A SURVEY OF COST ESTIMATING PRACTICES OF CONSTRUCTION CONTRACTORS

  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0044
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 1.5K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

Cost estimating is a key activity in quantity surveying profession and in contractor's organisation. The research work is to investigate into current cost estimation practices of contractors in Akwa Ibom state. The objectives were to identify the techniques used in cost estimating by the construction contractors, identify the causes of inaccuracy in construction contractors cost estimates and determine cost estimating risks influencing construction project estimates. Relevant literature on current cost estimating practices of construction contractors were reviewed and an exploratory field survey was undertaken to examine the objectives of the study. A total of 159 questionnaires were distributed to construction contractors, of which 127 completed questionnaires were returned, representing a 81.41% response rate. The data obtained from field survey was analysed using mean item score. The study shows that group decision making, expert judgment and reserve analysis are the most frequently used technique of construction cost estimating employed by contractor. The major causes of inaccuracy in cost estimating are unforeseen change in prices of materials, Lack of experience on similar project and instability of market condition. The result also shows that the major risk factors in construction cost estimating include variations in labour productivity data, estimator’s deficiency and error in design and specification. The study recommends that construction contractors and estimators should ensure that a frequent market survey are done for material and labour before estimating is done.

A SURVEY OF COST ESTIMATING PRACTICES OF CONSTRUCTION CONTRACTORS
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0044
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 1.5K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Quantity Surveying
    Project ID QUS0044
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 50 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT The increased complexity of the society and high level of competition in the construction industry has made it imperative for contractors, project managers and construction companies to carry out serious planning in order to ensure project success and profits. This work examined project planning impact on a contractor’s profitability.... Continue Reading
    ABSTRACT This study determined the influence of estimating practice on cost performance of building projects. The objectives were to identify the estimating practices used by cost consultants, appraise the critical factors influencing estimating practice used, and to determine the influence of estimating practice on cost performance. The study... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Shash (1993) explains that a construction company can either negotiate with the client or use a competitive tendering process to obtain a contract. Fu and Drew (2002) suggest that competitive tendering is the most common method used for contractor selection. In competitive tendering process, a... Continue Reading
    ABSTRACT Construction works estimate inaccuracies and none performance have made the imprecise cost estimating practice subjective. This study assessed the dimensions of cost estimating risks influencing building projects’ estimates. The objectives were to identify sources of cost estimating risks; determine critical risk influencing building... Continue Reading
    ABSTRACT Construction works estimate inaccuracies and none performance have made the imprecise cost estimating practice subjective. This study assessed the dimensions of cost estimating risks influencing building projects’ estimates. The objectives were to identify sources of cost estimating risks; determine critical risk influencing building... Continue Reading
    ABSTRACT The importance of estimating process when dealing with construction projects cannot be over- emphasized. That is why, the greatest problem facing Quantity Surveying practice globally is that of achieving a correlation between conceptual estimate and the final project cost which is often used by some employers to determine the efficiency... Continue Reading
    ABSTRACT The importance of estimating process when dealing with construction projects cannot be over- emphasized. That is why, the greatest problem facing Quantity Surveying practice globally is that of achieving a correlation between conceptual estimate and the final project cost which is often used by some employers to determine the efficiency... Continue Reading
    CHAPTER ONE 1.0 INTRODUCTION 1.1 BACKGROUND OF THE STUDY The growing need for construction of all types coupled with a tight monetary supply has provided the construction industry with a big challenge to cut cost. Nigerian construction industry is faced... Continue Reading
    ABSTRACT  Maintaining steady cost projection on construction projects had been until recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial Cost plan, had been prevalent on Construction sites. However, little or no efforts has made to curtail the phenomenon, it is against this background that... Continue Reading
    Construction industry in Nigeria had been a major source of employment for 70% of labour in the country, thus it controls the capital flow, as well as labour resources, which has cost implications. Adequate management of these resources is considered an important aspect of project works; so also if the resources are adequately harnessed, issues... Continue Reading
    Call Us
    whatsappWhatsApp Us