DESIGN AND SIMULATION OF TRAFFIC CONTROL SYSTEM FOR A T-JUNCTION A CASE STUDY OF ESUT-IMT ROAD JUNCTION

  • Type: Project
  • Department: Computer Science
  • Project ID: CPU1367
  • Access Fee: ₦5,000 ($14)
  • Pages: 54 Pages
  • Format: Microsoft Word
  • Views: 1.3K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT

The aim of this design work is to allow traffic light to rotate over a designated time interval between the two roads concerned i.e IMT and ESUT Junction. This design will control and monitor devices and cars within its environment i.e the junction. 
It will as well steer small vehicles showing them how to obey the traffic instructions coming from the traffic signals. The system is designed to operate in a red time mode to monitor the volume of traffic light. 
The project will determine whether any of the devices is defective and of the same time, send signals to indicate faulty devices. The software also includes the maintenance of these devices giving warning signs wherever a fault is detected. 
The software is designed to detect the flow of traffic showing how and when vehicles will be passed or in order words, it is the aim of the project to solve problems as a result of manual and simulate the existing system into a new system.

TABLE OF CONTENTS

Title Page
Certification 
Dedication 
Acknowledgement 
Abstract 
Organization of the work

CHAPTER ONE
1.0 Introduction
1.1 Statement of problem 
1.2 Purpose of the study
1.3 Aims and objectives 
1.4 Scope or Delimitations 
1.5 Limitations and constraints 
1.6 Assumptions
1.7 Definition of terms 

CHAPTER TWO
2.0 Review of related literature 

CHAPTER THREE
Description and analysis of the existing system 
3.1 Fact finding methods 
3.2 Organizational structure  
3.3 Objectives of the existing system
3.3 Input, process, output analysis
3.4 Input, process, output analysis
3.5 Information flow diagram
3.6 Problems of the existing system
3.6 Justification of the new system

CHAPTER FOUR
Design of the new system 
4.1 Output specification and design 
4.2 Input specification and design
4.3 File design 
4.4 Procedure chart 
4.5 System flowchart
4.6 System requirement

CHAPTER FIVE
Implementation 
5.1 Program design 
5.2 Source program  
5.3 Program flowchart  
5.4 Pseudocades
5.5 Test run

CHAPTER SIX           
Documentation 
6.1 System documentation
6.2 Program documentation
6.3 User documentation

CHAPTER SEVEN
Conclusion and Recommendation
7.1 Conclusion 
7.2 Recommendation 
Bibliography

DESIGN AND SIMULATION OF TRAFFIC CONTROL SYSTEM FOR A T-JUNCTION A CASE STUDY OF ESUT-IMT ROAD JUNCTION
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Computer Science
  • Project ID: CPU1367
  • Access Fee: ₦5,000 ($14)
  • Pages: 54 Pages
  • Format: Microsoft Word
  • Views: 1.3K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Computer Science
    Project ID CPU1367
    Fee ₦5,000 ($14)
    No of Pages 54 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT The aim of this design work is to allow traffic light to rotate over a designated time interval between the two roads concerned i.e IMT and ESUT Junction. This design will control and monitor devices and cars within its environment i.e the junction.  It will as well steer small vehicles showing them how to obey the traffic instructions... Continue Reading
    ABSTRACT The aim of this design work is to allow traffic light to rotate over a designated time interval between the two roads concerned i.e IMT and ESUT Junction. This design will control and monitor devices and cars within its environment i.e the junction. It will as well steer small vehicles showing them how to obey the traffic instructions... Continue Reading
    ORGANIZATION OF WORK This project has seven chapters. Each chapter deals with the chapter one. This chapter introduces the statement of the problem purpose of this study. The aims and objectives of the program. The scope, limitations and constraints, assumptions of program, and the... Continue Reading
    ABSTRACT Hamu - Mukasa road, just like most other roads in Kampala city has a number of defects such as potholes, cracks, ravels aggregate polishing, and many more accompanied by lack of drainage which in turn facilitate the high traffic congestion and delays, especially at peak demand periods in addition to comfortability and unsafeness of the... Continue Reading
    ABSTRACT T-junction traffic light controller is such a device that will play a significant role in controlling traffic at junctions, to ease the expected increased rush at such junctions and reduce to minimum disorderliness that may arise, as well as allowing the... Continue Reading
    ABSTRACT T-junction traffic light controller is such a device that will play a significant role in controlling traffic at junctions, to ease the expected increased rush at such junctions and reduce to minimum disorderliness that may arise, as well as allowing the pedestrians a right of the way at intervals rather than being struck down when in a... Continue Reading
    ABSTRACT T-junction traffic light controller is such a device that will play a significant role in controlling traffic at junctions, to ease the expected increased rush at such junctions and reduce to minimum disorderliness that may arise, as well as allowing the... Continue Reading
    ABSTRACT T-junction traffic light controller is such a device that will play a significant role in controlling traffic at junctions, to ease the expected increased rush at such junctions and reduce to minimum disorderliness that may arise, as well as allowing the pedestrians a right of the way at intervals rather than being struck down when in a... Continue Reading
    ABSTRACT T-junction traffic light controller is such a device that will play a significant role in controlling traffic at junctions, to ease the expected increased rush at such junctions and reduce to minimum disorderliness that may arise, as well as allowing the pedestrians a right of the way at intervals rather than being struck down when in a... Continue Reading
    ABSTRACT This project entitled “Rehabilitation of Road” is aimed at investigating the causes of failure on the road linking Federal Secretariat, IMT Civil soil lab to Industrial Centre IMT Campus III Enugu and the possible way of re-designing it for its effective use by IMT community and visitors of IMT. But before the road is being... Continue Reading
    Call Us
    whatsappWhatsApp Us