CONSTRUCTION OF A CHEMICAL RACK, STUDY APPARATUS

  • Type: Project
  • Department: Chemical Engineering
  • Project ID: CNG0032
  • Access Fee: ₦5,000 ($14)
  • Chapters: 4 Chapters
  • Pages: 28 Pages
  • Methodology: Descriptive method
  • Reference: YES
  • Format: Microsoft Word
  • Views: 2.5K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
CONSTRUCTION OF A CHEMICAL RACK, STUDY APPARATUS
ABSTRACT

            The construction of the 500 gallous (2,250 litre) of water is a project which has definite mathematical patterns. The choice of a cylindrical pattern of design involved the application of mathematical deductions to analyse the size of materials required.
The introductory and scope of the project emphasized the construction and installation of a reservoir for water that could supply a community with water. The tank’s installed and kept on a circular stand bass t avoid the reshape of the bottom and of the tank.
The project studied the industrial applications of the project with specific  choices of material of construction. The sequence of construction and the procedure of installation suggested that the project has been completed for use in the storage.
The cost of fabrication of this cylindrical type is cheaper than what is obtained in the open market. The cost effectiveness of the construction makes the project very necessary; the recommendation for improvement on future constructions.
TABLE OF CONTENT
CHAPTER ONE                   
1.0              INTRODUCTION                                                                            
1.1       SCOPE OF THE PROJECT                         
CHAPTER TWO
2.0              types of reservoirs                                                      
2.1       industrial and domestic use of reservoir        
2.2              materials of construction for different types –
of reservoirs                                                   
2.3              design factors for construction                      
CHAPTER THREE
3.0              Procedure for construction of 500 gallons 2250 liters8
3.1       installation procedure for the tank                 
3.2              cost estimate/evaluation                                 
CHAPTER FOUR
4.0              RECOMMENDATIONS                              
Conclusion                             
References                                         
CHAPTER ONE
1.0              INTRODUCTION
Reservoirs are forms of storages vessels.
Reservoirs are used for different purposes ranging from use in the chemical industries to use in the domestic homes of different chemical and physical properties others are used for the storage of solids and semi-finished items.
They are reservoirs that are designed in the form of silos for the storage of Agricultural equipments and even industries products.
Some reservoirs are sued in the cryogenic storages. Storage containers that are used for storing cryogenic substances are designed 10 percent volume larger than the substance so as to reduce rapid build up of pressure in the container.
The major problems of most reservoirs is leakage. Leakage usually result when controlled resulting to the collapse of a section. It might equally result from the rushing of a part of the container.
1.1              SCOPE OF THE PROJECT
The scope of the project is the design of a 2.5m3 reservoir for holding water with the following requirements;
i.                    ability to withstand corrosion
ii.                  cost should be comparable to what is obtainable in the open market
iii.                with the capacity to be used for hygienic water storage
iv.                should not be constructed of a material that can easily breakdown on any impact of stress or be subjected to easy leakage of water
v.                  should be installed on a support after construction.
  
CONSTRUCTION OF A CHEMICAL RACK, STUDY APPARATUS
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Chemical Engineering
  • Project ID: CNG0032
  • Access Fee: ₦5,000 ($14)
  • Chapters: 4 Chapters
  • Pages: 28 Pages
  • Methodology: Descriptive method
  • Reference: YES
  • Format: Microsoft Word
  • Views: 2.5K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Chemical Engineering
    Project ID CNG0032
    Fee ₦5,000 ($14)
    Chapters 4 Chapters
    No of Pages 28 Pages
    Methodology Descriptive method
    Reference YES
    Format Microsoft Word

    Related Works

    ABSTRACT The construction of the 500 gallous (2,250 litre) of water is a project which has definite mathematical patterns. The choice of a cylindrical pattern of design involved the application of mathematical deductions to analyse the size of materials required. The introductory and scope of the... Continue Reading
    CONSTRUCTION OF A “CHEMICAL RACK” ABSTRACT The project done was a metal chemical rack. The rack was made of steel, which is soft to cutting, blending and several other operations applied to the metal during construction. The main purpose of constructing this metal rack is to be used for storing chemicals in the laboratory for easy... Continue Reading
    ABSTRACT This project report is on the construction of a metal rack which can be put to use in laboratories, industries, shops, kitchens, and also for displaying various articles. The construction work was done in a mechanical work shop. Racks are of various types which concides with the numerous uses to which they are... Continue Reading
    ABSTRACT This project was constructed with the desired materials of construction. The materials include aluminum, glass and wood. Aluminum was used in forming the skeleton of the structure, glass was used for the doors while wood was used in the sides, top, base and partitions. After building the skeleton of the... Continue Reading
    Abstract Working adults and university students find it difficult to complete their laundry in a day because of the unpredictable weather conditions in the tropics of West Africa. There are existing drying machines, but these machines are either not smart or they are hard to install and maintain and they cause easy damage to the clothes. In... Continue Reading
    ABSTRACT This project is focused on experimental analysis of impact of water jet on vanes. This work intends to predict the output of a pelton wheel, and to determine its optimum rotational speed. Hence this work explains how the deflection of the jet generates a force on the buckets, and how the force is related to the rate of momentum flow in... Continue Reading
    CONSTRUCTION OF A PILOT MOTORISED MIXER A REPORT PRESENTED TO THE DEPARTMENT OF CHEMICAL ENGINEERING OF THE INSTITUTE OF MANAGEMENT AND TECHNOLOGY, ENUGU ABSTRACT A motorized mixer of 200 liters capacity was constructed to have the capability of mixing 200 liters of fluid during operation. The construction of the mixer involves the preliminary... Continue Reading
    ABSTRACT A temperature control apparatus an “Armfield model was refurbished. The methodology employed were to detect the pulty parts of the equipment especially in the sump where leakages were observed. In the repair, the water in the sump was drained off, corrosion and rusting in the tank were... Continue Reading
    ABSTRACT This study examined the effects of chemical pre-milling treatment on the physico-chemical as well as pasting properties of Mucuna sloanei ‘ukpo’ flour. The seeds were treated with Distilled water, Citric Acid, Sodium bicarbonate, and Sodium Chloride solutions at various levels of concentration (1% 2.50%, 5% 7.5%, 10% w/v) before... Continue Reading
    ABSTRACT The objective of the repair and refurbishing the pilot plant temperature control equipment is to keep the apparatus in good working condition for it to be used for its various purposes. The part of the temperature control changed and new one installed. This was due to series of faults developed by the former one” Electrical accessories... Continue Reading
    Call Us
    whatsappWhatsApp Us