REDESIGNING A SECTION OF HAMU-MUKASA ROAD FROM SIR ALBERT COOK ROAD, MENGO MARKET JUNCTION TO CANON APOLLO ROAD

  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0166
  • Access Fee: ₦5,000 ($14)
  • Pages: 85 Pages
  • Format: Microsoft Word
  • Views: 387
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT Hamu - Mukasa road, just like most other roads in Kampala city has a number of defects such as potholes, cracks, ravels aggregate polishing, and many more accompanied by lack of drainage which in turn facilitate the high traffic congestion and delays, especially at peak demand periods in addition to comfortability and unsafeness of the road users. Due to the strategic location and importance of the road as it provides access to institutions of learning such as Muteesa 1 Royal University, Buganda Royal Institute, and sir Apolo Kaggwa Primary school. This has been a basis for the redesign. This report is a presentation of the entire design processes and activities we as a team engaged in during our final year project for the award of a bachelor’s degree in civil engineering. The report contains five chapters with the first chapter all about the introduction and the project background. In this, the location of the project road was defined together with the problem statement and the specific objectives to be achieved in order to overcome the problems. The second chapter is of the literature review. This describes the various types and classification of roads in Uganda, and the different methodologies adopted during the design of this project plus recognizing works done by different researchers and writers towards highway design development. (Geometrical and structural). These methodologies mainly discussed in this chapter are the AASHTO 2001 and AASHTO 1993 for the geometrical and structural design respectively. The third chapter is all about the methodology i.e. the various methods used to meet the set specific objectives in chapter one. The fourth chapter is about the results from the methods in the third chapter together with their discussion and engineering judgments as far as pavement design is concerned and then the design of the road is done here. The final chapter is the fifth that includes success incurred during the entire process, challenges together with the recommendations made where applicable. This chapter is closed by various references from where our research was based and followed by the appendices. In the appendices, are various tables mainly of results from laboratory test that were being used in the calculation of engineering parameters for the design models being used.

REDESIGNING A SECTION OF HAMU-MUKASA ROAD FROM SIR ALBERT COOK ROAD, MENGO MARKET JUNCTION TO CANON APOLLO ROAD
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0166
  • Access Fee: ₦5,000 ($14)
  • Pages: 85 Pages
  • Format: Microsoft Word
  • Views: 387
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Civil Engineering
    Project ID CVE0166
    Fee ₦5,000 ($14)
    No of Pages 85 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT Hamu - Mukasa road, just like most other roads in Kampala city has a number of defects such as potholes, cracks, ravels aggregate polishing, and many more accompanied by lack of drainage which in turn facilitate the high traffic congestion and delays, especially at peak demand periods in addition to comfortability and unsafeness of the... Continue Reading
    ABSTRACT The aim of this design work is to allow traffic light to rotate over a designated time interval between the two roads concerned i.e IMT and ESUT Junction. This design will control and monitor devices and cars within its environment i.e the junction. It will as well steer small vehicles showing them how to obey the traffic instructions... Continue Reading
    ABSTRACT The aim of this design work is to allow traffic light to rotate over a designated time interval between the two roads concerned i.e IMT and ESUT Junction. This design will control and monitor devices and cars within its environment i.e the junction.  It will as well steer small vehicles showing them how to obey the traffic instructions... Continue Reading
    ABSTRACT The major objective of this research is to examine the variation patterns of road traffic accident in Ilorin-Omu- Aran Road, Kwara State. The study used secondary data of Accident records and vehicular situation were obtained from the Nigeria police force (NPF) and Federal Road Safety Commission (FRSC).  Chapter one of the projects deals... Continue Reading
      ABSTRACT This thesis on a project undertaken by the author is aimed at providing explanation of the basic theory of the work of road design and its associated activities also, to cover practical methods of working. In pursuit of the meaningful completion this project a lot of investigation was embarked with principles and practice of road... Continue Reading
    Abstract This research was primarily conducted to identify and highlight the potency of the various communication strategies adopted by the Federal Road Safety Corps in its drive to reduce the spate of road crashes in Nigeria. Safety awareness campaigns are initiated but do not produce the desired target of absolute reduction of road crashes... Continue Reading
    CHAPTER ONE 1.1    INTRODUCTION 1.2     The federal Road Safely Commission keeps data and information of some kind. In this regard, the whole Jot of booking and recording of road traffic offenders', and other road safety management information systems are being stored and proc1.:sscd in some form. Frank, M. Lin (1996) gave the definition of... Continue Reading
    ABSTRACT This project entitled “Rehabilitation of Road” is aimed at investigating the causes of failure on the road linking Federal Secretariat, IMT Civil soil lab to Industrial Centre IMT Campus III Enugu and the possible way of re-designing it for its effective use by IMT community and visitors of IMT. But before the road is being... Continue Reading
    REHABILITATION OF ROAD LINKING UMUEKULUMMIRI STREET TO IMT AWARNESS GROUND JUNCTION IMT CAMPUS III ENUGU ABSTRACT This project entitled “Rehabilitation of Road” is aimed at investigating the causes of failure on the road linking Federal Secretariat, IMT Civil soil lab to Industrial Centre IMT Campus III Enugu and the possible way of... Continue Reading
    ABSTRACT This project entitled “Rehabilitation of Road” is aimed at investigating the causes of failure on the road linking Federal Secretariat, IMT Civil soil lab to Industrial Centre IMT Campus III Enugu and the possible way of re-designing it for its effective use by IMT community and visitors of IMT.  But before the road is being... Continue Reading
    Call Us
    whatsappWhatsApp Us