) change business name and scope within a short time because of the competitiveness pressures within the construction industry. Little is achieved by these struggling SMSC due to the... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Shash (1993) explains that a construction company can either negotiate with the client or use a competitive tendering process to obtain a contract. Fu and Drew (2002) suggest that competitive tendering is the most common method used for contractor selection. In competitive tendering process, a... Continue Reading
    ABSTRACT The way we work in our fast-paced world is quickly changing. Skilled but unemployed Kenyans are seeking and finding work on online platforms on contract and full – time basis. They are part of virtual teams that rely heavily on collaborative software applications to work. Their performance is gauged by how they meet project goals within... Continue Reading
    ABSTRACT This study focuses on the  Assessment of strategic planning practices on organisational performance of selected banks in Ondo state, Nigeria. The objectives of this study are: to examine how strategic planning affects organizational performance, to assess the current strategic planning being implemented by the selected banks and to... Continue Reading
    4.1 Introduction…………………………………………………………………....49 4.2 Analysis and presentation of data……………………………………………49 4.2.1 Respondents distribution and returned characteristics …………………….49-50 4.2.2 Respondents Socio-economic Characteristics... Continue Reading
    CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal... Continue Reading
    . CASE STUDY OF SME OPERATORS IN ILORIN METROPOLIS CHAPTER ONE INTRODUCTION 1.1.           BACKGROUND TO THE STUDY Business Enterprises (SMEs) are seen as a driving force for the promotion of an economy (Khan and Jawaid, 2004) and they contribute immensely... Continue Reading
    Call Us
    whatsappWhatsApp Us